Judicial Ditch No. 2 Outlet Gully Stabilization Project

Project Details by Fiscal Year
2019 Fiscal Year Funding Amount
$298,000
Fund Source
Clean Water Fund
Recipient
Otter Tail County
Recipient Type
Local/Regional Government
Status
Completed
Start Date
January 2019
Activity Type
Grants/Contracts
Counties Affected
Otter Tail
Wilkin
Otter Tail
Wilkin
Project Overview

Otter Tail County will partner with the Buffalo-Red River Watershed District and the West Otter Tail and Wilkin SWCDs to stabilize the outlet of Judicial Ditch No. 2 which has become the most critically eroding gully contributing sediment to the Otter Tail River. When stabilized, sediment to the river will be reduced by 988 tons per year, and total phosphorus will be reduced by 840 pounds per year. The sediment reduction associated with this project is 7 percent of the 6,868 tons per year goal set by the Lower Otter Tail River Total Maximum Daily Load.

Project Details

Projects and Practices 2019

Competitive Grant Making Body
Advisory Group Members and Qualifications
Conflict of Interest Disclosed
No
Conflict of Interest Contact

Annie Felix-Gerth

Legal Citation / Subdivision
Laws of Minnesota 2017, Chapter 91, Article 2, Section 7(b)
Appropriation Language

for grants to protect and restore surface water and drinking water; to keep water on the land; to protect, enhance, and restore water quality in lakes, rivers, and streams; and to protect groundwater and drinking water, including feedlot water quality and subsurface sewage treatment system projects and stream bank, stream channel, shoreline restoration, and ravine stabilization projects. The projects must use practices demonstrated to be effective, be of long-lasting public benefit, include a match, and be consistent with total maximum daily load (TMDL) implementation plans, watershed restoration and protection strategies (WRAPS), or local water management plans or their equivalents. A portion of these funds may be used to seek administrative efficiencies through shared resources by multiple local governmental units.

2019 Fiscal Year Funding Amount
$298,000
Other Funds Leveraged
$74,627
Direct expenses
$298,000
Administration costs
$3,005
Proposed Measurable Outcome(s)

Sediment Load will be reduced by 988 tons per year. When considering distance between the J.D. No. 2 and the Lower Otter Tail River TMDL reach, the sediment reduction associated with this project is 7 percent of the 6,868 tons per year TMDL goal.

Measurable Outcome(s)

This project has resulted in an estimated annual reduction of 1102.5 pounds of Phosphorus, 1250.5 tons of Sediment.

Proposed Outcomes Achieved
achieved proposed outcomes
Source of Additional Funds

LOCAL LEVERAGED FUNDS

Recipient Board Members
Members for Otter Tail County are:
Project Manager
First Name
Kevin
Last Name
Fellbaum
Organization Name
Otter Tail County
State
MN
Phone
218-998-8492
Email
kfellbau@co.ottertail.mn.us
Administered By
Administered by
Location

520 Lafayette Road North
St. Paul, MN 55155

Phone
651- 296-3767