Supplement improvements for a trailhead facility south of Co. Rd. I including design/engineering, construction, demolition, grading, landscaping, trails, parking, building, roads, stormwater management, utilities, signage, site and play equipment, amenities, habitat restoration, access to the water trail, lighting.
Design, engineer and construct parking lot and restroom trailhead for Mississippi River Regional Trail in Pine Bend SNA in Inver Grove Heights. 2013 annual visitation: 70,900.
To increase Traverse County Fair's capacity to feature arts and cultural heritage programming by erecting a stage dedicated to arts and entertainment. The stage, complete with lighting, will be home to arts, cultural performances, and educational events during the fair, and will also be used for farmer’s market during the summer.
Minnesota’s 12 regional public library systems, which encompass 350 public libraries in all areas of the state, benefit from a portion of the Legacy Amendment’s Arts and Cultural Heritage Fund. Through State Library Services, a division of the Minnesota Department of Education, each regional public library system receives a formula-driven allocation from the annual $3 million Minnesota Regional Library Legacy Grant.
Minnesota’s twelve regional library systems, which encompass more than 350 public libraries in all areas of the state, can benefit from a portion of the Legacy Amendment’s Arts and Cultural Heritage Fund. Through State Library Services, a division of the Minnesota Department of Education, each regional library system is eligible to receive a formula-driven allocation from the annual $2.2 million Minnesota Regional Library System Legacy Grant. Traverse des Sioux Library System (TdS) is a federated regional public library system providing central services located in southcentral Minnesota.
This project will improve surface water quality within the sediment degraded Trout Brook, a designated trout stream and tributary to the Cannon River. The project will focus on the installation of best management practices that will reduce the amount of sediment transport within the watershed. Approximately 20 practices will be installed through this project which will reduce an estimated 2,000 tons of sediment per year.
Turnaround Arts: Minnesota supports low performing schools in using the arts as a tool for improvement. Participating schools have demonstrated increased academic achievement, increased student and family engagement, and improved school culture and climate. At the national level Turnaround Arts is a signature program of the President’s Committee on the Arts and the Humanities. Turnaround Arts: Minnesota is run by Perpich Center for Arts Education and works with schools pre-K through 8th grade.
The final outcome of this project will be a chloride management plan which will lay out a strategy for addressing chloride impacts to our surface waters for the 7-county metropolitan area. This chloride management plan will satisfy EPA requirements for impaired waters, address waters not yet listed, and develop a strategy to protect waters that are currently meeting the water quality standards. This management plan will also include implementation activities for reducing chloride to TCMA waters as well as identify high priority areas to target implementation activities.
This project will provide the MPCA and all local partners in the Twin Cities Metropolitan Area (TCMA) the information and tools necessary to improve and/or maintain water quality with respect to chloride for the 7-county metropolitan area during the winter maintenace period.
The purpose of this grant is to produce quality (written and spoken) language materials, general use by different language revitalization efforts (colleges, communities, schools), and increased language learning for mulitple audience.
The goal of this project is to assess groundwater sustainability in the I-94 corridor between the Twin Cities and St. Cloud due to the corridor's significant expected growth, the inerent natural limits of groundwater, and the vulnerability of groundwater to contamination.
Increase rural community capacity to teach and transmit Dakota language. Create a safe, nurturing immersion - learning environment that actively engages 15 intergenerational families in learning and speaking Dakota together through traditional Dakota lifeways.
Fund stewardship projects at Clifton French Regional Park that focus on upgrading facilities that have reached their normal end-of-life. Project improvements include a new Creative Play Area, complete rebuild of parking lots and roads, and complete rebuild
This project will target three identified drainage systems contributing to one tributary outfall to Long Lake, an impaired water body of the Sauk River Chain of Lakes. These systems produce large volumes of stormwater runoff that degrades the tributary and compromise water quality.
Phase II of the Upper South Branch Project will continue a FY2011 CWF project with the strategic implementation of conservation practices within the Upper South Branch of the Buffalo River watershed. This second phase will result in approximately 305 acres of new filter strips, 50 side inlet sediment control structures, and 8 sediment control basins which will reduce sediment loading to the stream by 4,700 tons/year and phosphorus by 9,700 pounds/year.
This project will restore a sub-watershed by implementing a treatment train of practices. There are 275 acres in this sub-watershed, located directly upstream of the Upper Iowa River. The topography lends itself to flashy stormwater events which leave their mark on the upland gully erosion and severely degraded streambank. The watershed operates as a funnel, bringing the high velocity water to a concentrated area and shooting it through the banks, rather than over. This has lead to a site which is void of vegetation and six streambank blowouts within a 300 foot area of streambank.
The goal of this project is to gather and collect necessary watershed data for the development of a Watershed Restoration and Protection Strategy (WRAPS) for the Upper/Lower Red Lakes Watershed that includes impairments, their causes, and plans for restoration. Implementation of the WRAPS will maintain or improve water quality for the watershed.
The primary goal of this project is to examine the calibration and validation of recently extended Hydrological Simulation Program – FORTRAN (HSPF) watershed models for the Mississippi River-Headwaters, Mississippi River-Grand Rapids, Mississippi River-Brainerd, Mississippi River-Sartell, Mississippi River-St. Cloud, Leech Lake, Pine River, Crow Wing River, Long Prairie River, and Redeye River watersheds and revise the calibration.
This project will provide MPCA staff, local partners and citizen volunteers with a framework for building local capacity to design civic engagement and communication/outreach efforts that will contribute to meaningful and sustained public participation in surface water protection and restoration activities throughout the watershed.