This program annually evaluates a sample of up to fifteen Outdoor Heritage Fund restoration and enhancement projects, provides a report on the evaluations in accordance with state law and delivers communications on project outcomes and lessons learned in restoration practice.
Central Mississippi Riverfront Regional Park, revise master plan to guide future trail development and improvements throughout park including Father Hennepin Bluffs, Nicollet Island, BF Nelson, Boom Island, and Mill Ruins.
The Rice Creek Watershed District (RCWD) will create a web-based, mobile-compatible public drainage system inspection and maintenance database. This database system will enable District staff to create and track maintenance requests and inspections from the field, including Geo-referencing locations requiring repair via a mobile device. The system will greatly reduce the time required to identify and log each maintenance request, enabling staff to inventory more miles of public drainage system yearly thereby identifying erosion problems more efficiently and thoroughly.
Rice Lake, in Stearns County, is an impaired water for nutrients that has a Total Maximum Daily Load (TMDL) Implementation plan developed. Rice Lake is one of the larger lakes in the county, offering major water recreation opportunities, economic benefits as well as fish and wildlife habitat. It is a priority for Stearns County to implement projects that have positive impacts on this resource.
This project will engage the public and community partners in Rice County. The goal of this project is the implementation of conservation practices that retain water on the land by providing up to five sub-grants for rain gardens, vegetative buffers, and wetland restorations.
Under the CREP partnership with USDA, 71 easements were recorded on a total of 4,365 acres to restore previously drained wetlands and adjacent uplands. The easements were accomplished with local implementation done by SWCD, NRCS and FSA staff within the 54 county CREP area and leveraged federal funds for both landowner payments and cost share for conservation practice installation.
The Clean Water Fund (CWF) and Outdoor Heritage Fund (OHF) were used together to secure easements on buffer areas. 84 easements have been recorded for a total of 1,441 acres and are reported in the output tables for the final report (acre total does not include Clean Water Fund acres). The total acreage from both CWF and OHF sources for recorded easements is 2,793.2 acres. Only the OHF acres are being reported in this final report to be consistent with the approved accomplishment plan.
The Reinvest in Minnesota (RIM) Wetlands Partnership Phase V protected and restored 2,041 acres of previously drained wetlands and adjacent native grasslands on 23 conservation easements. All easements have been recorded. $35,000 of funds from other sources were also used.
Lilydale-Harriet Island Regional Park. Continued phased implementation of approved Lilydale Regional Park Master Plan elements that may include such amenities as construction of approx. 3,000 lineal feet of roadway, trail, and related facilities. Lilydale
Como Regional Park. Continue implementation of the Master Plan to include completion of Estabrook Road reconstruction and installation of Historic Lantern-style lighting from west end of the Frog Pond to intersection at Lexington Parkway.
The project replaced asphalt shingles from the late 1960s with wooden shingles to complete a restoration project started in 2007, the repair the roof of the District No. 44 School, listed in the National Register of Historic Places. It involved removing two layers of shingles and inspecting the underlying sheathing, making historically accurate repairs where necessary, and re-shingling the school with wooden shingles.
The Nature Conservancy acquired in fee 3 properties that added 143 acres to the RJ Doer Memorial Hardwood Forest. The Minnesota Land Trust protected 3 properties with perpetual easements totaling 526 acres. The Nature Conservancy enhanced 396 acres of high priority habitat (bluff prairie and oak savanna) on existing state forest and Scientific and Natural Area lands, and an additional 35 acres on new fee acquisitions.
The goal of this project is to complete the construction, calibration, and validation of an Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Minnesota portions of three watersheds: Root River, Upper Iowa, and Mississippi River-Reno.
This is the second phase of the Roseau River Watershed Restoration and Protection Strategy (WRAPS) project, which includes: developing the Total Maximum Daily Load (TMDL) study, pollutant load allocations, watershed restoration and protection strategies, and conducting civic engagement.
255 acres were acquired in 2021 using OHF funding. These are acres allowed the dike to be aligned with the beach ridge of the lake.
Construction of Phase 1 (see map) was initiated in September 2023. The northwest embankment was built and a weir steering the main flow of the Roseau River into a natural oxbow was installed. A water control structure (on Pine Creek) and finishing work on the dike will be completed this year.