Installation of an automatic transfer switch and disconnect, wiring, concrete pad, electrical permit, natural gas connection, and other supporting equipment as necessary for a future generator connection.
Next phase of analysis for test drilling and installation of monitor wells for the installation of production well #4 and possible replacement of well #1.
Hire consultant to provide professional engineering and analysis for site selection options for additional well sites for test wells and future production well.