The goal of the project is the development of an overall strategy for reduction of turbidity/TSS, with sets of sediment reduction initiatives and actions for various sources, to address the Minnesota River Turbidity TMDL and the South Metro Mississippi River TSS TMDL.
The goal of this project is to complete a two-year data set for physical, bacterial, and water chemistry sampling for the Intensive Watershed Monitoring Plan to aid MPCA’s assessment of the aquatic health of the Mississippi Headwaters(HUC 07010101) Watershed.
This project will support the monitoring of two sites on the Cannon River throughout the field seasons of 2013 and 2014 during storm events and baseflow conditions to capture 25 samples per year at each site according to the WPLMN objectives. The information gathered from these samples and site visits will be compiled for reporting purposes and for use in calculating pollutant loading using the FLUX32 model.
This project will work with the MPCA to conduct watershed pollutant load monitoring at four sites in the Chippewa River watershed and one site in the neighboring Pomme de Terre River watershed . The Chippewa River Watershed Project (CRWP) team will also aid the MPCA in measuring and comparing regional differences and long-term trends in water quality. The goal is to collect quality data and complete load calculations for the five sites using the MPCA's established protocols.
This project targets retrofit stormwater Best Management Practices (BMPs) on public land to assist partnering Local Government Units (LGUs) achieve water quality goals identified in local stormwater plans. The Dakota County Soil and Water Conservation District (SWCD) provides technical assistance and distributes Clean Water Funding (CWF) to leverage local funding through its time-proven Stormwater Retrofit Partnership (Partnership) cost share program.
This project is a continuation of the Dakota County Community Initiative, which has received Clean Water Funds in 2012 and 2013. It will provide cost share funding to organizations and associations who voluntarily construct medium sized water quality best management practices (BMPs) in Dakota County.
To provide professional development for two staff members at the national American Association for State and Local History Conference in St. Paul, September 17-20, 2014.
To provide professional development for two staff members at the national American Association for State and Local History Conference in St. Paul, September 17-20, 2014.
The grant will use local data to develop stormwater planning options that prioritize, target, and measure the effectiveness of Best Management Practices and allow local city officials to make decisions on stormwater Best management Practices that reduce pollutants in the stormwatershed.
This project will use the Dakota County Soil and Water Conservation District's existing Conservation Initiative Funding program to provide technical assistance and monetary incentives for targeted, medium-sized projects such as raingardens, bioinfiltration, biofiltration, bioswales, shoreline stabilizations, and other best management practices (BMPs). Project proposals will be solicited from faith based organizations, homeowner associations, school organizations, lake associations, and others that own or manage large areas of land.
The Pomme de Terre River Association has targeted and identified specific areas and activities required for marked water quality improvement. This project will implement of 16 Water and Sediment Control Basins (WASCOBs), 28 Rain Gardens, 2 Shoreline/ Stream bank stabilization, 10 Waste Pit Closures, 1 Terrace Project, and the enrollment of 1900 acres into conservation practices. These practices in total will directly result in site-specific and watershed-dependent reductions of 17,801 tons of sediment and 17,784 pounds of phosphorous from entering surface waters yearly in the watershed.
This project will work to address the nutrient impairment of Two Rivers Lake through the installation of targeted best management practices as prioritized in the Two Rivers Lake Targeted Conservation Practice Plan (funded through a 2014 SEDLCP CWF Grant). The goal of this project is to implement erosion control practices within three agricultural priority subwatersheds with existing erosion concerns and also to install urban water quality practices in two of the identified sub watersheds within the City of Albany.
These funds are being used to systematically collect data and produce statistically valid estimates of the rate of soil erosion and tracking the adoption of high residue cropping systems in in the 67 counties with greater than 30% land in agricultural row crop production. Designed to establish a long term program in Minnesota to collect data and produce county, watershed, and state wide estimates of soil erosion caused by water and wind along with tracking adoption of conservation measures to address erosion.
This project targets nutrient reductions within the Mayhew and Big Elk Lake watersheds. The Benton Soil and Water Conservation District will work with farmers in implementing a variety of conservation practices including, but not limited to cropland erosion control projects, riparian pasture management, and nutrient management and feedlot pollution control systems. These strategies were identified through Total Daily Maximum Load Studies.
The Vermillion River Watershed Joint Powers Organization, in partnership with the City of Burnsville, is planning an overall improvement in the Alimagnet Lake subwatershed that consists retrofit two existing stormwater ponds that drain to Alimagnet Lake, a nutrient impaired water, with iron-enhanced sand filter benches. It is estimated that a significant amount of phosphorus reduction will be achieved by implementing this project, bringing Alimagnet Lake closer to state water quality standards.
As part of the Dakota County Transportation Department's highway 78 road reconstruction project, the Vermillion River Watershed Joint Powers Organization is partnering with Dakota County to install a nitrate treatment practice on a tributary to the South Branch Vermillion River adjacent to the road. The South Branch Vermillion River subwatershed is the highest nitrate loading subwatershed in the Vermillion River Watershed and is a significant contributor to contaminated drinking water in the eastern portion of the watershed.
Little Rock Lake experiences severe algae blooms due to excess phosphorus and these blooms are the worst known regionally. The goal of this project is to reduce algae blooms, improve water clarity, and avoid risk of drinking water contamination. The project will result in installing one farmer nutrient management project , four cover crops, two lakeshore buffer strips, six septic systems that also demonstrated an imminent threat to public health, six erosion control projects , one wetland restored, and one feedlot runoff control system.
The goal of the Pomme de Terre River Association (JPB) is to improve the local water resources within the watershed through targeted voluntary efforts and the building of strong relationships with local landowners, producers, and citizens. The Pomme de Terre River is currently not meeting state water quality for sediment. The purpose of this project is to strategically work towards a 53% sediment reduction goal at the mouth of the Pomme de Terre River based on a Watershed Restoration and Protection Strategy document.
South Creek is a tributary to the Vermillion River and a DNR-designated trout stream. Currently, the creek is not meeting state water quality standards for sediment, temperature and dissolved oxygen The Vermillion River Watershed Joint Powers Organization and the City of Lakeville propose to retrofit an existing stormwater pipe with a hydrodynamic separator to reduce the sediment load reaching South Creek and the Vermillion River. One hydrodynamic separator will be installed and is estimated to reduce sediment loads to South Creek and the Vermillion River by 4 tons per year.
The Vermillion River Watershed JPO is partnering with Dakota County and the City of Lakeville to enhance stormwater management along County Road 50. A treatment train approach with an iron-enhanced sand filter at the tail end to remove dissolved phosphorus will be implemented to treat a drainage area including a portion of the upstream neighborhoods that currently receive little to no stormwater treatment. The practice is anticipated to reduce 20 pounds of phosphorus annually from reaching Lake Marion, a water resource with high recreational value targeted for protection.
South Creek, a tributary to the Vermillion River and a DNR-designated trout stream. Currently, the creek is not meeting state water quality standards for sediment, temperature and dissolved oxygen and it flows through a large stormwater basin in the City of Lakeville. The Vermillion River Watershed Joint Powers Organization, in partnership with the city, propose to create a new channel for the creek in order to separate it from the pond. The result would be significantly cooler temperatures, increased dissolved oxygen, and less sediment-laden water in South Creek.
A completed Total Maximum Daily Load (TMDL) study has identified mid to late summer phosphorus loading as a significant stressor to lakes and streams within the Big Elk Lake watershed. While this comprehensive study serves its role as the unifying document that identifies pollutants and sources, further work is required in order to develop site-specific Best Management Practices, design these practices, and oversee their implementation in order to reach clean water goals.
This project will address nutrient impairments of the Sauk River and Sauk River Chain of Lakes (SRCL) by minimizing runoff from 5 high priority feedlots. Specifically, contaminated runoff from 5 feedlots upstream of the SRCL will be eliminated. The sites were prioritized based on the Minnesota Feedlot Annualized Runoff Model index ratings and the location of these feedlots are within a Drinking Water Supply Management Areas.
The Benton County Water Plan advisory committee has the goal of protecting groundwater resources in Benton County. One of the methods identified is to seal unused wells. In 2013, Benton Soil and Water Conservation District completed an aggressive campaign to identify unused wells. We used several sources to locate potential wells, completed site visits for many wells and collected site information to assisting in prioritizing limited cost share resources.
These funds are being used to systematically collect data and produce statistically valid estimates of the rate of soil erosion and tracking the adoption of high residue cropping systems in counties with greater than 30% land in agricultural row crop production. Designed to establish a long term program in Minnesota to collect data and produce county, watershed, and state wide estimates of soil erosion caused by water and wind along with tracking adoption of conservation measures to address erosion.
Provides grants to Soil and Water Conservation Districts that focuses on increasing capacity to address four resource concern areas?Soil Erosion, Riparian Zone Management, Water Storage and Treatment, and Excess Nutrients.
The goal of this project is to achieve a 10% reduction in overall sediment discharge to the Mississippi River from the Northeast St. Cloud Drainage Area by installing one regional underground stormwater detention and treatment facility in partnership with a Neighborhood Redevelopment Project. The project will have over 16,000 cubic feet of water storage capacity treating 35 acres of stormwater runoff and is modeled to reduce sediment by 4.5 tons, which is 10% of the sediment reduction goal for this drainage area.