All Projects

49 Results for
Recipient
Beltrami SWCD
2017 Fiscal Year Funding Amount
$100,000
Fund Source

Provides grants to Soil and Water Conservation Districts that focuses on increasing capacity to address four resource concern areas?Soil Erosion, Riparian Zone Management, Water Storage and Treatment, and Excess Nutrients.

Beltrami
Recipient
Dodge SWCD
2017 Fiscal Year Funding Amount
$128,000
Fund Source

Provides grants to Soil and Water Conservation Districts that focuses on increasing capacity to address four resource concern areas?Soil Erosion, Riparian Zone Management, Water Storage and Treatment, and Excess Nutrients.

Dodge
Recipient
Pope SWCD
2017 Fiscal Year Funding Amount
$162,500
Fund Source

Lake Emily is a high priority recreational lake in Pope County and is currently not meeting state water quality standards due to high phosphorus levels. This project will provide funding for 26 water and sediment control projects with potential shoreline and riparian restoration projects. This work will address surface water quality sources including both direct drainage and upstream discharge. Collectively, these projects have the potential to annually reduce sediment and phosphorus leaving the field which will directly address 15% of Lake Emily's phosphorus reduction goal.

Pope
Recipient
Red Lake SWCD
2017 Fiscal Year Funding Amount
$42,600
Fund Source

Red Lake River currently does not meet state water quality standards due to high amounts of sediment. For this project, the Red Lake County Soil and Water Conservation District will continue to work cooperatively with the Red Lake County Ditch Authority, and the landowners to reduce erosion and sedimentation into Judicial County Ditch 66. Judicial County Ditch 66 outlets into Cyr Creek which outlets directly into the Red Lake River.

Red Lake
Recipient
Beltrami SWCD
2017 Fiscal Year Funding Amount
$274,250
Fund Source

Beltrami County will be updating their water plan in 2017. This plan will be watershed protection oriented and will utilize all available data and maps in order to best protect our water resources. In 2012, Beltrami County completed screening on 19 of our large lakes with heavy land use development. What we found was that none of the lakes had enough chemical data for a trend analysis.

Beltrami
Recipient
Emmons & Olivier Resources Inc
2017 Fiscal Year Funding Amount
$34,959
Fund Source

This project will guide local implementation planning efforts by identifying water quality goals, strategies, and implementation milestones in the Cedar River Watershed. This watershed includes 435 square miles in major portions of Mower, Freeborn and Dodge Counties, and incudes the regional center of Austin. A Watershed Restoration and Protection Strategy (WRAPS) report will be completed by this effort.

Dodge
Freeborn
Mower
Recipient
Barr Engineering Co
2017 Fiscal Year Funding Amount
$48,510
Fund Source

This project is for the Cedar River Watershed, which includes major portions of Mower, Freeborn and Dodge Counties in southern Minnesota. The scope of this project is to complete the Total Maximum Daily Load (TMDL) studies for 11 stream reaches with sediment impairments, and 14 stream reaches for bacteria impairments. The major product of this effort will be the final Cedar River TMDL report, which will be submitted to the United States Environmental Protection Agency, and public-noticed by the Minnesota Pollution Control Agency.

Dodge
Freeborn
Mower
Recipient
Crow Wing County SWCD
2016 Fiscal Year Funding Amount
$48,450
2017 Fiscal Year Funding Amount
$6,326
Fund Source

The project will include lake monitoring on seventeen lakes found in the Mississippi River - Brainerd watershed in East Central Crow Wing County (CWC). The project will be conducted in an effort to gain data on these data-deficient lakes. One of the goals of the CWC Local Comprehensive Water Plan (CWP) is to establish a countywide Comprehensive Monitoring Plan (CMP). Surface water assessment monitoring will enable state 303(d) and 305(b) assessments and provide a better understanding of these lakes.

Aitkin
Crow Wing
Recipient
Tetra Tech
2017 Fiscal Year Funding Amount
$80,038
Fund Source

This project will conduct a 2017 revision of the South Fork Crow River, North Fork Crow River and Sauk River Watershed Hydrological Simulation Program FORTRAN (HSPF) models and review of the Pine River Watershed HSPF model.

Aitkin
Carver
Cass
Crow Wing
Douglas
Hennepin
Hubbard
Kandiyohi
McLeod
Meeker
Pope
Renville
Sibley
Stearns
Todd
Wright
2025 Fiscal Year Funding Amount
$300,000
2024 Fiscal Year Funding Amount
$300,000
2023 Fiscal Year Funding Amount
$250,000
2022 Fiscal Year Funding Amount
$250,000
2021 Fiscal Year Funding Amount
$250,000
2020 Fiscal Year Funding Amount
$250,000
2019 Fiscal Year Funding Amount
$250,000
2018 Fiscal Year Funding Amount
$250,000
2017 Fiscal Year Funding Amount
$250,000
2016 Fiscal Year Funding Amount
$250,000
2015 Fiscal Year Funding Amount
$250,000
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The Minnesota DNR and the Minnesota Forest Resources Council work with forest landowners, managers and loggers to implement a set of voluntary sustainable forest management guidelines that include water quality best management practices (BMPs) to ensure sustainable habitat, clean water, and productive forest soils, all contributing to healthy watersheds. This project will monitor the implementation of these forest management guidelines and BMPs on forested watersheds in MN.

Aitkin
Anoka
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Cook
Crow Wing
Fillmore
Goodhue
Houston
Hubbard
Isanti
Itasca
Kanabec
Koochiching
Lake
Lake of the Woods
Mahnomen
Mille Lacs
Morrison
Olmsted
Otter Tail
Pine
Roseau
Sherburne
St. Louis
Stearns
Todd
Wabasha
Wadena
Winona
2014 Fiscal Year Funding Amount
$1,808,000
Fund Source

Minnesota’s use of groundwater has increased over the last two decades. An increasing reliance on groundwater may not be a sustainable path for continued economic growth and development. The DNR is establishing three pilot groundwater management areas (GWMA) to help improve groundwater appropriation decisions and help groundwater users better understand and plan for future groundwater needs associated with economic development.

Clearwater
Douglas
Meeker
Swift
Wadena
Anoka
Becker
Hubbard
Pope
Ramsey
Stearns
Washington
2025 Fiscal Year Funding Amount
$150,000
2024 Fiscal Year Funding Amount
$150,000
2023 Fiscal Year Funding Amount
$135,000
2022 Fiscal Year Funding Amount
$135,000
2021 Fiscal Year Funding Amount
$150,000
2020 Fiscal Year Funding Amount
$150,000
2019 Fiscal Year Funding Amount
$110,000
2018 Fiscal Year Funding Amount
$110,000
2017 Fiscal Year Funding Amount
$110,000
2016 Fiscal Year Funding Amount
$110,000
2015 Fiscal Year Funding Amount
$110,000
2014 Fiscal Year Funding Amount
$110,000
Fund Source

Funding supports an Irrigation Specialist to develop guidance and provide education on irrigation and nitrogenbest management practices (BMPs). In this position, Dr. Vasu Sharma provides direct support to irrigators onissues of irrigation scheduling and soil water monitoring. She is collaborating on the development of new irrigationscheduling tools that help irrigators manage water and nitrogen resources more precisely. These tools help reducenitrogen leaching losses in irrigated cropping systems.

Becker
Beltrami
Benton
Big Stone
Blue Earth
Brown
Cass
Chippewa
Clay
Crow Wing
Dakota
Douglas
Goodhue
Grant
Hubbard
Isanti
Kandiyohi
Kittson
Lac qui Parle
Lincoln
Marshall
Meeker
Morrison
Mower
Norman
Otter Tail
Pipestone
Polk
Pope
Red Lake
Renville
Rice
Sherburne
Stearns
Stevens
Swift
Todd
Wabasha
Wadena
Washington
Watonwan
Wright
Recipient
Kanabec Soil and Water Conservation District
2017 Fiscal Year Funding Amount
$46,410
Fund Source

This project encompasses surface water quality sampling within the Snake River Watershed over a period of two years (2017-18). This is the cycle II monitoring as follow-up to the original Snake River Watershed monitoring 10 years ago as part of the Watershed Restoration and Protection Strategy Report (WRAPS). This project shall provide follow-up data on the waters in the Snake River Watershed in regards to changes in water quality over this 10-year cycle. The current sampling project will entail sampling 5 lakes and 11 stream sites.

Aitkin
Kanabec
Pine
Recipient
Lake of the Woods SWCD
2017 Fiscal Year Funding Amount
$55,956
Fund Source

The Rainy River - Rainy Lake, Rainy River - Baudette and Rapid River Watershed Assessments will include the waters of the Baudette River, Black River, Peppermint Creek, Rapid River, Rat Root River and Winter Road River in Koochiching and Lake of the Woods Counties. This assessment focuses on collection of water chemistry and field parameters at the 12 key sites identified and modified by the Minnesota Pollution Control Agency (MPCA). Five of the sites will have extra total phosphorus and chlorophyll analysis completed as identified by the MPCA for collecting river nutrients.

Koochiching
Lake of the Woods
St. Louis
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$96,888
Fund Source

This project will complete the Total Maximum Daily Load (TMDL) study and Watershed Restoration and Protection Strategies (WRAPS) for the Lake Superior North watershed. Two segments of the Flute Reed River are impaired for aquatic life due to elevated turbidity and total suspended solids. The lower Poplar River is also listed as impaired but significant progress has occurred in the last 10 years. A TMDL and implementation plan have been completed for the lower Poplar River impairment. All other waters meet water quality standards and will be considered for protection measures.

Cook
Lake of the Woods
Recipient
Lake of the Woods SWCD
2015 Fiscal Year Funding Amount
$305,620
2016 Fiscal Year Funding Amount
$66,412
2017 Fiscal Year Funding Amount
$47,202
2019 Fiscal Year Funding Amount
$34,422
Fund Source

The Lake of the Woods (LOW) Total Maximum Daily Load (TMDL) study will: (1) identify water quality goals for the Minnesota portions of the LOW/Rainy River Watershed; (2) recommend nutrient allocations to achieve TMDLs where waters do not meet standards; and (3) provide opportunities for stakeholders to engage in the process of watershed-management planning to adopt protection and restoration strategies. The project will include existing in-lake and watershed model updates, TMDL component development, restoration plan development, and public participation.

Lake of the Woods
Recipient
Lake of the Woods Water Sustainability Foundation
2015 Fiscal Year Funding Amount
$500
2016 Fiscal Year Funding Amount
$500
2017 Fiscal Year Funding Amount
$500
2018 Fiscal Year Funding Amount
$500
Fund Source

The Minnesota Pollution Control Agency (MPCA) is a co-sponsor and assists with a portion of the financial support for the International Rainy River-Lake of the Woods Watershed Forum.

Cook
Koochiching
Lake
Lake of the Woods
Roseau
St. Louis
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$165,599
Fund Source

The St. Louis River watershed is one of the largest watersheds in northern Minnesota and the largest single contributing watershed to Lake Superior. Surface waters are abundant with 353 lakes and 97 streams segments. Large areas of forest and wetlands help to sustain areas of exceptional water quality. However, land use changes have degraded many lakes, rivers, and streams. 21 stream reaches have aquatic life impairments, as identified by high turbidity (1 reach), poor quality aquatic macro-invertebrate community (16 reaches), and/or poor quality fish community (12 reaches).

Aitkin
Carlton
Itasca
Lake
St. Louis
Recipient
Southeast SWCD Technical Support Joint Powers Board
2017 Fiscal Year Funding Amount
$0
Fund Source

The Lower Mississippi River Feedlot Management in MN project will be leveraging State funding from BWSR to provide match for a United States Department of Agriculture Natural Resources Conservation Service (USDA-NRCS) Regional Conservations Partners Program (RCPP). BWSR will provide technical and financial assistance to plan and design projects to mitigate feedlot runoff from smaller (less than 300 animal units or AUs*), open lot feedlots in southeastern Minnesota.

Dodge
Fillmore
Freeborn
Goodhue
Houston
Mower
Olmsted
Rice
Steele
Wabasha
Winona
Recipient
Houston Engineering Inc
2017 Fiscal Year Funding Amount
$26,477
Fund Source

This project will address Minnesota Pollution Control Agency (MPCA), United States Environment Protection Agency (EPA), and public comments on draft Total Maximum Daily Load (TMDL) studies and Watershed Restoration and Protection Strategy (WRAPS) reports, preliminary draft TMDL studies, and public noticed TMDL studies and WRAPS reports for the Lower Red River Watershed and the Lake of the Woods Watershed and produce final versions of the TMDL studies and WRAPS reports for each watershed.

Kittson
Lake of the Woods
Marshall
Roseau
Recipient
Middle Fork Crow River Watershed District
2017 Fiscal Year Funding Amount
$152,717
Fund Source

The purpose of this monitoring project is to maintain water quality data collection, build upon existing data for Phase II of the Intensive Watershed Monitoring approach, and develop a better understanding of what impacts the rivers located in central Minnesota specifically in the North Fork Crow Watershed.

Hennepin
Kandiyohi
Meeker
Pope
Stearns
Wright
Recipient
Mille Lacs SWCD
2017 Fiscal Year Funding Amount
$268,747
Fund Source

This grant will fund the creation of a new Coordinator position with a primary focus on the Mille Lacs Lake subwatershed. Although not currently impaired, the Lake faces increasing development and land use pressure. Implementation of protection strategies is essential to the Lake's long-term health but current staffing does not allow sufficient time to be spent on project development and outreach to identify interested landowners.

Aitkin
Crow Wing
Mille Lacs
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$68,033
Fund Source

This project addresses five reaches of the Minnesota River that have aquatic recreation impairments as identified by high concentrations of E. coli. The project will describe the water quality impairments, complete pollutant source assessments, establish loading capacities and allocations for the impairments, and develop implementation strategies.

Big Stone
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Douglas
Faribault
Freeborn
Grant
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Pipestone
Pope
Redwood
Renville
Scott
Sibley
Steele
Stevens
Swift
Waseca
Watonwan
Yellow Medicine
Recipient
Hubbard County SWCD
2017 Fiscal Year Funding Amount
$48,350
Fund Source

Several important milestones will be completed during this phase of the Mississippi River (Headwaters) Watershed Restoration and Protection Strategy (WRAPS) project. These milestones will include the completion of the Stressor ID & Watershed Monitoring and Assessment Reports, the completion of the Zonation Modeling watershed priority planning process (through the continuation of the Civic Engagement project component), and the development of the overall WRAPS report.

Becker
Beltrami
Cass
Clearwater
Hubbard
Itasca
Recipient
Hubbard County Soil and Water Conservation District
2015 Fiscal Year Funding Amount
$120,000
2017 Fiscal Year Funding Amount
$48,349
Fund Source

Several important milestones will be completed during this Phase (Phase II) of the Mississippi River (Headwaters) Watershed Restoration and Protection Strategy (WRAPS) project. These milestones will include the completion of the Stressor ID & Watershed Monitoring and Assessment Reports, the completion of the Zonation Modeling watershed priority planning process (through the continuation of the Civic Engagement project component), and the development of the overall WRAPS report.

Becker
Beltrami
Cass
Clearwater
Hubbard
Itasca
Recipient
North Fork Crow River WD
2017 Fiscal Year Funding Amount
$48,500
Fund Source

The District is seeking to further its goals of meeting multipurpose drainage management requirements under its obligations as a 103E drainage authority. Judicial Ditch 1 is the largest system in the District, and proportionally one of the largest contributors of sediment and nutrients to the downstream reaches of the North Fork Crow River.

Pope
Stearns
Recipient
Middle Fork Crow River Watershed Dist
2017 Fiscal Year Funding Amount
$50,000
Fund Source

This contract will be to initiate the second cycle of the North Fork Crow River Watershed Restoration and Protection Strategies (WRAPS) development. The project will provide needed information and analysis to make sure that implementation strategies are well thought out and targeted. The result will be a framework for civic and citizen engagement and communication, which will contribute to long-term public participation in surface water protection and restoration activities throughout the watershed.

Kandiyohi
McLeod
Meeker
Pope
Stearns
Wright
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$109,928
Fund Source

The goal of this project is to refine the nutrient and algae simulation in the Minnesota River basin using all relevant available sources of information. The outcome of this work order is a revised Hydrological Simulation Program – FORTRAN (HSPF) watershed model application for the Minnesota River basin that correctly represents nutrient sources and algae.

Big Stone
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Dakota
Douglas
Faribault
Freeborn
Grant
Hennepin
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Otter Tail
Pipestone
Pope
Redwood
Renville
Rice
Scott
Sibley
Stevens
Swift
Traverse
Waseca
Watonwan
Yellow Medicine
Recipient
Emmons & Olivier Resources Inc
2017 Fiscal Year Funding Amount
$3,459
Fund Source

This project is a continuation of a Total Maximum Daily Load (TMDL) study that addresses lake eutrophication (phosphorus) in two lakes that are on the 2014 United States Environmental Protection Agency 303(d) list of impaired waters, located in the Pine River Watershed. The contractor will be responding to public comment on the Pine River TMDL.

Aitkin
Cass
Crow Wing
Hubbard
Recipient
Emmons & Olivier Resources Inc
2017 Fiscal Year Funding Amount
$2,427
Fund Source

The purpose of this project is to address Environmental Protection Agency (EPA) comments on the pre-public notice draft Total Maximum Daily Load (TMDL) report that were received by Minnesota Pollution Control Agency (MPCA) in January 2016.

Cass
Crow Wing
Recipient
Sauk River WD
2017 Fiscal Year Funding Amount
$210,570
Fund Source

Pope County Ditch 6 (CD 6) is an 18 mile channelized watershed and a primary tributary to Ashley Creek. CD6 and Ashley Creek are impaired for bacteria, dissolved oxygen and aquatic organisms. This project will address the storm water runoff concerns identified within this public drainage system in conjunction with repairs scheduled for 2017-2018. Alternative intake structures to manage nutrients and other practices, such as water and sediment control basins, will be installed to retain water on the upland properties and minimize flow rate and velocity.

Pope
Recipient
Koochiching County SWCD
2017 Fiscal Year Funding Amount
$99,930
Fund Source

This project will provide an important framework for civic and citizen engagement and communication in the International Rainy River-Lake of the Woods Watershed, which will contribute to long-term public participation in surface water protection and restoration activities.

Cook
Itasca
Koochiching
Lake
Lake of the Woods
St. Louis
Recipient
Lake of the Woods SWCD
2017 Fiscal Year Funding Amount
$143,880
2019 Fiscal Year Funding Amount
$43,283
Fund Source

The Rapid River Watershed Restoration and Protection Strategy (WRAPS) project will result in the development of the restoration and protection strategies for the watershed and engage the local stakeholders in the practices of watershed management. This project will also develop Total Maximum Daily Loads (TMDLs) for impaired waters.

Koochiching
Lake of the Woods
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$49,999
Fund Source

The goal of this project is to extend, calibrate, and validate the existing Hydrological Simulation Program – FORTRAN (HSPF) watershed models in the Red Lake River, Thief River, Clearwater River and Red Lake watersheds.

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$24,984
Fund Source

The goal of this project is to extend, calibrate, and validate the existing Hydrological Simulation Program FORTRAN (HSPF) model for the Snake River Watershed in the Red River Basin. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) Studies. The model will generate predicted output for hydrology, sediment, nutrients, and dissolved oxygen that is consistent with observed data.

Marshall
Pennington
Polk
Recipient
Middle-Snake-Tamarac Rivers Watershed District
2017 Fiscal Year Funding Amount
$134,935
Fund Source

The goal of this project is to utilize the information and data collected in the Phase I project to develop a Watershed Restoration and Protection Strategy (WRAPS) Report and Total Maximum Daily Load (TMDL) Study that will address water quality impairments and maintain or improve water quality throughout the Snake-Middle River Watershed. The Phase II project will allocate pollutant reductions goals, and prioritize and identify implementation strategies to maintain or improve water quality in key streams in the watershed.

Beltrami
Marshall
Pennington
Polk
Recipient
City of Glenwood
2017 Fiscal Year Funding Amount
$10,000
Fund Source

Provide backup power supply to City's wells.

Pope
Recipient
City of Red Lake Falls
2017 Fiscal Year Funding Amount
$1,714
Fund Source

Wire a portable generator for emergency power outages at water treatment plant.

Red Lake
Recipient
City of Walker
2017 Fiscal Year Funding Amount
$2,868
Fund Source

Install security fence around two of the city's municipal wells.

Cass
Recipient
City of Argyle
2017 Fiscal Year Funding Amount
$8,288
Fund Source

Installation of a transfer switch and inlet for generator at city well

Marshall