This program will complete the initial WMA site development on 1,500 acres of land acquired in the Accelerated Prairie Grassland WMA and Accelerated Wetland WMA Acquisition programs to meet standards for inclusion in the Outdoor Recreation System. This program will also accelerate the restoration, enhancement and management of at least 5,180 acres of native prairie vegetation on existing public lands.
Pheasants Forever, Ducks Unlimited, and the U.S. Fish and Wildlife Service will cooperate to permanently restore and conserve approximately 800 acres of grassland and 400 acres of wetland as Waterfowl Production Areas in western and southern Minnesota. All lands acquired through this grant proposal will be owned and managed by the Service as part of the National Wildlife Refuge System.
A direct appropriation of $400,000 in FY 2010 for the Anoka Conservation District (ACD) is for the metropolitan landscape restoration program for water quality and improvement projects in the seven-county metro area (the law also provides $600,000 for this purpose in FY2011).
To create a new work for concert bands and have it performed by 29 bands. To serve as visiting composer for several of the ensembles as they prepare and perform his music and network with band directors.
For a photographic installation to be presented at Augsburg College in 2010 where she will create large-scale transparencies and wall charts in response to historical biology maps.
The 2010/2011 Wildwood Artist Series features the world-renowned Vienna Boys Choir, folk-singer John McCutcheon with Patty McCutcheon providing sign language, and Celtic chanteusse Katie McMahon with Karen Mueller, Zack Kline, Mark Anderson, Jenny Russ, and the Corda Mor Irish Dancers.
The Cannon River Watershed is a diverse watershed from the standpoint of topography, land use, and land cover, but a central issue of concern is increased sedimentation and turbidity within the river. One of the best ways to keep sediment from entering the Cannon River is to install vegetative buffers on the smaller tributaries in the upper reaches of the watershed. This project is important as it aims to help identify strategic locations where buffers are needed and to assist landowners to install buffers that will directly help reduce sedimentation within the watershed.
To enhance nonoprofit arts groups' ability to serve the artistic cultural and geographic diversity of the metro area through grants for minor capital improvements equipment and supplies.
Continued TMDL project to support next phases associated with completion of TMDL's for ten lakes in the Carnelian Marine Saint Croix Watershed District (CMSCWD). Ten lakes are; East Boot, Fish, Goose, Hay, Jellum’s, Long, Loon, Louise, Mud and South Twin.
With the grant the Northfield Public Library was able to research, write and published a centennial history of the Northfield Carnegie Library entitled "Everlasting Influences: The Centennial History of the Northfield Carnegie Public Library 1910-2010."
The Afton Historical Society (AHS) staff performed a wall-to-wall baseline inventory of 10,020 items, counting and locating each item. This number includes all components of 6206 line items documented on the inventory forms. Items inventoried include materials from the permanent collections, historical property that originated with the building, and consumable items/materials used in programming (PUMs) or for education.
TMDL project in the Chisago Lakes Lake Improvement District that will develop a watershed based plan and provide strategies for water quality and aquatic ecosystem management, restoration, and protection within Sunrise River Watershed. This project will also aid in understanding the Phosphorus loading to Lake St. Croix.
Lake Elmo Park Reserve. Build Winter Recreation Area including plan winter recreation area, develop recreation facilities to accommodate evening use; install lighting for ski trails and site; develop roads and parking lot; remodel barn for use as a trailhead. A?
Currently, there are approximately 5,050 feedlots with fewer than 300 animal units that need to come into compliance with State feedlot rules. Clean Water Feedlot Water Quality Management Grant funds are being used to provide financial assistance to landowners with feedlot operations less than 300 animal units in size and located in a riparian area or impaired watershed.
Per Minnesota Laws, 2009, Chapter 172, Article 4, Section 2, Subd. 5, "Funds in this subdivision are appropriated to the commissioner of the Department of Administration for grants to the named organizations for the purposes specified in this subdivision. Up to one percent of funds may be used by the Department of Administration for grants administration. Grants made to public television or radio organizations are subject to Minnesota Statutes, sections 129D.18 and 129D.19."
More than 40 reels of 8mm film were shot by the prolific photographer John Runk of his home down during 1947 through 1954. These films depict life in the Stillwater area post-World War Two and were donated to the Washington County Historical Society by Runk himself.
The project received an MHS Grants-in-Aid award in 2008 to enable the transfer of the raw 8mm film footage to digital tape and DVD.
MHCG funding allowed John Runk's little known motion pictures to be more broadly accessible to the public through edited down highlights in DVD format.
This project will provide information about the amount and sources of phosphorous flowing into Lake St Croix by implementing additional water quality monitoring and reduce the amount of phosphorous flowing into Lake St Croix by implementing phosphorous reduction activities. The St Croix River Association (SCRA) will coordinate with the St. Croix Basin Water Resources Planning Team (Basin Team) on the identification and funding of comprehensive water monitoring and phosphorus reduction activities in the Lake St. Croix portion of the St.
Redevelopment of McCollough Park including accessible picnic shelter, fishing pier, playground equipment, parking, 1.76 miles of trail, restroom/shower facilities, campground office, new septic system and relocation of the 45 campsites and park entrance.