Minnesota's Legacy

All Projects

Showing 1 - 3 of 3 | Export projects
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$49,999
Fund Source

The goal of this project is to extend, calibrate, and validate the existing Hydrological Simulation Program – FORTRAN (HSPF) watershed models in the Red Lake River, Thief River, Clearwater River and Red Lake watersheds.

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
Wilkin Soil and Water Conservation District
2018 Fiscal Year Funding Amount
$26,462
2017 Fiscal Year Funding Amount
$19,692
2016 Fiscal Year Funding Amount
$274,378
Fund Source

PROJECT GOAL: Improve agricultural production and reduce flooding losses while minimizing the unwanted environmental impacts of subsurface drainage.

PROJECT OBJECTIVE: Demonstrate controlled tile drainage as a flood mitigation practice as well as the water quality and quantity benefits. The project is intended to set an example to increase the adoption of drainage water management practices in the Red River Valley. 

Controlled drainage and a saturated buffer are both being evaluated as part of this project.

Clay
Kittson
Marshall
Norman
Polk
Roseau
Wilkin
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$134,960
Fund Source

The primary goal of this project is to examine the calibration and validation of recently extended Hydrological Simulation Program – FORTRAN (HSPF) watershed models for the Mississippi River-Headwaters, Mississippi River-Grand Rapids, Mississippi River-Brainerd, Mississippi River-Sartell, Mississippi River-St. Cloud, Leech Lake, Pine River, Crow Wing River, Long Prairie River, and Redeye River watersheds and revise the calibration.

Aitkin
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Crow Wing
Douglas
Hubbard
Itasca
Mille Lacs
Morrison
Otter Tail
Pine
Sherburne
St. Louis
Stearns
Todd
Wadena