This project will initiate the process of community engagement in the LeSueur River watershed by assessing the needs and interests of the community and bringing a diverse set of stakeholders together to determine how best to foster action in improving and protecting water quality.
Information was gathered as a follow-up to the public hearing testimony of Liberian immigrants' experience, given to the Truth and Reconciliation Commission in 2008. Interviews were conducted of Liberian people who gave original testimony to the commission to document how they experienced the hearings and what impact the hearings had on those that testified as well as on those that assisted them.
Lily Lake, in Stillwater, is a popular recreational spot for residents with its swimming beach, fishing pier, and canoe access. Lily Lake is impaired by excess nutrients, and restoring its water quality is a priority for the community.
This project will complete updates to existing information and incorporate new information into the Minnesota Stormwater Manual including the Blue Star Assessment tool. Stormwater practitioners use the information and assessment tool to implement the most effective and cost-efficient practices for managing stormwater runoff volume, stormwater pollutants, and to meet regulatory requirements associated with stormwater permits.
A 38-minute documentary video was produced to capture and portray the diversity and vibrancy of the Lincoln Park/West End neighborhood and its history from the late 1880's to 1950's.
Research was conducted for the local churches, schools, businesses, events and the Park. Seven interviews provide insights into the life and times of area residents.
The video was made available to the public via the Duluth public television station, through community showings and at the Public Library.
Completed exterior masonry preservation and rebuild missing entrance column of the Litchfield Opera House which is listed in the National Register of Historic Places. The building envelope is experiencing disintegrating and spalling masonry, cracks in mortar joints and walls, and possible water intrusion. The project restored the physical and visual integrity of the masonry envelope and remove safety threats caused by the unstable parapet.
Four stream segments, totaling over 100 miles, are impaired in the Little Fork River for Total Suspended Solids (TSS). This study will provide local partners with project options for reducing sediment in the Little Fork Watershed. Through the use of sediment fingerprinting determinations can be made if the sediment is from in (or near) channel, or the watershed and identify what sub-watershed the sediment is coming originating.
This program will not only expand an existing WMA by 252 acres for public outdoor recreation (e.g. hunting, fishing, etc.) but it will also protect the viability of the WMA into perpetuity through 634 acres of permanent conservation easements. This project focuses on the Little Nokassippi River Wildlife Management Area (WMA) which was established in 2006 complements to the Army Compatible Use Buffer (ACUB) program and the support from Crow Wing County and the Minnesota Department of Natural Resources (DNR). The WMA is situated within a very critical area of the Camp Ripley ACUB.
This Phase 6 request for Ducks Unlimited’s Living Lakes program will enhance 1,000 acres of shallow lakes and restore 50 acres of small wetlands by engineering and installing water control structures for Minnesota DNR and U.S. Fish & Wildlife Service on public lands and wetlands under easement. Structures will be used by DNR and Service partners to restore wetland hydrology and actively manage shallow lake water levels to enhance their ecology for ducks, other birds, and hunters in the Prairie Region of Minnesota.
Appropriations from the Clean Water Fund allow the Minnesota Department of Health to expand and improve the way groundwater and drinking water protection is implemented at the local level. In 2015, $300,000 was allocated to update wellhead protection areas within groundwater management areas. From 2016 onward, funding will be dedicated to the Groundwater Restoration and Protection Strategies (GRAPS) initiative which will provide groundwater and drinking water information and management strategies on a HUC 8 watershed scale.
Repointed mortar joints, repair/replaceed bricks and inspected south wall on Lodge Zare Zapadu #44, listed in the National Register of Historic Places.
The NCHS's collection of vintage clothing was re-packaged, re-labeled and re-cataloged using proper storage methods. The 232 textiles are now more accessible.
The goal of this project is to identify watershed and in-lake best management practices (BMPs) to improve water quality for impaired water bodies within the Upper Long Lake Creek subwatershed. The existing P8 watershed model and BATHTUB lake response models will be updated and refined to identify BMPs, develop project costs, and estimate nutrient load reductions. A feasibility report will be developed that outlines prioritized projects, estimated load reductions, and project costs to accelerate implementation.
The purpose of this contract is to augment data collection efforts for the St. Louis River (SLR) Watershed Restoration and Protection Strategy (WRAPS) and for four impaired Duluth beaches. For the SLR WRAPS, activities include: attaining datasets for watershed stressors and geomorphic conditions, water quality gap monitoring, and a civic engagement component. Impaired beaches activities include: collection of field observational data, field water chemistry, and water quality samples for analytical analysis.
Beginning in June 2019, the St Louis River Watershed will start the second round of the Watershed Restoration and Protection Strategies (WRAPS) process. This project helps the Carlton County SWCD (SWCD) initiate a broader citizen participation process in the Watershed. The SWCD staff will be enabled to create a greater degree of public interest in and awareness of the general health of the Watershed. This work will create the foundation for greater citizen involvement in the planning and implementation of restoration and protection activities in the Watershed.
The project provides the opportunity for the North Saint Louis Soil and Water Conservation District (NSLSWCD) to engage in efforts to increase public participation in the St. Louis River Watershed and participate in the planning and technical review of the Watershed Restoration and Protection Strategies (WRAPS) process. NSLSWCD contains the headwaters of the St. Louis River Watershed. The District’s knowledge of the area, communities, and organizations puts them in a unique position to work cooperatively in the watershed.
To rehabilitate the interior and exterior of the St. Louis County Jail, a contributing element of the Duluth Civic Center Historic District and listed in the National Register of Historic Places.
DNR achieved the following outcomes using ML2018 funds.
-Restored 4 acres of habitat at Interstate Island for threatened bird species, including a 30,000 sqft nesting area.
-Seeded 3,917 lbs of Manoomin with tribal partners across 28 acres.
-Removed 68,000CY of sediment from Perch Lake restoring coastal marsh and deep water habitat.
-Designed and implemented a portion of the Kingsbury Bay/Creek watershed restoration project contributing to an estimated total reduction of over 400 tons of sediment per year.
This proposal seeks to enhance and restore 35 acres of fish and wildlife habitat on the lower Mississippi River in Houston County benefiting bluegill, crappie, bass, deer and Blue-winged and Prothonotary warblers. Sedimentation in Upper Mississippi River (UMR) backwaters and declining UMR floodplain forests are a concern to resource managers, anglers, hunters and recreational users.
The Rice Creek Watershed District is proposing to improve water quality and habitat in Locke Lake and Lower Rice Creek by stabilizing stream banks and bluffs on Lower Rice Creek, reducing in-stream erosion and sediment delivery to Locke Lake, and improving in-stream habitat complexity for fish and invertebrates. Eleven bank stabilization practices would be installed over a continuous 5,400-foot reach in Lower Rice Creek. The anticipated outcome of this project is the prevention of 2,874 tons per year of sediment, which is 58% of the sediment reduction goals for Lower Rice Creek.
This program resulted in permanent protection of three parcels totaling 350 acres. All three parcels are now being managed as Wildlife Management Areas (WMA) by MN DNR. This exceeds the original goal of 319 acres. Acquisition of two other parcels were attempted, but the offers were turned down by the sellers.
The Lower Mississippi River Habitat Restoration Partnership is a long-term effort to restore habitat connectivity and improve water quality in critical areas along the Mississippi River corridor from the Twin Cities to the Iowa border by reconnecting tributaries to their floodplains, revitalizing backwaters and channels, and protecting and restoring floodplain forests, wetlands, and prairies that are essential to sustaining the incredible diversity of plants, animals, and human uses provided by this great river.
This project will revise a recently completed draft Total Maximum Daily Load (TMDL) report for the Lower Minnesota River Watershed Project. The revision is to correct wasteload allocations for regulated stormwater entities.
To stop the water infiltration that was causing damage to the building, bricks and tuck-pointing were removed and replaced in two areas of external wall at the back and side of the Lyric Theater building.
The damaged areas have now been stabilized and further erosion curtailed. Renovation of the rest of the building can now continue.
The schooner-barge, Madeira, sank off the coast of Minnesota in Lake Superior on November 28, 1905. The GLSPS created an interpretive display to tell the story of this significant wreck that prompted the construction of the Split Rock Lighthouse in 1910. The bollards and attached deck section were salvaged from the wreck and were cleaned and repaired by volunteers to be used in the display. A durable concrete base was constructed, the artifacts moved into place and secured, and interpretive signage (appropriate to the park) was fabricated and installed.