The purpose of this project is to conduct an inventory of the 103E drainage ditches where erosion, sediment, and/or nutrients are contributing substantially to water quality degradation, and prioritize sites for side water inlet control and/or buffer strip implementation.
The purpose of this Phase II Project is to advance the inventory process of the 103E drainage ditches where erosion, sediment, and/or nutrients are contributing substantially to water quality degradation, and prioritize sites for side water inlet control and/or buffer strip implementation.Through this project, Red Lake Watershed District, Red Lake County Ditch Authority, along with the Red Lake County SWCD, will be working together prioritizing county ditch systems (based upon water quality degradation and the amount of sediment loading that is occurring in the ditch systems), targeting whe
Red Lake County Soil and Water Conservation District (SWCD) has targeted water quality improvement projects to twelve sites in the Black River, Cyr Creek, and Red Lake River Sub-Watersheds of the Red Lake River Watershed. Data analysis obtained from a variety of models identified which sub-watersheds were contributing to impairments, highlighted which fields in those sub-watersheds were contributing the most sediment, and even showed specific locations in the field which were most vulnerable to erosion.
The Clearwater River from the Lost River to Beau Gerlot Creek and from the Lower Badger Creek to the Red Lake River is on the Total Maximum Daily Load Impaired Waters List for Turbidity. Red Lake County Soil and Water Conservation District (SWCD) has targeted five sites in the Terrebonne Creek, Beau Gerlot Creek, and Lower Badger Creek subwatersheds of the Clearwater River Watershed; with the potential of an additional five to ten more projects, based on data analysis obtained from a number of models.
Red Lake River currently does not meet state water quality standards due to high amounts of sediment. For this project, the Red Lake County Soil and Water Conservation District will continue to work cooperatively with the Red Lake County Ditch Authority, and the landowners to reduce erosion and sedimentation into Judicial County Ditch 66. Judicial County Ditch 66 outlets into Cyr Creek which outlets directly into the Red Lake River.
Provides grants to Soil and Water Conservation Districts that focuses on increasing capacity to address four resource concern areas?Soil Erosion, Riparian Zone Management, Water Storage and Treatment, and Excess Nutrients.
The DRAFT Clearwater River Comprehensive Watershed Management Plan (CWMP) identifies the Lower Clearwater Planning Region as having a current sediment loading from overland sources of 18,491 tons/year at the planning region outlet. The 10-year Plan goal is to reduce loading to the outlet by 4% (767 tons/year). The targeted implementation schedule includes structural agricultural practices with a 10-year measurable outcome of 1,271 tons/year (catchment outlet) to meet the 10-year Plan goal.
Provide contract management to ENRTF pass-through appropriation recipients for approximately 115 open grants. Ensure funds are expended in compliance with appropriation law, state statute, grants policies, and approved work plans.
The Red Lake Watershed District, Clearwater, East Polk, Pennington, Red Lake County SWCD's have agreed to work Collectively via MOA to implement water quality projects throughout the Clearwater River Watershed. Implementation efforts are priorities following the guidance of the Comprehensive watershed plan completed in spring of 2023. FY25 funds will be used to continue the implementation of projects identified and/or developed over the FY23 timeframe to continue to meet the goals highlighted in the comprehensive watershed plan.
This program will complete the initial WMA site development on 1,500 acres of land acquired in the Accelerated Prairie Grassland WMA and Accelerated Wetland WMA Acquisition programs to meet standards for inclusion in the Outdoor Recreation System. This program will also accelerate the restoration, enhancement and management of at least 5,180 acres of native prairie vegetation on existing public lands.
The Accelerated Water Quality Project Implementation Program will increase the connection between landowners, local government units and the landscape to accelerate efforts addressing non-point source loading to surface waters throughout the Red River Valley Conservation Service Area.
This program will acquire and develop approximately 730, acres of new Wildlife Management Area (WMA) lands. New WMA acquisition acre targets by LSOHC Sections will be consistent with the recommendations of The Citizens Advisory Committee report of 2002? Wildlife Management Area Acquisition The Next 50 Years. Additionally, this program will protect 275 acres of native prairie as state Scientific & Natural Areas (SNAs) and perpetual Native Prairie Bank (NPB) easements.
Many of Minnesota's wetlands have been lost and the remainder degraded. Recent tiling and ditching have accelerated this situation. Through this program, shallow lakes and wetlands were designed, constructed, and intensively managed to benefit wetland wildlife and Minnesota residents. Habitat accomplishments from this proposal have enhanced 19,365 acres of wetlands and shallow lakes to benefit waterfowl and wetland wildlife. Work was accomplish through constructed infrastructure, cattail control, and a significant prescribed wetland burn.