Minnesota's Legacy

All Projects

Showing 1 - 3 of 3 | Export projects
Recipient
City of Elk River
2011 Fiscal Year Funding Amount
$285,087
Fund Source

Great River Energy (GRE) operates a power plant in the City of Elk River which generates electricity by incinerating municipal solid wastes. The plant is located proximate to the City of Elk River wastewater treatment plant (WWTP). This project will result in a corresponding reduction of groundwater use by GRE.

Sherburne
Recipient
Minnesota Department of Agriculture
2017 Fiscal Year Funding Amount
$13,578
2016 Fiscal Year Funding Amount
$10,048
2015 Fiscal Year Funding Amount
$7,042
2014 Fiscal Year Funding Amount
$13,000
2013 Fiscal Year Funding Amount
$14,400
2012 Fiscal Year Funding Amount
$31,400
2010 Fiscal Year Funding Amount
$60,000
Fund Source

The Clay County Drainage Site is designed to evaluate the environmental impact of both surface and subsurface drainage from agricultural fields. This site includes six subsurface plots and one surface runoff plot, each approximately 24 acres in size. Monitoring stations are fully automated and each individual plot is monitored separately.The soils and topography across this demonstration site are virtually identical and represent field characteristics common in the most productive agricultural areas of the Red River Valley.

Clay
Recipient
Saint Cloud, City of
2014 Fiscal Year Funding Amount
$35,507
Fund Source

The St. Cloud Waste Water Treatment Facility (SCWWTF) is currently conducting long term planning for future biosolids management. The most likely path forward includes dewatering of the digested biosolids, which will produce a supernatant stream with significant phosphorus and ammonia loads that would be returned to the liquids treatment portion of the WWTF. Returning these nutrient loads to the liquids train would result in increases to effluent concentrations, increases in power consumption, or both.

Stearns