Design, engineer & reconstruct parking and driveways at West Bush Lake inside Hyland-Bush-Anderson Lakes Park Reserve

Project Details by Fiscal Year
2018 Fiscal Year Funding Amount
$220,684
Fund Source
Parks & Trails Fund
Recipient
Bloomington
Status
Completed
Start Date
July 2017
End Date
June 2020
Counties Affected
Hennepin
Hennepin
Project Overview

Design, engineer and reconstruct parking lots and driveways including demolition, grading, curb and gutter, paving, landscaping, parking lot lighting, trail lighting, utilities, retaining walls and associated storm water improvements at the Hyland-Bush-Anderson Lakes Regional Park Reserve, in particular, West Bush Lake Park. If project costs come in lower, City would utilize funds to install lighting on trail between Bandshell and Chalet parking lot.

Project Details

Hyland/Bush/Anderson Lakes Park Reserve - Bloomington

Legal Citation / Subdivision
M.L. 2017, Chp. 91, Art. 3, Sec. 4 (SFY 2018) PTLF
Appropriation Language

Sec. 4. METROPOLITAN COUNCIL$16,584,000$18,891,000
(a) $16,584,000 the first year and $18,891,000 the second year are for distribution according to Minnesota Statutes, section 85.53, subdivision 3.
(b) Money appropriated under this section and distributed to implementing agencies must be used only to fund the list of projects approved by the elected representatives of each of the metropolitan parks implementing agencies. Projects funded by the money appropriated under this section must be substantially consistent with the project descriptions and dollar amounts approved by each elected body. Any funds remaining after completion of the listed projects may be spent by the implementing agencies on projects to support parks and trails.
(c) Grant agreements entered into by the Metropolitan Council and recipients of money appropriated under this section must ensure that the funds are used to supplement and not substitute for traditional sources of funding.
(d) The implementing agencies receiving appropriations under this section shall give consideration to contracting with Conservation Corps Minnesota for restoration, maintenance, and other activities.

2018 Fiscal Year Funding Amount
$220,684
Proposed Measurable Outcome(s)

Measure and report the square feet of parking lots and driveways reconstructed, the number of boat ramps and parking lot lights, the number of stormwater BMPs installed or retrofitted, and the number of trail lights and linear feet of trails newly illuminated.

Measurable Outcome(s)

respectively), new lighting, one raingarden to treat stormwater which was previously untreated, two new retaining walls. At Normandale Lake, path lighting includes 3 solar powered trail lights for a portion of path not lit previously, six new poles and LED fixtures to improve safety on the trail.

Recipient Board Members
City Council
Project Manager
First Name
Ann Kattreh
Street Address
1800 West Old Shakopee Rd
City
Bloomington
State
MN
Zip Code
55431
Phone
952-563-8876
Email
akattreh@ci.bloomingtonMN.gov
Administered By
Administered by
Location

390 N. Robert Street
St. Paul, MN 55101

Phone
651-602-1000