Minnesota's Legacy

All Projects

Showing 1 - 9 of 9 | Export projects
Recipient
Chisago SWCD
2015 Fiscal Year Funding Amount
$30,000
Fund Source

The Chisago Soil and Water Conservation District has been successful in implementing Best Management Practices in certain targeted locations within the county, including the prioritized and assessed areas of Chisago City, Lindstrom, and Center City. However, there are many areas that want to implement conservation projects but aren't within targeted areas. This award will empower community partners, especially lake associations, to award grants for rain gardens, shoreline buffers, and other worthwhile projects to improve water quality.

Chisago
Recipient
Isanti SWCD
2018 Fiscal Year Funding Amount
$251,545
Fund Source
Isanti
Recipient
Isanti SWCD
2015 Fiscal Year Funding Amount
$99,736
Fund Source

This project will install nearly 800 linear feet of restored lakeshore with an emphasis on bioengineering techniques, native plants and locating buffers/swales at points of concentrated overland flow into Green Lake. By targeting properties that are eroding and/or with concentrated overland flow to the lake we will reduce suspended solids discharge by 16,697 lbs/yr and phosphorus by 1.3 lbs/yr.

Isanti
Recipient
Anoka CD
2016 Fiscal Year Funding Amount
$60,000
Fund Source

Lake George is the premier recreational lake in Anoka County with above average water quality, a vibrant fishery, and a large regional park and beach that is among the most utilized in the county. Located in northwestern Anoka County within the Upper Rum River Watershed Management Organization (URRWMO), the Lake George Improvement District (LGID) was formed to tend to the lake's diminishing water quality and problematic invasive species.

Anoka
Recipient
Isanti SWCD
2016 Fiscal Year Funding Amount
$25,000
Fund Source

This project will install practices to improve water quality in Long Lake, Isanti Co. We will install at least 350 linear feet of restored lakeshore and 3,000 sq ft of native plant stormwater treatment with an emphasis on bioengineering techniques, native plants and locating buffers/swales/rain gardens at points of concentrated overland flow into the lake. By targeting properties that are eroding and/or with concentrated overland flow to the lake we will reduce suspended solids discharge by 6,300 lbs/yr and phosphorus by 0.6 lbs/yr.

Isanti
Recipient
Isanti SWCD
2017 Fiscal Year Funding Amount
$30,405
Fund Source

This project will result in the installation of give water quality practices totaling 350 linear feet of restored lakeshore and 6,000 square feet of native plant stormwater management. By targeting properties that are eroding and/or with concentrated overland flow to the lake, pollutant discharge to the lake will be reduced.

Isanti
Recipient
Isanti SWCD
2020 Fiscal Year Funding Amount
$93,532
Fund Source
Isanti
Recipient
Isanti SWCD
2014 Fiscal Year Funding Amount
$120,611
Fund Source

This project is located in an area in the City of Isanti that developed before modern-day stormwater treatment requirements. It will result in the installation of a new stormwater pond in a historic core neighborhood. The urbanized drainage area presently has no other stormwater treatment, except for street sweeping. The new stormwater pond will reduce discharges from a 55 acre site draining to the State Scenic and Recreational Rum River by 12 pounds/yr for phosphorus and approximately 3 tons/yr of sediment.

Isanti
Recipient
St. Paul, City of
2015 Fiscal Year Funding Amount
$695,000
Fund Source

At almost 4,000 acres, Trout Brook is the largest subwatershed in the Capitol Region Watershed District and the City of Saint Paul. The restored stream is part of the 42 acre Trout Brook Nature Sanctuary project, whose goal is to return the area back to some resemblance of its pre-industrialized valley of stream floodplain and wetlands. Monitoring results within the corridor show that phosphorus, sediments, bacteria, lead and copper are the pollutants of most concern.

Ramsey