Develop and implement an integrated brand awareness and marketing campaign to increase awareness and familiarity of the park system service offerings to Dakota County residents and increase new use throughout the park system. The campaign will use print, digital and other media strategies to inform a broad and diverse audiences with targeted approaches appropriate for those audiences.
Develop and implement an integrated brand awareness and marketing campaign to increase awareness and familiarity of the park system service offerings to Dakota County residents and increase new use throughout the park system. The campaign will use print, digital and other media strategies to inform a broad and diverse audiences with targeted approaches appropriate for those audiences.
Build trailhead to the Big Rivers Regional Park including restrooms, drinking water, information center, picnic canopy, an expanded parking lot, accessibility improvements, and interpretation of historical/cultural/natural resources
Mississippi River Regional Trail, construct 5.2 miles to connect ?Inver Grove Heights to the Pine Bend Scientific and Natural Area to lower Spring Lake Park Reserve.
Design, engineer and construct segment of the trail including grade separated crossing at Hwy 110 and Dodd Road intersection and a connection to Valley Park.
Design, engineer and construct segment of the trail including grade separated crossing at Hwy 110 and Dodd Road intersection and a connection to Valley Park.
Build ADA compliant, year round, multi-purpose, paved trail and boardwalk around Empire Lake; Construct 2 camper cabins; Improve/replace Empire Lake dike outlet; Install benches & site furnishings; landscaping and MP-approved improvements. Includes design, engineering, construction & construction administration.
Lebanon Regional Park, implement elements of the Visitor Center Interpretive Concept Plan to engage, educate, inform and encourage stewardship and preservation.
The project will increase lake and river access e.g. dock and carry-in portage; provide trails and small gathering space on Echo Point; restore and re-naturalize the park with trees, shrubs and native perennials; improve the layout and/or capacity picnic ground and campground; and other master plan approved improvements. The project includes design, engineering, construction and construction administration.
Mississippi River and Big Rivers Regional Trails, extend trail to St. Paul and connect to Lilydale Regional Trail and Mississippi River Regional Trail Rosemount Segment.
engineering and assistance with construction costs of a portion of the Regional Greenway through the MN Zoological Garden including a grade separated crossing of CASH 38
engineering and assistance with construction costs of a portion of the Regional Greenway through the MN Zoological Garden including a grade separated crossing of CASH 38
The Twin Cities area is host to a nationally renowned system of regional parks that provides numerous outdoor recreational opportunities for the public while preserving green space for wildlife habitat. The Metropolitan Council is using this appropriation to partially finance the acquisition of approximately 195 acres to be added to existing metropolitan regional parks, with priority given to lands with shoreland, lands that provide important natural resource connections, and lands containing unique natural resources.