The Wright Soil and Water Conservation District has partnered with the Crow River Organization of Water and the Natural Resources Conservation Service on phase three of a comprehensive sediment reduction project that focuses on stabilizing seven of the most active gully erosion sites on the North Fork Crow River. These seven areas were chosen due to the high level of turbidity and low dissolved oxygen within that stretch of the North Fork Crow River, which has led to biological and turbidity impairments.
Continue Implementation of adopted Master Plan to include a splash pad (small artistic interactive water feature with year-round interest.) Indian Mounds hosts approximately 344,000 visits annually, including 13% of both African Americans and Asians, and 3% Native Americans.
During the 2016 Legislative Session, the Minnesota State Legislature asked the Minnesota Humanities, $75,000 the first year is for a grant to the city of St. Paul or Ramsey County to develop and install activity facilities in parks for Takraw courts that are reflective of the current demographics in Ramsey County. This grant is available if the recipient provides at least a 25 percent match for funding.
To contract with qualified professionals to prepare planning documents that will help preserve the Cummins-Phipps-Grill House, listed in the National Register of Historic Places.
The goal of this project is to increase fluency and proficiency in the Dakhota language by creating a Dakhota Dictionary Mobile App that is linguistically accurate and widely accessible for both adult and youth language learners in the classroom and for individual study. The Dakhota Dictionary Mobile App will expand the Dakhota language lexical database's value as an archive preserving the Dakhota language, while presenting an accessible and vibrant new resource to a large and growing community of Dakhota language learners.
Design, engineer and reconstruct parking lots and driveways including demolition, grading, curb and gutter, paving, landscaping, parking lot lighting, trail lighting, utilities, retaining walls and associated storm water improvements at the Hyland-Bush-Anderson Lakes Regional Park Reserve, in particular, West Bush Lake Park. If project costs come in lower, City would utilize funds to install lighting on trail between Bandshell and Chalet parking lot.
Design, engineer and construct segment of the trail including grade separated crossing at Hwy 110 and Dodd Road intersection and a connection to Valley Park.
Design and construction of Tamarack Nature Center Campus Site and Infrastructure consisting of parking lot and roadway redevelopment, storm water management, pedestrian connections, landscape restoration, signage, and other site amenities at Bald Eagle-Otter Lakes Regional Park; supplement construction cost for Early Childhood Learning Center Project; supplement construction cost for the Tamarack Nature Center Interior Remodel project. *(There were 99,352 visits to the Tamarack Nature Center in Bald Eagle Otter Lake Regional Park in 2013).
Phase 1 Design/Development Trailhead Rice Ck No RT, bituminous and natural surface trails, trailhead building with restrooms, entrance road and parking lot development, cross country ski staging area and trails, signage, storm water management, habitat restoration, landscaping.
Design, engineer, and reconstruct the trail bridge between Nicollet Island and BF Nelson Park. The bridge is a crucial trail link along the Mississippi River
Design, engineer, and construct Hall's Island and the Park on the Scherer Site within Above the Falls Regional Park, based on the Metropolitan Council approved Master Plan for that park.
At Central Mississippi Regional Park, implement the master plan including design, engineering, and construction of trails, pedestrian/bicycle/vehicle circulation, landscaping improvements, ramps, stairs, and walls, buildings, stormwater management, historic resources, neighborhood connections, and natural habitat restoration.
Design, engineering and construction of a picnic shelter with restroom facilities. Site work will include grading, erosion control, and stormwater management.
Project includes additional design, engineering, easements, potential acquisitions, construction of safety improvements related to the regional trail project specifically at intersections of the trail and private businesses and rail properties.
Project will complete the design and engineering required for renovation of the bathroom buildings and the boat rental building within the main day-use recreation area of Baker Park Reserve
Project will complete the design and engineering necessary to construct 3.4 miles of paved trail connecting Lowry Nature Center in Carver Park to Lake Minnetonka Regional Park
Design, Engineering, Construction Administration and Construction of 4.6 acres of paved parking lots and 1.5 miles of paved roads within Lake Minnetonka Regional Park.