Rehabilitate Minnehaha Regional Park Pavilion to upgrade public spaces including restrooms, open seating areas, plaza spaces, stairs, ramps, and landscaping. Work will include design, engineering, architecture, and construction
Renewal of existing State Trail surfaces, parking areas, and trail wayside areas, improving accessibility, enhancing user safety and implementing current best management practices. MNDNR Parks and Trails Division has a identified approximately 85 miles of existing state trail in need of rehabilitation and upgrading. This program also focuses on the rehabilitation or replacement of existing state trail bridges, including structural engineering inspections of all trail bridges .
The language and cultural needs of the American Indian community in the Twin Cities urban area are high. Additionally, the urban area has Dakota and Ojibwe tribal members, as well as, other tribal members.
This program annually evaluates a sample of up to twenty-five Outdoor Heritage Fund habitat restoration and enhancement projects, provides a report on the evaluations in accordance with state law and delivers communications on project outcomes and lessons learned in restoration practice.
Restores 420 acres of high-quality forests at Itasca, Jay Cooke, Scenic, Forestville Mystery Cave and Wild River State Parks and Greenleaf Lake State Recreation Area.
Amphipods are wetland invertebrates that are critical wildlife food and indicators of water quality. We will assess reasons they are missing from Prairie Potholes and unique methods to restore amphipods.
Ecological restorations aim to aid the recovery of native ecosystems that have been degraded or lost. However, very seldom are restorations evaluated past the initial implementation phase to determine whether the efforts achieved their goals and the funds spent were a strategic conservation investment. Monitoring and evaluation of restorations can teach what works and what does not in order to advance restoration practices and increase the likelihood of success for future projects.
State law (M.L. 2011, First Special Session, Ch. 6) directs restoration evaluations to be conducted on habitat restoration projects completed with funds from the Parks and Trails Fund (M.S. 85.53). The Minnesota Department of Natural Resources (DNR) is responsible for convening a Restoration Evaluation Panel containing at least five technical experts who will evaluate a sample of up to 10 habitat restoration projects annually. The Panel will evaluate the restorations relative to the law, current science, stated goals and standards in the restoration plans, and applicable guidelines.
This program annually evaluates a sample of up to ten Outdoor Heritage Fund habitat restoration projects and provides a report on the evaluations in accordance with state law (M.S. 97A.056, Subd. 10).
Central Mississippi Riverfront Regional Park, revise master plan to guide future trail development and improvements throughout park including Father Hennepin Bluffs, Nicollet Island, BF Nelson, Boom Island, and Mill Ruins.
The Rice Creek Watershed District (RCWD) will create a web-based, mobile-compatible public drainage system inspection and maintenance database. This database system will enable District staff to create and track maintenance requests and inspections from the field, including Geo-referencing locations requiring repair via a mobile device. The system will greatly reduce the time required to identify and log each maintenance request, enabling staff to inventory more miles of public drainage system yearly thereby identifying erosion problems more efficiently and thoroughly.
Rice Lake, in Stearns County, is an impaired water for nutrients that has a Total Maximum Daily Load (TMDL) Implementation plan developed. Rice Lake is one of the larger lakes in the county, offering major water recreation opportunities, economic benefits as well as fish and wildlife habitat. It is a priority for Stearns County to implement projects that have positive impacts on this resource.
This project will engage the public and community partners in Rice County. The goal of this project is the implementation of conservation practices that retain water on the land by providing up to five sub-grants for rain gardens, vegetative buffers, and wetland restorations.
The Clean Water Fund (CWF) and Outdoor Heritage Fund (OHF) were used together to secure easements on buffer areas. 25 easements have been recorded for a total of 672.1 acres and are reported in the output tables for the final report (acre total does not include Clean Water Fund acres). The total acreage from both CWF and OHF sources for recorded easements is 1,152.4 acres. Only the OHF acres are being reported in this final report to be consistent with the approved accomplishment plan.
Under the CREP partnership with USDA, 28 easements were recorded on a total of 2,390 acres to restore previously drained wetlands and adjacent uplands. Two easements are RIM wetland easements that were required to complete wetland restoration work on an adjacent easement secured with 2018 Wetlands funding. The landowners received the RIM-Only payment rate. The easements were accomplished with local implementation done by SWCD, NRCS and FSA staff within the 54 county CREP area and leveraged federal funds for landowner payments and conservation practices.
The Reinvest in Minnesota (RIM) Wetlands Partnership Phase V protected and restored 2,041 acres of previously drained wetlands and adjacent native grasslands on 23 conservation easements. All easements have been recorded. $35,000 of funds from other sources were also used.
Lilydale-Harriet Island Regional Park. Continued phased implementation of approved Lilydale Regional Park Master Plan elements that may include such amenities as construction of approx. 3,000 lineal feet of roadway, trail, and related facilities. Lilydale
Como Regional Park. Continue implementation of the Master Plan to include completion of Estabrook Road reconstruction and installation of Historic Lantern-style lighting from west end of the Frog Pond to intersection at Lexington Parkway.
The project replaced asphalt shingles from the late 1960s with wooden shingles to complete a restoration project started in 2007, the repair the roof of the District No. 44 School, listed in the National Register of Historic Places. It involved removing two layers of shingles and inspecting the underlying sheathing, making historically accurate repairs where necessary, and re-shingling the school with wooden shingles.
The purpose of this project is to assess the amount of land in the Root River watershed that is treated by structural best management practices (BMPs); more specifically, Water and Sediment Control Basins. The 2016 Root River Watershed Restoration and Protection Strategy (WRAPS) report recommended reducing sediment loss from upland areas and reducing nitrate loading to streams from runoff. Understanding the location and density of these BMPs will is important for targeting future watershed protection and restoration efforts.
The Nature Conservancy acquired in fee 3 properties that added 143 acres to the RJ Doer Memorial Hardwood Forest. The Minnesota Land Trust protected 3 properties with perpetual easements totaling 526 acres. The Nature Conservancy enhanced 396 acres of high priority habitat (bluff prairie and oak savanna) on existing state forest and Scientific and Natural Area lands, and an additional 35 acres on new fee acquisitions.
The Mille Lacs Soil and Water Conservation District (SWCD) will assist the Minnesota Pollution Control Agency (MPCA) with water quality monitoring and pollutant load calculations at two sites in the Rum River Watershed. Approximately 20-25 grab samples per site between ice-out and October 31, 2019 will be collected along with field measurements and observations. Samples will be collected using procedures described in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance (SOPG).