Project will focus on BMP's that reduce runoff and/or keep water on the land. The establishment of 8 native plantings on 153 acres using an approved 15 native species mix on marginal farm fields will significantly reduce runoff of sediments and nutrients, and act as a filter to remove nutrients and sediment from fields upslope. Based on RUSLE2 estimates, 336.6 tons/yr of soil will be saved, and 202 lbs/yr of phosphorus and 3,336 lbs/yr of nitrates will not runoff the fields and/or leach into the ground water.
This contract is for Itasca County Soil and Water Conservation District (SWCD) to assist in the public participation activities in Rainy Basin Watersheds of Little Fork and Big Fork.
Jackson SWCD will collect water chemistry data at three sites; West Fork Little Sioux River, Little Sioux River, and the Loon Lake Outlet. A full suite of lab and field parameters will be collected May - September in 2011 and 2012 at all three sites.
The St. Paul Historic Preservation Commission hired a qualified consultant to complete the local Historic Preservation Site Designation form for the Jacob Schmidt Brewing Company Historic District. After commission review and a public hearing the proposed historic district was recommended for approval to the St. Paul City Council. The City Council adopted the Jacob Schmidt Brewing Company Historic District as a Heritage Preservation Site along with the Preservation Program. The ordinance was adopted in July, 2011.
To conduct a conservation survey of 95 works of Francis Lee Jaques housed at three Minnesota museums.
A conservation survey was conducted for the artworks of Francis Lee Jacques from the Bell Museum, the Jacques Art Center and the St. Louis county Historical Society. Nine out of 95 works out were identified and prioritized based on condition. Each of the nine works received a treatment proposal and an estimate for its conservation needs.
To document perceptions of identity and legacy through 15 oral history interviews with residents of a Jewish long-term care system in the Twin Cities. The project focused on capturing quickly disappearing histories from people who grew up in Minnesota’s immigrant communities or came to Minnesota as Russian immigrants or Holocaust survivors.
The project involves installation of a number of stormwater best management practices in the road right-of-way and on adjacent public property during reconstruction of Johnny Cake Ridge Road and installation of the Dakota County North Creek Greenway. Practices implemented will include boulevard raingardens, tree trenches, and underground sediment collection practices.
Otter Tail County will partner with the Buffalo-Red River Watershed District and the West Otter Tail and Wilkin SWCDs to stabilize the outlet of Judicial Ditch No. 2 which has become the most critically eroding gully contributing sediment to the Otter Tail River. When stabilized, sediment to the river will be reduced by 988 tons per year, and total phosphorus will be reduced by 840 pounds per year. The sediment reduction associated with this project is 7 percent of the 6,868 tons per year goal set by the Lower Otter Tail River Total Maximum Daily Load.
The 14,080 acre watershed of JD#30 and JD#18 drains into the Thief River four miles upstream of Thief River Falls. The City of Thief River Falls draws their drinking water from the reservoir the Thief River supplies. This reservoir is filling with sediment faster than anticipated. It was first estimated that the reservoir would require dredging every 50 years. The last dredging was needed in only 35 years at a price tag of $1.1 million. Treatment of the water for drinking is a major expense to the City.
This project will gather watershed data necessary for the development of a comprehensive watershed management plan with parameter-specific thresholds that will maintain or improve water quality for the Kawishiwi Watershed.
In 2010, the Minnesota Pollution Control Agency listed Keller Lake as impaired for excess nutrients. An in-lake alum application was identified as the primary phosphorus load reduction option for controlling internal phosphorus load in Keller Lake. A recently completed in-lake management feasibility study report indicates that the in-lake alum application is the most cost-effective implementation project that remains for Keller Lake.
The purpose of this work is to develop Total Maximum Daily Loads (TMDLs; a federal clean Water Act requirement) for streams and lakes in the Kettle River and Upper St. Croix watersheds. This and other technical information will be used to develop a separate report called a Watershed Restoration and Protection Strategy (WRAPS) report.
Minnesota's twelve regional public library systems, which encompass 350 public libraries in all areas of the state, benefit from a portion of the Legacy Amendment's Arts and Cultural Heritage Fund. Through State Library Services, a division of the Minnesota Department of Education, each regional public library system receives a formula-driven allocation from the annual $2.5 million Minnesota Regional Library Legacy Grant. Kitchigami Regional Library (KRL) is a consolidated regional public library system in north central Minnesota.
Minnesota’s Legacy Amendment raises revenue for Clean Water, Outdoor Heritage, Parks and Trails, and Arts and Cultural Heritage. Libraries are beneficiaries of a portion of the Arts and Cultural Heritage Funding.
To capture the experiences of several generations of Kittson County war veterans, six individuals with direct combat or combat support experience, were interviewed. The transcriptions of each first-person narrative were printed and are now part of the Kittson County Historical Society permanent archives. Supplemental materials including photographs and additional information were used to highlight each story and to bring the reader deeper into the stories. A presentation notebook was created and a copy presented to each interviewee.
In order to update a control system that had surpassed its life-expectancy and to maintain a proper museum environment, the SCHS upgraded the HVAC system control software and front end computer. They were replaced with a new KMC LAN controller and Total Control software. The new system provides improved emvironmental control and energy conservation.
To initiate research at five adjacent archaeological sites in the Boundary Waters Canoe Area Wilderness, which will inform an eventual National Register of Historic Places nomination.
We assessed, designed rehabilitation features and permitted 7200 linear feet of river reach in prime spawning areas. We completed construction on over 2200 linear feet of the reach.
SPECIFIC ITEMS:
*Installed approx. 400 feet of toewood bench.
*Graded approx. 500 feet of shoreline to allow river access to floodplain.
Project between Minnesota Department of Natural Resources and United States Army Corp of Engineers at Knowlton Creek Watershed to address a large amount of sediment deposited into the St. Louis River Area of Concern (AOC).
Previous research by the St. Croix Watershed Research Station (SCWRS) has identified lake physics (temperature and oxygen) and nutrient recycling (nitrogen and phosphorus) as key drivers of lake algal blooms. SCWRS will conduct monitoring consistent with the prior research efforts by re-deploying three moored buoys to collect data throughout the 2019 ice-free season, including surface water samples. Additionally, SCWRS will deploy an in situ flourometer to measure total algae and cyanobacteria concentrations and will collect and analyze cyanobacterial toxins.
The purpose of this project is for Lake County Soil and Water Conservation District to continue to assist with the Minnesota Pollution Control Agency’s watershed approach and Watershed Restoration and Protection Strategy (WRAPS) process in the Rainy River Headwaters and Cloquet River watersheds. As part of this, Lake County Soil and Water Conservation District will lead efforts to increase levels of civic engagement and community participation in support of the current WRAPS process.
The goal of this project is to reduce peak stormwater flow discharge, sediment and phosphorus from directly entering Lake Pepin by installing two stormwater infiltration basins treating a total of 15.8 acres of developed residential and commercial area in Lake City in conjunction with the Highway 61 road reconstruction project scheduled for 2020 reducing total phosphorus by 13 pounds per year and sediment by 2 tons per year.
A watershed assessment and water quality treatment plan was completed for the impaired Lake George . This project will address the watershed practices portion of the water quality treatment plan. One regional underground stormwater detention/filtration treatment facility treating a 47-acre drainage area will be installed in partnership with the Tech High School Redevelopment Project. The underground facility will target phosphorus reduction reducing an estimated 27 pounds of phosphorus and 7 tons of sediment annually.
This project proposes to address the largest phosphorus loads discharging from 885 acres to Lake St. Croix through the installation of targeted stormwater treatment best management practices ranked in the top 10 of those prioritized in the 2018 Lake St. Croix Direct Discharge South Stormwater Retrofit Analysis. The goal of this project is to reduce pollutant loading from four small communities to Lake St. Croix by at least ten pounds phosphorous.
The project will increase lake and river access e.g. dock and carry-in portage; provide trails and small gathering space on Echo Point; restore and re-naturalize the park with trees, shrubs and native perennials; improve the layout and/or capacity picnic ground and campground; and other master plan approved improvements. The project includes design, engineering, construction and construction administration.
Minnesota's twelve regional library systems, which encompass more than 350 public libraries in all areas of the state, can benefit from a portion of the Legacy Amendment's Arts and Cultural Heritage Fund. Through State Library Services, a division of the Minnesota Department of Education, each regional library system is eligible to receive a formula-driven allocation from the annual $2.5 million Minnesota Regional Library System Legacy Grant. Lake Agassiz Regional Library (LARL) is a consolidated regional public library system in northwestern Minnesota.
The goal of this project is to finalize the Lake Pepin Watershed phosphorus total maximum daily load (TMDL) report by using the existing information and documentation prepared under previous contracts to prepare one TMDL report that addresses the impairments on the mainstem of the Mississippi River. Information developed to date for draft TMDLs on the Minnesota River mainstem will be documented for later use by the Minnesota Pollution Control Agency.