Tetra Tech will gather information for eventual incorporation into the Minnesota Stormwater Manual. The Stormwater Manual is used by stormwater practitioners to make decisions related to stormwater management, such as selecting appropriate Best Management Practices, meeting stormwater regulatory requirements, and determining pollutant and stormwater volume reductions associated with implementation of different stormwater management practices. The goal is to update existing information and provide new information on active construction site erosion prevention and sediment control.
Continue and enhance contract management and customer service to OHF pass-through appropriation recipients for approximately 130 open grants. Ensure funds are expended in compliance with appropriation law, state statute, grants policies, and approved accomplishment plans.
Provide continued contract management and customer service to ENRTF pass-through appropriation recipients. Ensure funds are expended in compliance with appropriation law, state statute, grants policies, and approved work plans.
In conjunction with the Board of Soil and Water Resources (BWSR), the Minnesota Pollution Control Agency (MPCA) is developing a process for public participation that can be used across Minnesota Water Quality Framework programs such as 1 Watershed, 1 Plan, Watershed Restoration and Protection Strategies (WRAPS), Total Maximum Daily Load (TMDL) studies, and others. This contract will provide support for a northern Minnesota Soil and Water Conservation District (SWCD) to assist in shaping the statewide guidance.
The South St. Louis SWCD will collaborate with the City of Duluth to implement 13 stormwater BMPs in two high priority parks in the Miller Creek Watershed. The proposed BMP locations were prioritized by the city & SWCD based on the desire to coordinate with upcoming construction planned for Lincoln Park & on the sediment impacts resulting from worsening erosion problems in Piedmont Park.
Coordinating with Partner's - A Parks and Trails Strategic Objective is a program area representing DNR's commitment to one of the four pillars identified in the 25 year Legacy plan. The Legacy plan identifies its purpose to enhance coordination across the large and complex network of public, private, and non-profit partners that support Minnesota's parks and trails to ensure seamless, enjoyable park and trail experiences for Minnesotans.
An existing shelter and restroom facility will be replaced by a new multi use building at Cottage Grove Ravine Regional Park. The building may include restrooms, storage space, multi-purpose lobby space, equipment staging area and fire ring.
The Cottonwood River watershed is one of the last remaining watersheds to complete Cycle I of the Watershed Restoration & Protections Strategies (WRAPS) process. The scope of this project upon completion is have two reports developed; a Watershed Restoration and Protection Strategies report and a Total Maximum Daily Load (TMDL) for the entire watershed.
This project continues accelerated production of County Geologic Atlases to support informed management of water and mineral resources. This work is essential to sustainable management of water.
The Minnesota Pollution Control Agency (MPCA) offers grants to counties for Subsurface Sewage Treatment System (SSTS) program administration and special projects to improve SSTS compliance rates, and assistance for low-income homeowners with needed SSTS upgrades. The MPCA will determine grant allocations based on applications review; funds will flow to counties through the Board of Water and Soil Resources' Natural Resources Block Grants.
The DNR works with the Minnesota Geological Survey (MGS) to convey valuable geologic and groundwater information and interpretations to government units at all levels, but particularly to local governments, private organizations and citizens. The MGS focuses on geology (Part A reports) and DNR focuses on groundwater (Part B reports). These provide useful information for projects completed by community planners, industry, agriculture, citizens and state agencies related to groundwater.
Phase 5 of the Minnesota Land Trust's Critical Shoreland Habitat Program protected approximately 3.75 miles of shoreland and 417 acres of associated high-quality habitat in Minnesota's Northeast region by securing five permanent conservation easements in strategic locations along priority lakes and rivers. Conservation easements secured under this program are perpetual and will prevent fragmentation and destruction of existing habitat.
The project goal is to conduct water chemistry monitoring at five subwatershed sites and two basin sites annually from 2016-2019, based on flow conditions, targeting runoff events using protocols defined in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. The data collected will be submitted to Minnesota Pollution Control Agency (MPCA) and used in the FLUX32 model for calculating pollutant loads.
Crow Wing County, in cooperation with the municipalities within the County, plans to continue its successful well sealing program that pays 50% of the cost to seal / abandon wells up to a maximum of $1000 per well. Priority will be given to wells located in or near existing wellhead protection areas.
This project will emphasize restoring and enhancing approximately 260 acres of various permanently protected habitats, and acquiring approximately 154 acres of permanent conservation easements or fee title. Project sites include Lake Byllesby Regional Park, land adjacent to Regional Park Reserves and Regional Greenways, Chub and Marcott Lakes, rivers and streams, and hydric soil areas. Habitats will include forest, grassland, wetland, and riparian areas throughout the County.
Create user-friendly, research-based energy storage guide and decision tools (print and web-based) for community-scale sites with renewable energy and do three geographically dispersed battery storage demonstration projects, through broad stakeholder-expert engagement.
This project will develop a watershed wide Total Maximum Daily Load (TMDL) study and River Eutrophication Standard (RES) TMDL report for water quality impairments in the Des Moines River basin, which includes the Des Moines River Headwaters, Lower Des Moines River, and East Fork Des Moines River watersheds.
Project will complete the design and engineering required for renovation of the bathroom buildings and the boat rental building within the main day-use recreation area of Baker Park Reserve
Design, engineer and reconstruct rest rooms building, maintenance garage, driveway, sidewalks, lighting, utilities, associated storm water improvements including demolition, grading, curb and gutter, paving, retaining wall construction and landscaping at the Hyland-Bush-Anderson Lakes Regional Park Reserve.