As part of the FY 2012 funding cycle, the Board of Water and Soil Resources granted funds for development of the Water Quality Decision Support Application (WQDSA). The WQDSA will provide land and water managers with geospatial data and online tools to prioritize, market, and implement actions on the landscape to achieve water quality objectives identified in local and state water plans and to ensure that public funding decisions are strategic and defensible.
International Water Institute (IWI) staff will monitor 24 sites in the Bois de Sioux, Mustinka (2 sites), Buffalo (8 sites), Red Lake (4 sites), Sandhill (3 sites), Thief (2 sites), and Tamarac River (3 sites) Watersheds intensively over a 2 year period in an attempt to collect 25 samples per year at each site. If conditions allow for the collection of all planned samples, 1200 stream samples will be collected over the time period. Monitoring will include field measurements, observations, and at least three photographs during each site visit.
The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.
Capitol Region Watershed District (CRWD), in partnership with the City of Roseville, will construct a volume reduction/capture-reuse irrigation facility below the Upper Villa Park Softball field in the City of Roseville. This project will protect Lake McCarrons and the Villa Park Wetland System (VPWS) by reducing runoff volumes and the pollutants associated with urban stormwater such as Total Phosphorus (TP), Total Suspended Solids (TSS), heavy metals, and petroleum products among others.
The Rice Creek Watershed District (RCWD) will create a web-based, mobile-compatible public drainage system inspection and maintenance database. This database system will enable District staff to create and track maintenance requests and inspections from the field, including Geo-referencing locations requiring repair via a mobile device. The system will greatly reduce the time required to identify and log each maintenance request, enabling staff to inventory more miles of public drainage system yearly thereby identifying erosion problems more efficiently and thoroughly.
Rice Lake, in Stearns County, is an impaired water for nutrients that has a Total Maximum Daily Load (TMDL) Implementation plan developed. Rice Lake is one of the larger lakes in the county, offering major water recreation opportunities, economic benefits as well as fish and wildlife habitat. It is a priority for Stearns County to implement projects that have positive impacts on this resource.
This project will engage the public and community partners in Rice County. The goal of this project is the implementation of conservation practices that retain water on the land by providing up to five sub-grants for rain gardens, vegetative buffers, and wetland restorations.
The Reinvest in Minnesota (RIM) Wetlands Partnership Phase V protected and restored 2,041 acres of previously drained wetlands and adjacent native grasslands on 23 conservation easements. All easements have been recorded. $35,000 of funds from other sources were also used.
Lilydale-Harriet Island Regional Park. Continued phased implementation of approved Lilydale Regional Park Master Plan elements that may include such amenities as construction of approx. 3,000 lineal feet of roadway, trail, and related facilities. Lilydale
Como Regional Park. Continue implementation of the Master Plan to include completion of Estabrook Road reconstruction and installation of Historic Lantern-style lighting from west end of the Frog Pond to intersection at Lexington Parkway.
To hire a qualified historian to conduct a conditions assessment of St. Stefan Romanian Orthodox Church, listed in the National Register of Historic Places.
The Ramsey-Washington Metro Watershed District (District) has determined that large impervious sites (like churches, commercial sites, and schools) are more economical for stormwater management retrofit projects than distributed small projects along roadways. Analysis of the watershed land use indicates that large impervious sites are typically commercial properties (primarily retail), churches, and schools. The District began assessing church sites for retrofit opportunities in 2013 and will continue this effort in 2014.
This project will provide lake and stream monitoring assistance to the Minnesota Pollution Control Agency (MPCA), identifying impaired waters within the Lower Minnesota RIver Watershed (Watershed ID: 07020012) according to the Intensive Watershed Monitoring (IWM) Approach.
Approximately 70 percent of all Minnesotans rely on groundwater as their primary source of drinking water. Wells used for drinking water must be properly sealed when removed from service to protect both public health and Minnesota’s invaluable groundwater resources. The Minnesota Department of Health with the assistance of the Board of Water and Soil Resources protects both public health and groundwater by assuring the proper sealing of unused wells.” Clean Water funds are being provided to home owners as a 50% cost-share assistance for sealing unused private drinking water wells.
The goal of this project is the continued development of an overall strategy for reduction of turbidity/TSS, with sets of sediment reduction initiatives and actions for various sources, to address the Minnesota River Turbidity TMDL and the South Metro Mississippi River TSS TMDL. The overall strategy will be used to help establish a path towards achieving the required reductions of turbidity/TSS.
The Children’s Discovery Museum (CDM) continued aggressive School Service Program (SSP) enrollment strategies to reach the seven new counties of Becker, Lake of the Woods, Mahnomen, Mille Lacs, Morrison, Todd, and Wadena. A new Wizard of Oz exhibit was mounted in time for the 75th Anniversary Celebration, June 10-14, 2014.