This project protected in fee approximately 1,960 acres in Cass County and 320 acres in Hubbard County of forest habitat that are at significant risk of conversion to row crop agriculture. The project also restored 92 acres jack pine, an increasingly rare tree species, in the project area.
The project involves installation of a number of stormwater best management practices in the road right-of-way and on adjacent public property during reconstruction of Johnny Cake Ridge Road and installation of the Dakota County North Creek Greenway. Practices implemented will include boulevard raingardens, tree trenches, and underground sediment collection practices.
Otter Tail County will partner with the Buffalo-Red River Watershed District and the West Otter Tail and Wilkin SWCDs to stabilize the outlet of Judicial Ditch No. 2 which has become the most critically eroding gully contributing sediment to the Otter Tail River. When stabilized, sediment to the river will be reduced by 988 tons per year, and total phosphorus will be reduced by 840 pounds per year. The sediment reduction associated with this project is 7 percent of the 6,868 tons per year goal set by the Lower Otter Tail River Total Maximum Daily Load.
This project encompasses surface water quality sampling within the Snake River Watershed over a period of two years (2017-18). This is the cycle II monitoring as follow-up to the original Snake River Watershed monitoring 10 years ago as part of the Watershed Restoration and Protection Strategy Report (WRAPS). This project shall provide follow-up data on the waters in the Snake River Watershed in regards to changes in water quality over this 10-year cycle. The current sampling project will entail sampling 5 lakes and 11 stream sites.
To hire a qualified consultant to develop a Historic Structure Report that will help preserve the Kasson Public School, listed in the National Register of Historic Places.
In 2010, the Minnesota Pollution Control Agency listed Keller Lake as impaired for excess nutrients. An in-lake alum application was identified as the primary phosphorus load reduction option for controlling internal phosphorus load in Keller Lake. A recently completed in-lake management feasibility study report indicates that the in-lake alum application is the most cost-effective implementation project that remains for Keller Lake.
The City of Apple Valley will conduct a subwatershed assessment on the sections of Apple Valley draining to Keller Lake to target potential projects. The goal is to identify potential cost effective retrofit projects and operations improvements capable of fulfilling needed phosphorus reductions ahead of a number of planned infrastructure projects tentatively scheduled for 2018-2022.
The purpose of this work is to develop Total Maximum Daily Loads (TMDLs; a federal clean Water Act requirement) for streams and lakes in the Kettle River and Upper St. Croix watersheds. This and other technical information will be used to develop a separate report called a Watershed Restoration and Protection Strategy (WRAPS) report.
This project is to initiate a basic outreach and education plan for the Kettle River Watershed as a first step in a longer-term strategy to engage citizens in watershed problem solving and actions to restore or protect waters. Carlton County has developed the following vision for civic engagement in the Kettle River Watershed: To educate and inspire Kettle River Watershed residents to become more involved and engaged in Water Quality protection and restoration efforts.
Minnesota Civic Youth is dedicated to helping kids and young adults develop the knowledge, skills, confidence and desire to be informed, active citizens. We do this by engaging them in authentic civic experiences and activities that respect their viewpoint and celebrate their voice. We have three primary program areas: Kids Voting Minnesota Network, Governing Youth and Teens Speak Out.
Minnesota's twelve regional public library systems, which encompass 350 public libraries in all areas of the state, benefit from a portion of the Legacy Amendment's Arts and Cultural Heritage Fund. Through State Library Services, a division of the Minnesota Department of Education, each regional public library system receives a formula-driven allocation from the annual $2.5 million Minnesota Regional Library Legacy Grant. Kitchigami Regional Library (KRL) is a consolidated regional public library system in north central Minnesota.
Minnesota’s 12 regional public library systems, which encompass 350 public libraries in all areas of the state, benefit from a portion of the Legacy Amendment’s Arts and Cultural Heritage Fund. Through State Library Services, a division of the Minnesota Department of Education, each regional public library system receives a formula-driven allocation from the annual $2.2 million Minnesota Regional Library Legacy Grant.Kitchigami Regional Library (KRL) is a consolidated regional public library system in north central Minnesota.
Daily language segments that are designed to teach and preserve the Ojibwe language. Segments will be directed towards beginning and intermediate levels and will focus on vocabulary and sentence formation. These segments will introduce, reinforce and maintain a pathway to revitalization, preserving and historically archiving the language as spoken on the White Earth Reservation
We assessed, designed rehabilitation features and permitted 7200 linear feet of river reach in prime spawning areas. We completed construction on over 2200 linear feet of the reach.
SPECIFIC ITEMS:
*Installed approx. 400 feet of toewood bench.
*Graded approx. 500 feet of shoreline to allow river access to floodplain.
To hire a qualified historian to complete an evaluation to determine eligibility for listing in the National Register of Historic Places for a structure in Mountain Lake.
The goal of this project is to establish load reduction requirements for impaired waters and to develop restoration strategies to improve water quality for impaired waters and protection strategies to maintain the quality of water for water bodies meeting standards.
Previous research by the St. Croix Watershed Research Station (SCWRS) has identified lake physics (temperature and oxygen) and nutrient recycling (nitrogen and phosphorus) as key drivers of lake algal blooms. SCWRS will conduct monitoring consistent with the prior research efforts by re-deploying three moored buoys to collect data throughout the 2019 ice-free season, including surface water samples. Additionally, SCWRS will deploy an in situ flourometer to measure total algae and cyanobacteria concentrations and will collect and analyze cyanobacterial toxins.
The purpose of this project is for Lake County Soil and Water Conservation District to continue to assist with the Minnesota Pollution Control Agency’s watershed approach and Watershed Restoration and Protection Strategy (WRAPS) process in the Rainy River Headwaters and Cloquet River watersheds. As part of this, Lake County Soil and Water Conservation District will lead efforts to increase levels of civic engagement and community participation in support of the current WRAPS process.
The goal of this project is to reduce peak stormwater flow discharge, sediment and phosphorus from directly entering Lake Pepin by installing two stormwater infiltration basins treating a total of 15.8 acres of developed residential and commercial area in Lake City in conjunction with the Highway 61 road reconstruction project scheduled for 2020 reducing total phosphorus by 13 pounds per year and sediment by 2 tons per year.
A watershed assessment and water quality treatment plan was completed for the impaired Lake George . This project will address the watershed practices portion of the water quality treatment plan. One regional underground stormwater detention/filtration treatment facility treating a 47-acre drainage area will be installed in partnership with the Tech High School Redevelopment Project. The underground facility will target phosphorus reduction reducing an estimated 27 pounds of phosphorus and 7 tons of sediment annually.
This project proposes to address the largest phosphorus loads discharging from 885 acres to Lake St. Croix through the installation of targeted stormwater treatment best management practices ranked in the top 10 of those prioritized in the 2018 Lake St. Croix Direct Discharge South Stormwater Retrofit Analysis. The goal of this project is to reduce pollutant loading from four small communities to Lake St. Croix by at least ten pounds phosphorous.
The project will increase lake and river access e.g. dock and carry-in portage; provide trails and small gathering space on Echo Point; restore and re-naturalize the park with trees, shrubs and native perennials; improve the layout and/or capacity picnic ground and campground; and other master plan approved improvements. The project includes design, engineering, construction and construction administration.
Minnesota's twelve regional library systems, which encompass more than 350 public libraries in all areas of the state, can benefit from a portion of the Legacy Amendment's Arts and Cultural Heritage Fund. Through State Library Services, a division of the Minnesota Department of Education, each regional library system is eligible to receive a formula-driven allocation from the annual $2.5 million Minnesota Regional Library System Legacy Grant. Lake Agassiz Regional Library (LARL) is a consolidated regional public library system in northwestern Minnesota.
The goal of this project is to finalize the Lake Pepin Watershed phosphorus total maximum daily load (TMDL) report by using the existing information and documentation prepared under previous contracts to prepare one TMDL report that addresses the impairments on the mainstem of the Mississippi River. Information developed to date for draft TMDLs on the Minnesota River mainstem will be documented for later use by the Minnesota Pollution Control Agency.
This project is to conduct water chemistry monitoring at two subwatershed sites and two major watershed sites based on flow conditions, targeting runoff events using protocols defined in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. The data collected will be submitted to Minnesota Pollution Control Agency (MPCA) and used for calculating pollutant loads. This loading information, in turn, will be used at both the state and local level to guide policy and strategies for the restoration and protection of Minnesota’s waters.
The Riley-Purgatory-Bluff-Creek Watershed District and the City of Eden Prairie are working together to implement projects to remove Lake Riley and Rice Marsh Lake from the impaired waters list. One key emerging issue is to evaluate potential internal phosphorous loading within stormwater ponds in the lakes? subwatersheds. This project will also use updated pond data from the city?s intensive pond inspection program to identify other phosphorus reduction opportunities. The proposed assessment will quantify formerly undocumented P loading to Rice Marsh Lake and Lake Riley.
Minnesota’s twelve regional library systems, which encompass more than 350 public libraries in all areas of the state, can benefit from a portion of the Legacy Amendment’s Arts and Cultural Heritage Fund. Through State Library Services, a division of the Minnesota Department of Education, each regional library system is eligible to receive a formula-driven allocation from the annual $2.2 million Minnesota Regional Library System Legacy Grant. Lake Agassiz Regional Library (LARL) is a consolidated regional public library system in northwestern Minnesota.
The Rainy River - Rainy Lake, Rainy River - Baudette and Rapid River Watershed Assessments will include the waters of the Baudette River, Black River, Peppermint Creek, Rapid River, Rat Root River and Winter Road River in Koochiching and Lake of the Woods Counties. This assessment focuses on collection of water chemistry and field parameters at the 12 key sites identified and modified by the Minnesota Pollution Control Agency (MPCA). Five of the sites will have extra total phosphorus and chlorophyll analysis completed as identified by the MPCA for collecting river nutrients.
This project will complete the Total Maximum Daily Load (TMDL) study and Watershed Restoration and Protection Strategies (WRAPS) for the Lake Superior North watershed. Two segments of the Flute Reed River are impaired for aquatic life due to elevated turbidity and total suspended solids. The lower Poplar River is also listed as impaired but significant progress has occurred in the last 10 years. A TMDL and implementation plan have been completed for the lower Poplar River impairment. All other waters meet water quality standards and will be considered for protection measures.