Lake George Water Quality Improvement Project
A watershed assessment and water quality treatment plan was completed for the impaired Lake George . This project will address the watershed practices portion of the water quality treatment plan. One regional underground stormwater detention/filtration treatment facility treating a 47-acre drainage area will be installed in partnership with the Tech High School Redevelopment Project. The underground facility will target phosphorus reduction reducing an estimated 27 pounds of phosphorus and 7 tons of sediment annually.
Projects and Practices 2019
Annie Felix-Gerth
for grants to protect and restore surface water and drinking water; to keep water on the land; to protect, enhance, and restore water quality in lakes, rivers, and streams; and to protect groundwater and drinking water, including feedlot water quality and subsurface sewage treatment system projects and stream bank, stream channel, shoreline restoration, and ravine stabilization projects. The projects must use practices demonstrated to be effective, be of long-lasting public benefit, include a match, and be consistent with total maximum daily load (TMDL) implementation plans, watershed restoration and protection strategies (WRAPS), or local water management plans or their equivalents. A portion of these funds may be used to seek administrative efficiencies through shared resources by multiple local governmental units.
27 lbs of phosphorus & 14,700 lbs of sediment removed annually by the treatment system; 47 acres of runoff treated with a 27,848 cubic feet of storage system; 1,500 people will learn about the project through education efforts; Lake George delisted.
This project has resulted in an estimated annual reduction of 29.7 pounds of Phosphorus, 11.8 tons of Sediment.
LOCAL LEVERAGED FUNDS