Minnesota's Legacy

All Projects

Showing 1 - 9 of 9 | Export projects
Recipient
Buffalo-Red River Watershed District
2011 Fiscal Year Funding Amount
$249,968
Fund Source

The Buffalo River Watershed Pilot Project is one of two pilots in Minnesota designed to develop a watershed approach for managing Minnesota’s surface waters. The goal of this project is to develop a plan that will guide surface water quality management throughout the watershed.

Becker
Clay
Otter Tail
Wilkin
Recipient
Carlton County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$70,055
Fund Source

This project will support Minnesota's condition monitoring strategy through the collection of water quality data on streams and rivers in the Nemadji River watershed. The Nemadji River watershed is located in southeastern Carlton County and northeastern Pine County. Water quality samples will be collected primarily during weather-related events that affect stream flow such as snowmelt and rainfalls.

Carlton
Pine
St. Louis
Recipient
Lake County Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$225,000
Fund Source

This project will gather watershed data necessary for the development of a comprehensive watershed management plan with parameter-specific thresholds that will maintain or improve water quality for the Kawishiwi Watershed.

Cook
Lake
St. Louis
Recipient
U.S. Army Corps of Engineers (USACE)
2012 Fiscal Year Funding Amount
$163,100
Fund Source

This project will provide a protocol for prioritizing sites in the St. Louis Area of Concern (AOC ) for restoration based on site-specific bioavailability considerations. Despite large data collection efforts focused on sediment chemistry, the extent to which sediment with moderate levels of contamination is available for uptake into biota and therefore contributing to Beneficial Use Impairments (BUI)s is still largely unknown.

St. Louis
Lake
Carlton
Recipient
U.S. Army Corps of Engineers (USACE) & U.S. Environmental Protection Agency (USEPA)
2010 Fiscal Year Funding Amount
$750,000
Fund Source

This project will provide technical, planning and engineering assistance to the MPCA for the development and implementation of the St. Louis River Remedial Action Plan (RAP). USACE and USEPA in partnership with the MPCA will administer work plans to complete a sediment assessment for Minnesota areas within Superior Bay, St. Louis Bay, Lower St. Louis River and the Upper St. Louis River, encompassing approximately 5,349 acres of the St. Louis River and Estuary.

Carlton
Lake
St. Louis
Recipient
United States Geological Survey (USGS)
2015 Fiscal Year Funding Amount
$18,375
Fund Source

The study will assess existing phosphorus data records and create a model to explain phosphorus loading into the Red River of the North. Studies have found that the majority of nutrient loading in the stream located in agricultural areas occurs with sediment loading since nutrients are typically bound to sediment particles.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Metropolitan Council/Barr Engineering Company
2015 Fiscal Year Funding Amount
$47,487
2016 Fiscal Year Funding Amount
$1,905
Fund Source

As the Metropolitan Council updated the Twin Cities Metropolitan Area Master Water Supply Plan, stakeholders asked the Council to consider the sustainable limits of the region’s water sources. The Council’s most important analytical tool is a regional groundwater flow model (Metro Model 3), which can be used to quantify the long-term regional impacts caused by hundreds of independent groundwater appropriations.

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington
Recipient
Metropolitan Council/Barr Engineering Company
2012 Fiscal Year Funding Amount
$20,789
2013 Fiscal Year Funding Amount
$135,416
2014 Fiscal Year Funding Amount
$66,495
2015 Fiscal Year Funding Amount
$5,662
2017 Fiscal Year Funding Amount
$2,698
2018 Fiscal Year Funding Amount
$26,377
Fund Source

State law charges the Metropolitan Council (Council) with developing and maintaining a base of technical information needed for sound water supply decisions (Minnesota Statutes 473.1565). The Council’s primary tool to provide this information is the Metro Model 2, a regional groundwater model capable of predicting the impacts of planned water demand on aquifers and connected lakes and streams. The Metro Model 2 is a modern and comprehensive groundwater model of the Twin Cities area, but it is currently out-of-date.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Sherburne
Washington
Wright
Recipient
Metropolitan Council
2012 Fiscal Year Funding Amount
$16,549
2013 Fiscal Year Funding Amount
$73,308
Fund Source

Regional recharge modeling with the Twin Cities daily soil water balance (SWB) model has been a fundamental part of the Metropolitan Council’s groundwater flow modeling effort and supports the Metropolitan Area Master Water Supply Plan. The SWB model is used to evaluate the impact of planned and potential land use and climate on recharge in the eleven-county metropolitan area, and supports the ongoing update of the regional groundwater flow model.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Sherburne
Washington
Wright