Goals for Phase 2 of the MN Prairie Recovery Program were to: protect 1200 acres native prairie/savanna; restore 250 acres grassland; enhance 6000 acres grassland/savanna with fire, invasive species removal, and grazing; and continue a new prairie conservation model.
To hire a qualified interpretive specialist to develop an interpretive plan for the history along 287 miles of the Minnesota River Valley National Scenic Byway.
Minnesota Trout Unlimited volunteers, chapters and partners will enhance habitat for fish, game and wildlife in and along numerous coldwater streams on existing Aquatic Management Areas and other public lands around the state, while leveraging approximately $3 million for this.
This Minnesota Forests for the Future project protected 3,293 acres of forest and forested wetlands with perpetual working forest conservation easements in Lake and Crow Wing Counties ensuring public benefits, management access and sustainable managed forests.
The Mississippi Headwaters Board (MHB) will work with the Board of Water & Soil Resources (BWSR), The Trust for Public Land (TPL), headwaters' counties and Soil & Water Conservation Districts (SWCDs) to protect and preserve targeted upland and aquatic habitats through fee title and permanent easement acquisition in high quality shoreland areas along the Mississippi River main stem, headwaters' reservoirs, and major Mississippi River tributaries.
The goal of this project is to simulate up to ten scenarios using the recently completed Hydrologic Simulation Program FORTRAN (HSPF) model for the Mississippi River–Lake Pepin (MRLP) watershed. The mode will be used to investigate a variety of management scenarios to support further planning work and implementation in the watershed. Model scenarios are being developed to inform 1W1P planning activities and future implementation.
The Mississippi Headwaters Habitat Corridor Project Phase III (ML 17) achieved permanent protection of 1,694 acres of critical fish and wildlife habitat, including 14.5 miles of shoreland on the Mississippi River and adjacent lakes/tributaries. This accomplishment exceeded the appropriation goal by over 200%. Fee-title acquisitions and RIM conservation easements adjacent to public land created or expanded large habitat protection complexes, including a new 232 acre WMA in Crow Wing County.
In Phase 6, The Mississippi Headwaters Board in partnership with The Trust for Public Land and BWSR assisted by 8 County SWCDs will permanently protect an additional 1,235 acres of critical fish and wildlife habitat along the first 400 miles of the Mississippi River, its major tributaries, and 9 headwaters lakes.
This project will build a working watershed SWAT model that can readily be used by the MPCA to provide information to support conventional parameter TMDLs and to identify critical areas for BMP installation/evaluation that can be supported by the efforts of the local Farmer Led Council as well as other land owners within the Mississippi River-Winona watershed.
The Mississippi Headwaters Board in partnership with The Trust for Public Land and the Minnesota Board of Water and Soil Resources, assisted by 8 County Soil and Water Conservation Districts, will continue to permanently protect critical shorelands and wildlife habitats along the first 400 miles of the Mississippi River. Fee title acquisitions and conservation easements on priority lands will create and expand contiguous habitat corridors/complexes and reduce forest fragmentation from development to benefit fish, game and non-game wildlife, and migratory waterfowl.
Whitewater Watershed Project will work in coordination with Winona County, Root River (Houston County) Soil and Water Conservation District (SWCD), and Wabasha County SWCD to collect water quality and chemistry parameters on eight Minnesota Pollution Control Agency (MPCA) approved stream sites and two lake sites within the Mississippi River Winona/La Crescent watershed during the 2020-2021 sampling season. Parameters to be tested include: TSS, TP, Chloride, CaCO3 (hardness), E. Coli, Chl - a corrected for Pheo, hardness, specific conductance, clarity, temperature, pH, DO.
Maritime Heritage Minnesota completed a side and down imaging sonar survey of 104 miles of the Mississippi River in Aitkin County, as well as a small portion of Itasca County when the river meandered across the county line, in August 2010.
The DNR has been charged by the legislature to develop rules that protect and manage the Mississippi River Corridor Critical Area (MRCCA) for natural resource, economic development, transportation, historic preservation, and other values. This project engages stakeholder groups in a public process to balance regulatory protections with local flexibility and control.
This project will focus on creating a watershed identity, monitoring & assessment, stressor ID assistance, Total Maximum Daily Load (TMDL) report development, Watershed Restoration & Protection Strategy (WRAPS) report development, watershed prioritization and targeting, and the continuation of the Civic Engagement components of the project. Currently, this watershed has seven listed conventional impairments (Lake Eutrophication); however, it is possible that additional stream impairments (up to four) may be identified during the IWM process.
Phase 1 of this project is primarily geared towards project planning and coordination among project partners, developing an initial civic engagement strategic plan, holding a watershed kick-off meeting, and gathering and summarizing available water quality data.