The purpose of this contract is to establish an international watershed coordinator for the Rainy River- Lake of the Woods (RR-LOW) watershed. The coordinator will assist the Minnesota Pollution Control Agency (MPCA) in facilitating and enhancing civic engagement and public participation activities through collaboration and integration of the efforts of groups working on watershed activities at local, state/provincial, tribal, and bi-national levels.
To improve access to the historic 1918 barn on the fairgrounds by adding ventilation and cooling. Listed on the National Register of Historic Places, the barn once served as the county poor farm. Today, it's home to various 4-H and youth programming.
To celebrate the 100th Anniversary of the Ramsey County Fair by providing new history programming. The fair will feature demonstrations of "lost arts" such as canning, quilting, and woodwork, in addition to creating a video featuring fair history and a written narrative.
Ramsey County has over 3,500 acres tied to faith based organizations and schools. On average, these properties contribute one billion gallons of stormwater runoff, 3,000 pounds of phosphorus, and 1,000 tons of sediment to local water bodies. The Ramsey Conservation District (RCD) in partnership with local property owners and watershed districts/water management organizations will install 6-12 stormwater projects that will help protect and improve water quality of surrounding lakes.
The Rapid River Watershed Restoration and Protection Strategy (WRAPS) project will result in the development of the restoration and protection strategies for the watershed and engage the local stakeholders in the practices of watershed management. This project will also develop Total Maximum Daily Loads (TMDLs) for impaired waters.
The Bluff Creek Watershed TMDL Implementation Plan evaluated the stream power index for each of the gullies identified in the 1996 Management Plan. Based upon this terrain analysis, sediment loading rates from the 1999 to 2008 P8 modeling results, and modeled surface runoff, known erosion sites were prioritized. This site, which is tributary to Bluff Creek and the Minnesota River, was given the highest priority ranking.
Lake Minnewaska, a highly used recreational lake, is the largest body of water in Pope County. While scientific studies show that the transparency in Lake Minnewaska has been increasing over the last 30 years, there are numerous ravines on the south shore of Lake Minnewaska that could threaten this trend. The erosion in these ravines is causing large amounts of sediment and phosphorus to be dumped directly into Lake Minnewaska. After a storm in 2011, many trees vegetating the ravines were blown down, ripping out the roots and further exposing the soil along these ravines.
To gain physical and intellectual control through a professional inventory of approximately 12,000 objects documenting Renville County history using PastPerfect Museum Software
The overall goal of this project is to perform water quality monitoring and load calculation duties to accomplish Minnesota Pollution Control Agency (MPCA) Watershed Pollutant Load Monitoring Network (WPLMN) monitoring efforts at the seven sites within the Redwood and Cottonwood River watersheds as well as the Minnesota River site near Morton. To accomplish this goal the requested funds will provide for technician’s time, mileage, lab costs, supplies, as well as equipment calibration and upkeep.
US Geological Survey (USGS) will perform real-time water quality monitoring at its stations located in Fargo and Grand Forks. The Minnesota Pollution Control Agency co-sponsors this work along with USGS, North Dakota Dept. of Health, the cities of Fargo, Moorhead, Grand Forks, and East Grand Forks.
This project will collect real-time parameter data for specific conductance, water temperature, pH, dissolved oxygen, turbidity and stream flow at the United States geological Survey (USGS) gaging stations located at Fargo, ND and Grand Forks, ND on the Red River of the North; and publish the data both on the USGS NWIS website and in the USGS Annual Report.
To offer demonstrations and classes of cultural heritage. The Red Lake County Fair will offer demonstrations and workshops by local artists in quilt making, basket weaving, logging, baking, bluegrass, gospel, Native American dance, and country music.
To build a mobile stage with lighting and sound to use for musical events or plays. The traveling stage will be used to increase access to arts and cultural heritage programming at the fair and around the county.
The goal of this project is to development a Total Maximum Daily Load (TMDL) study that addresses all of the non-mercury-related impaired reaches along the Red River of the North (RRN). The TMDL study will provide an analytical and strategic foundation for recommending restoration strategies for impaired waters. This phase of the project will also include civic engagement efforts by providing water quality framework and stakeholder activities for civic/citizen engagement and communication.
This project is for Minnesota Legislative Clean Water Fund funding to engage citizens in local watershed monitoring, to work with regional partners to promote understanding and protection of watersheds, and to organize and facilitate gathering of scientific data all for the benefit of water quality in the Red River Basin.
The International Water Institute (IWI) will monitor 42 sites (3 basin, 12 major watershed, and 27 subwatershed) in the Red River and Upper Mississippi River Basins intensively during the contract period. There will also be 5 sites in the Red River Basin where mercury samples will be collected and sent to Minnesota Department of Health for analysis. The IWI will collect water samples across the range of flow conditions targeting sample collection at times of moderate to high flow.
Supplement design and construction cost for the redevelopment of the existing playground in the Upper Afton section of Battle Creek Regional Park consisting of demolition, grading, utilities, trails, lighting, construction, landscaping, site amenities, signage, new playground container and playground equipment, and safety surfacing The plan is to improve accessibility and play value.
We will investigate road salt alternatives and pavement innovations that will reduce or eliminate the flux of chloride from road salt into our lakes, streams and groundwater.
To increase Redwood County Fair's capacity to feature diverse arts and cultural heritage performances by expanding a current stage. The stage enhancement will allow room for multiple artists to perform at once, and will offer the audience a better sight-line for performances. Funds will also be used to hire a writer to publish pieces in local newspapers, the fair website, and facebook, to inform the public of the competitive and historical nature of the open class exhibits at the fair.
To hire a qualified and experienced HVAC engineer to evaluate current system preparatory to better control of the Redwood County History Museum environment
The Redwood and Cottonwood River Watersheds have been assessed and many reaches have been impaired for turbidity, bacteria, and low dissolved oxygen. This project will accelerate conservation efforts to reduce overland runoff sediment, bacteria, and nutrient loadings contributing to water quality impairments in targeted subwatersheds.
The Redwood River and Cottonwood River watersheds encompass approximately 2,020 square miles of southwestern Minnesota in the Minnesota River Basin. Land use in these watersheds is mostly agricultural and area geology makes them prone to erosion. Surface water issues within the two watersheds are a concern of local leaders. The counties and Soil and Water Conservation District leaders formed the Redwood Cottonwood Rivers Control Area (RCRCA) Joint Powers Board in 1983 to address sedimentation, water quality and quantity, and erosion issues.
Design, engineer, & construct rehabilitation projects associated with existing trails, bridges, habitat enhancement, stormwater management and water quality infrastructure, and signage. Exact project extents and tasks will be refined during project scoping and included in the project's grant agreement.
Rehabilitation of Kenilworth Channel within the Minneapolis Chain of Lakes Regional Park to address failing walls and shorelines. Work will include design, engineering, and construction of earthwork, walls, natural habitat restoration, and landscaping.
Rehabilitate Minnehaha Regional Park Pavilion to upgrade public spaces including restrooms, open seating areas, plaza spaces, stairs, ramps, and landscaping. Work will include design, engineering, architecture, and construction