All Projects

277 Results for
Recipient
Board of Water and Soil Resources
2011 Fiscal Year Funding Amount
$368,000


PROJECT OVERVIEW

Statewide
Recipient
BWSR with Pheasants Forever
2013 Fiscal Year Funding Amount
$2,090,000
Fund Source

RIM Buffers Phase II combined the resource benefits of the Outdoor Heritage Fund (LSOHC), Clean Water Fund (CWF), and bond funds. This program enrolled a total of 1,336.7 acres of enhanced wildlife and water quality buffers in partnership with private landowners on 29 easements. With 1337 acres (all sources of funding) protected and restored in this phase, we exceeded the original goal of 400 acres of OHF funded buffers and 400 acres of CWF funded buffers. Bonding dollars were used to fund the remaining 537 acres.

Statewide
Recipient
BWSR
2015 Fiscal Year Funding Amount
$2,110,800
Fund Source

The Clean Water Fund and OHF were used together to secure easements on buffer areas. Seven easements were recorded for a total of 606.5 acres. These acres represent 303.1 acres funded by OHF and 303.4 acres funded by non-OHF sources. Only the OHF acres are being reported in this final report to be consistent with the approved accomplishment plan.

Cottonwood
Grant
Jackson
Kandiyohi
Nobles
Renville
Yellow Medicine
Recipient
Board of Water and Soil Resources
2012 Fiscal Year Funding Amount
$2,249,000
Fund Source

RIM Buffers Phase 1 combined the resource benefits of the Outdoor Heritage Fund (LSOHC), Clean Water Fund (CWF), and bond funds. This program exceeded our acreage goal by 439 acres (37%), enrolling a total of 1,595.4 acres of enhanced wildlife and water quality buffers in partnership with private landowners on 46 easements.

Statewide
Recipient
Bois de Sioux Watershed District
2013 Fiscal Year Funding Amount
$258,280
Fund Source

The Mustinka River winds through five counties in west central Minnesota and empties into Lake Traverse, a border waters lake with excellent fishing and recreational opportunities. For several years, sections of the river have been negatively impacted from too much soil/sediment eroding from the land and washing away into the water. Excess sediment degrades aquatic habitat and feeds algae blooms. This project continues a 2012 Clean Water Fund collaborative effort to develop a plan to reduce the amount of sediment washed into the river.

Big Stone
Grant
Otter Tail
Stevens
Traverse
Wilkin
Recipient
Bois de Sioux Watershed District
2012 Fiscal Year Funding Amount
$333,200
Fund Source

The Mustinka River winds through five counties in west central Minnesota and empties into Lake Traverse, a border waters lake with excellent fishing and recreational opportunities. For several years, sections of the river have been negatively impacted from too much soil/sediment eroding from the land and washing away into the water. Excess sediment degrades aquatic habitat and feeds algae blooms.
This project continues a 2011 Clean Water Fund collaborative effort to develop a plan to reduce the amount of sediment washed into the river.

Big Stone
Grant
Stevens
Traverse
Wilkin
Recipient
Bois de Sioux WD
2022 Fiscal Year Funding Amount
$800,000
Fund Source
Grant
Traverse
Recipient
Bois de Sioux Watershed District
2011 Fiscal Year Funding Amount
$130,106
Fund Source

The Mustinka River winds through five counties in west central Minnesota and empties into Lake Traverse, a border waters lake with excellent fishing and recreational opportunities. For several years, sections of the river have been impaired for turbidity due to too much soil/sediment eroding from the land and washing away into the water. Excess sediment degrades aquatic habitat
and feeds algae blooms.

Big Stone
Grant
Otter Tail
Stevens
Traverse
Wilkin
Recipient
Bois de Sioux WD
2024 Fiscal Year Funding Amount
$1,000,000
Fund Source
Grant
Traverse
Recipient
Wright SWCD
2023 Fiscal Year Funding Amount
$1,120,477
Fund Source

The North Fork Crow River Watershed planning workgroup has based its comprehensive watershed management plan on seven planning regions. Each planning region has a list of prioritized resource concerns, measurable goals and implementation actions. Implementation actions are targeted in locations within each planning region, prioritized based on local concerns, programs, etc.

Kandiyohi
Meeker
Pope
Stearns
Wright
Recipient
Middle Fork Crow River WD
2018 Fiscal Year Funding Amount
$642,377
Fund Source
Wright
Recipient
Wright SWCD
2024 Fiscal Year Funding Amount
$1,518,486
Fund Source
Kandiyohi
Kittson
McLeod
Meeker
Morrison
Mower
Pope
Renville
Stearns
Traverse
Wright
Recipient
Board of Water and Soil Resources
2015 Fiscal Year Funding Amount
$335,000

Northern white cedar wetland plant communities provide unique ecological, economic, and wetland functions, including high value timber, long-term carbon storage, winter refuge for deer and other wildlife, wildlife habitat, and thermal buffering for brook trout streams. However, these plant communities have been declining in Minnesota for decades mostly as a result of development impacts. The Minnesota Board of Water and Soil Resources is using this appropriation to continue efforts aimed at improving the quantity and quality of white cedar wetland plant communities in Minnesota.

Aitkin
Beltrami
Carlton
Cass
Clearwater
Cook
Crow Wing
Hubbard
Itasca
Kanabec
Koochiching
Lake
Lake of the Woods
Mille Lacs
Pine
St. Louis
Wadena
Recipient
BWSR
2012 Fiscal Year Funding Amount
$125,000
2013 Fiscal Year Funding Amount
$125,000


PROJECT OVERVIEW

Aitkin
Beltrami
Carlton
Cass
Clearwater
Cook
Crow Wing
Hubbard
Isanti
Itasca
Kanabec
Koochiching
Lake
Lake of the Woods
Mille Lacs
Pine
St. Louis
Wadena
Recipient
Todd SWCD
2020 Fiscal Year Funding Amount
$81,909
Fund Source
Todd
Recipient
Big Stone SWCD
2020 Fiscal Year Funding Amount
$274,000
Fund Source
Big Stone
Recipient
Pomme de Terre River Association
2013 Fiscal Year Funding Amount
$480,228
Fund Source

The Pomme de Terre River watershed is located in west central Minnesota and occupies a portion of six counties. For many years surface water quality within the watershed has been a concern to local government. In 1982 the Pomme de Terre River Association Joint Powers Board (JPB) was formed to begin addressing this issue. In 2002 the Pomme de Terre River was placed on the Impaired Waters list for turbidity. The goal of the JPB is to improve the local water resources within the watershed through voluntary efforts and building relationships with local landowners.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Pomme de Terre River Association
2012 Fiscal Year Funding Amount
$350,470
Fund Source

The Pomme de Terre River watershed is located in west central Minnesota and occupies a portion of six counties. For many years surface water quality within the watershed has been a concern to local government. In 1982 the Pomme de Terre River Association Joint Powers Board was formed to begin addressing this issue. In 2002 the Pomme de Terre River was placed on the Impaired Waters list for turbidity. This project is a continuation of a 2011 Clean Water Fund project.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Pomme de Terre River Association JPB
2023 Fiscal Year Funding Amount
$717,428
Fund Source

PDTRA will use this funding to pursue goals stated in the CWMP. PDTRA has ID'd 5 priority areas to focus sediment & phosphorus reduction goals: Northern Lakes, Christina/Pelican Lakes, PDT River Lakes Chain, PDT River Corridor, & Drywood Creek. Plans include but aren't limited to: water & sediment control basins, alternative tile intakes, waste pit closures, grade stabilizations, livestock exclusions, shoreline restorations/stabilizations, cover crops.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Pomme de Terre River Association JPB
2021 Fiscal Year Funding Amount
$717,428
Fund Source
Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Pomme de Terre River Association Joint Powers Board
2011 Fiscal Year Funding Amount
$257,610
Fund Source

The Pomme de Terre River watershed is located in west central Minnesota and occupies a portion of six counties. For many years surface water quality within the watershed has been a concern to local government, and in 1982 the Counties and SWCDs within the watershed area formed the Pomme de Terre River Association Joint Powers Board to begin addressing this issue. In 2002 the Pomme de Terre River was placed on the Impaired Waters list for turbidity.The project partners are collaborating to improve surface water quality within the watershed with a grant from the Clean Water Fund.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Pomme de Terre River Association JPB
2014 Fiscal Year Funding Amount
$274,816
Fund Source

The goal of the Pomme de Terre River Association (JPB) is to improve local water resources within the watershed through targeted voluntary efforts and build strong relationships with local landowners, producers, and citizens. Utilizing the State's first Watershed Restoration and Protection Strategy, the JPB has targeted and identified specific areas and activities required for marked water quality improvement.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Pomme de Terre River Association JPB
2016 Fiscal Year Funding Amount
$115,248
Fund Source

The goal of the Pomme de Terre River Association (PDTRA JPB) is to improve the local water resources within the watershed through targeted voluntary efforts and the building of strong relationships with local landowners, producers, and citizens. To further our efforts in strategically working to achieve our reduction goals, listed in our Major Watershed Restoration and Protection Strategies Report and Turbidity Total Maximum Daily Load report, we would like to further define our Priority Management Zones through the development of a hydrological conditioned Digital Elevation Model.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Red River Watershed Mgmt Board
2014 Fiscal Year Funding Amount
$235,250
Fund Source

The Prioritization, Targeting, and Measuring Water Quality Improvement Application (PTMA) connects the general qualitative strategies in a Total Maximum Daily Load (TMDL) and Watershed Restoration and Protection (WRAP) and the identification of implementable on-the-ground Best Management Practices (BMPs). Leveraging geospatial data from the International Water Institute this application will be developed for two pilot areas within the Red River Basin.

Becker
Cass
Clay
Grant
Mahnomen
Norman
Otter Tail
Traverse
Recipient
Red River Watershed Management Board
2012 Fiscal Year Funding Amount
$194,490
Fund Source

This project will provide land and water managers in the Red River Basin with data and online tools to prioritize actions on the landscape that achieve water quality objectives identified in local and state plans. This will help identify strategically important locations for implementing erosion control and water management practices. Standardized watershed-based data products will be integrated into a web-based planning tool which will be added to the Red River Basin Decision Information Network (RRBDIN) being developed as part of the Red River Watershed Feasibility Study.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Itasca
Kittson
Koochiching
Lake of the Woods
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Otter Tail, East SWCD
2022 Fiscal Year Funding Amount
$706,488
Fund Source

Watershed based implementation funds will be used to target conservation practices utilizing the principles associated with Prioritize, Target and Measure as referenced in our Local Comprehensive Watershed Management Plan. The following are projects/practices, and their associated pollution reduction estimates, that are included in this budget request: (500 acres of Nonstructural BMPs) to protect/improve land management and reduce bacteria will reduce phosphorus by 65 lbs/yr, nitrogen by 520 lbs/yr, and sediment by 285 tons/yr.

Becker
Douglas
Otter Tail
Todd
Wadena
Recipient
Otter Tail, East SWCD
2021 Fiscal Year Funding Amount
$706,488
Fund Source
Becker
Douglas
Otter Tail
Todd
Wadena
Recipient
Carver Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$63,350
Fund Source

Hydes Lake is the headwaters to Carver Creek and is known for its excellent fishery. However, the lake has elevated nutrient levels which lead to poor water quality. A clean up plan for Hydes Lake has identified the need to reduce phosphorus loading by 81 percent from watershed sources.

Carver
Recipient
Wadena Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$91,305
Fund Source

A large portion of Wadena County has been identified as having a high or moderate probability of elevated nitrate concentrations. With almost all of the residents in Wadnea County getting there drinking water from groundwater sources, this issue is a top priority to the county. Through this project, nitrates and other water soluble contaminants leacing into sensitive sand plain aquifers will be reduced by providing cost-share incentives to encourage irrigation producers to convert high or medium pressure irrigation systems to low pressure systems.

Wadena
Recipient
Carver Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$32,600
Fund Source

Hydes Lake is the headwaters to Carver Creek and is known for its excellent fishery. However, the lake has elevated nutrient levels which lead to poor water quality. A clean up plan for Hydes Lake identified the need to reduce phosphorus loading by 81 percent from watershed sources.

Carver
Recipient
Otter Tail, East SWCD
2021 Fiscal Year Funding Amount
$217,300
Fund Source
Otter Tail
Wadena
Recipient
BWSR
2012 Fiscal Year Funding Amount
$1,645,000

PROJECT OVERVIEW
The Reinvest in Minnesota (RIM) Wetlands Reserve Program restores wetlands and grasslands through the purchase of permanent conservation easements on privately owned land. The easements limit future land use and put conservation plans in place for future management. The Minnesota Board of Soil and Water Resources is using this appropriation to accelerate the RIM Wetlands Reserve Program resulting in additional permanently protected wetlands and grasslands throughout the state.

OVERALL PROJECT OUTCOME AND RESULTS

Statewide
Recipient
BWSR
2010 Fiscal Year Funding Amount
$9,059,500
Fund Source

The RIM-WRP program will expand past efforts and provide important benefits to the citizens of Minnesota by restoring and permanently protecting priority wetlands and associated upland native grassland wildlife habitat via perpetual conservation easements. This funding will leverage $12.6 million of federal WRP funds for the State of Minnesota and is expected to create and sustain 343 jobs and income to local landowners, businesses and others in the state based on USDA economic estimates.

Becker
Big Stone
Blue Earth
Clay
Cottonwood
Douglas
Jackson
Kandiyohi
Mahnomen
McLeod
Norman
Pennington
Pope
Rice
Steele
Swift
Swift
Recipient
BWSR
2011 Fiscal Year Funding Amount
$6,895,000
Fund Source

The Reinvest in Minnesota (RIM) Reserve Wetlands Reserve Program (WRP) Partnership will accelerate the restoration and protection of approximately 4,620 acres of previously drained wetlands and associated upland native grassland wildlife habitat complexes via perpetual conservation easements. The goal of the RIM-WRP Partnership is to achieve the greatest wetland functions and values, while optimizing wildlife habitat on every acre enrolled in the partnership.

Big Stone
Blue Earth
Clay
Freeborn
Grant
Kandiyohi
Le Sueur
Mahnomen
Marshall
McLeod
Meeker
Murray
Norman
Otter Tail
Pope
Rice
Rice
Recipient
Baord of Water & Soil Resources
2012 Fiscal Year Funding Amount
$13,000,000
Fund Source

The RIM-WRP Partnership permanently protected 5,559 acres of priority wetlands and associated upland native grassland wildlife habitat via perpetual conservation easements on 60 sites and leveraged over $11 million of federal Wetlands Reserve Program funds.

Statewide
Recipient
BWSR; with US Dept of Ag; Ducks Unlimited
2015 Fiscal Year Funding Amount
$9,020,500
Fund Source

The Reinvest in Minnesota (RIM) Wetlands Partnership Phase VI protected and restored 1,391 acres of previously drained wetlands and adjacent grasslands on 15 conservation easements.

Brown
Lyon
Mahnomen
Murray
Nobles
Redwood
Renville
Roseau
Swift
Recipient
Carver County WMO
2023 Fiscal Year Funding Amount
$40,000
Fund Source

Since 2008, a ravine on the Northwest side of Reitz Lake has been eroding on a private parcel, causing sediment and nutrients to discharge into the waterbody. This project will stabilize a ravine that has formed from Airport Road down to Reitz Lake.

Carver
Recipient
Carver County Watershed Management Organization
2011 Fiscal Year Funding Amount
$127,551
Fund Source

The Reitz Lake restoration project began several years ago when water quality samples showed the lake was impaired. Carver County and residents around the lake took action and began to develop a plan (TMDL) to clean up Reitz Lake.Once the TMDL study and the associated implementation plan (which helps to target specific projects) were completed, funding was sought to target high priority projects around the Lake. First, direct untreated run-off from a farmed area of approximately 100 acres to the north of the lake will be slowed and filtered before it enters the lake.

Carver
Recipient
Riley-Purgatory-Bluff Creek
2013 Fiscal Year Funding Amount
$150,000
Fund Source

The goal of this project is to implement 10-15 medium sized projects that will infiltrate and reduce pollutant loads to the waters in the Riley-Purgatory-Creek Watershed District. The District intends to achieve this by using their Citizen Advisors who are well involved with local associations, City staff who are familiar with associations in their jurisdiction and also seek less-known association through various advertising methods. We intend to use staff knowledge to insure that the projects are suitable for the site and implemented correctly to maximize efficiency.

Carver
Hennepin
Recipient
Board of Water and Soil Resources
2013 Fiscal Year Funding Amount
$84,000
Fund Source

State law (M.L. 2011, First Special Session, Ch. 6) directs restoration evaluations to be conducted on habitat restoration projects completed with funds from the Clean Water Fund (M.S. 114.D.50 Subd. 6). The Board of Water and Soil Resources (BWSR) is responsible for convening a Restoration Evaluation Panel containing at least five technical experts who will evaluate a sample of up to 10 habitat restoration projects annually. The Panel will evaluate the restorations relative to the law, current science, stated goals and standards in the restoration plans, and applicable guidelines.

Statewide