North Fork Crow River FY2022 Watershed-Based Implementation Funding
The North Fork Crow River Watershed planning workgroup has based its comprehensive watershed management plan on seven planning regions. Each planning region has a list of prioritized resource concerns, measurable goals and implementation actions. Implementation actions are targeted in locations within each planning region, prioritized based on local concerns, programs, etc. Watershed-Based Implementation Funds will be utilized to implement plan actions through installation of structural best management practices and land management practices, providing funding assistance for partner technical/engineering assistance and project development, filling known data gaps and increasing education and awareness for sealing abandoned or unused wells. Well sealing, technical assistance funds and educational efforts will be utilized by the seven sub-watershed areas in the North Fork Crow River, while structural and non-structural ag BMPs have each been prioritized to targeted locations within each planning region. Subwatershed assessments will be completed within each planning region to refine PTMApp identified projects for implementation. Site data collected during the previous WBIF round of funding has been prioritized for practices including cattle exclusion, to reduce effects of in-stream erosion and sediment transport. Meeker County Ditch 47, part of the Middle Fork Crow River, will being construction on the first phase of a restoration project. Examples of structural practices utilized to meet sediment and phosphorus load reductions include grade stabilization structures, water and sediment control basins and grassed waterways; example non-structural practices to be applied include cover crops and conservation tillage. Utilization of these grant funds will provide estimated annual load reductions of 658 pounds of total phosphorus and 1,527 tons of sediment, which will be achieved through the establishment of structural and non-structural practices.
http://www.bwsr.state.mn.us/board
http://www.bwsr.state.mn.us/board
Annie Felix-Gerth
2019: (a) $13,591,000 the first year and $13,375,000 the second year are for performance-based grants with multiyear implementation plans to local government units. The grants may be used to implement projects that protect, enhance, and restore surface water quality in lakes, rivers, and streams; protect groundwater from degradation; and protect drinking water sources. Projects must be identified in a comprehensive watershed plan developed under the One Watershed, One Plan or metropolitan surface water management frameworks or groundwater plans. Grant recipients must identify a nonstate match and may use other legacy funds to supplement projects funded under this paragraph. 2021: (a) $21,197,000 the first year and $22,367,000 the second year are for performance-based grants with multiyear implementation plans to local government units. The grants may be used to implement projects that protect, enhance, and restore surface water quality in lakes, rivers, and streams; protect groundwater from degradation; and protect drinking water sources. Projects must be identified in a comprehensive watershed plan developed under the One Watershed, One Plan and seven-county metropolitan groundwater or surface water management frameworks as provided for in Minnesota Statutes, chapters 103B, 103C, 103D, and 114D. Grant recipients must identify a nonstate match and may use other legacy funds to supplement projects funded under this paragraph. This appropriation may be used for:
(1) implementation grants to watershed planning areas with approved plans, including but not limited to Buffalo-Red River, Cannon River, Cedar River, Clearwater River, Des Moines River, Hawk Creek, Lac qui Parle Yellow Bank, Lake of the Woods, Lake Superior North, Le Seuer River, Leech Lake River, Long Prairie River, Lower Minnesota River North, Lower Minnesota River West, Lower Minnesota River South, Lower St. Croix River, Marsh and Wild Rice, Middle Snake Tamarack Rivers, Mississippi East, Mississippi River Headwaters, Mississippi West, Missouri River Basin, Mustinka/Bois de Sioux, Nemadji River, North Fork Crow River, Otter Tail, Pine River, Pomme de Terre River, Red Lake River, Redeye River, Root River, Rum River, Sauk River, Shell Rock River/Winnebago Watershed, Snake River, South Fork Crow River, St. Louis River, Thief River, Two Rivers Plus, Vermillion, Watonwan River, Winona La Crescent, Yellow Medicine River, and Zumbro River; (2) seven-county metropolitan groundwater or surface water management frameworks; and (3) other comprehensive watershed management plan planning areas that have a board-approved and local-government-adopted plan as authorized in Minnesota Statutes, section 103B.801.
The board may determine whether a planning area is not ready to proceed, does not have the nonstate match committed, or has not expended all money granted to it. Upon making the determination, the board may allocate a grant's proposed or unexpended allocation to another planning area to implement priority projects, programs, or practices.
Estimated annual load reductions of 658 pounds of total phosphorus and 1,527 tons of sediment, which will be achieved through the establishment of structural and non-structural practices. Stabilization of 3000 lin feet of the Middle Fork Crow River.
LOCAL LEVERAGED FUNDS