Ramsey County SWCD is applying to continue the implementation of its popular and successful well sealing cost-share program to help protect the groundwater, especially in highly vulnerable drinking water supply management areas, by permanently and professionally sealing between 115 and 140 abandoned wells in the county.
This project will design and install targeted practices to reduce the volume, sediment and phosphorus from urban stormwater runoff directly discharging into Perro Creek and Lily Lake. This project is funded through the Washington County allocation of the Watershed-Based Funding Pilot Program for the Seven County Metropolitan Area.
This project will improve the water quality of lakes in Ramsey and Washington Counties. This will be accomplished by: 1) installation of filtration basins adjacent to Wakefield Lake to reduce nutrient and sediment pollution, and 2) construction of raingardens on private property that filter stormwater runoff thereby reducing sediment and nutrient pollution to Battle Creek Lake and Kohlman Creek. This project is funded through the Ramsey County and Washington County allocations of the Watershed-Based Funding Pilot Program for the Seven County Metropolitan Area.
This project will conduct a subwatershed feasibility study to identify and prioritize project locations for retrofit of stormwater best management practices. The project will also include installation of the highest priority stormwater improvement practice to reduce nutrient pollution to Goose Lake. This project is funded through the Anoka County and Ramsey County allocations of the Watershed-Based Funding Pilot Program for the Seven County Metropolitan Area.
Provides grants to Soil and Water Conservation Districts that focuses on increasing capacity to address four resource concern areas?Soil Erosion, Riparian Zone Management, Water Storage and Treatment, and Excess Nutrients.
Provides grants to Soil and Water Conservation Districts that focuses on increasing capacity to address four resource concern areas?Soil Erosion, Riparian Zone Management, Water Storage and Treatment, and Excess Nutrients.
We protected 22.3 miles of trout streams and 1.3 miles of lakeshore via easements (585 acres in total), and 7.4 miles (504 acres) of lakeshore through fee-title purchase. We enhanced shoreline habitat on 524 acres of riparian land, and instream habitat on 3.1 miles of trout streams and 0.5 miles of warmwater rivers.
This appropriation funded 283 projects totaling 21,953 acres. The two largest types of enhancement were 112 woody removal projects totaling 10,160 acres and 134 prescribed burns totaling 10,082 acres. Additionally, we seeded 30 sites totaling 1386 acres, put in infrastructure for conservation grazing of 236 acres on 3 sites, conducted 3 oak savanna enhancements totaling 42 acres, and treated 47 acres of invasive species on 2 sites.
The proposal was to accelerate the protection of 1,275 acres of prairie grassland, wetland, and other wildlife habitat as State Wildlife Management Areas open to public hunting. However, over the course of the appropriation, we acquired 10 parcels for a total of 1,498 acres which exceeded our total acre goal of 1,275 acres by 223 acres. Breaking down acres by ecological section we exceed our acre goal for the metropolitan area by 97 acres.
This program accelerated the permanent protection of 2,267 acres of wetlands (465 acres) and grasslands (1,802 acres) as Waterfowl Production Areas open to public hunting in Minnesota. Over the course of the appropriation, PF acquired 18 parcels for a total of 2,267 acres which exceeded our total acre goal of 2,250 acres by 17 acres. Breaking down acres by ecological section we exceeded our acre goal for both the metropolitan area by 61 acres and in the prairie area by 346 acres. We have exceeded anticipated match of $5,125,000 by $771,500.