This program annually evaluates a sample of up to fifteen Outdoor Heritage Fund restoration and enhancement projects, provides a report on the evaluations in accordance with state law and delivers communications on project outcomes and lessons learned in restoration practice.
This program annually evaluates a sample of up to twenty Outdoor Heritage Fund habitat restoration projects, provides a report on the evaluations in accordance with state law and delivers communications on project outcomes and lessons learned in restoration practice. Accomplishments are summarized in the attached 2019 Annual Report. The 2019 report focuses specifically on stream restoration.
Utilizing the new CREP III partnership to secure permanent conservation easements, this Phase 7 continuation of the RIM Buffers Program will protect and restore riparian buffer areas, totaling 4,106 acres on approximately 244 easements. This Program will continue to utilize a science-based ranking and selection process and be implemented locally, working with SWCD, NRCS, and FSA staff in the 54 county CREP area. It is estimated that $1 of OHF will be leveraged with $1 of Clean Water Funds and at least $4 of Federal funds through CREP.
Under the CREP partnership with USDA, 71 easements were recorded on a total of 4,365 acres to restore previously drained wetlands and adjacent uplands. The easements were accomplished with local implementation done by SWCD, NRCS and FSA staff within the 54 county CREP area and leveraged federal funds for both landowner payments and cost share for conservation practice installation.
Under the CREP partnership with USDA, 38 easements were recorded on a total of 2,732 acres to restore previously drained wetlands and adjacent uplands. One easement is a flowage easement that was required to complete wetland restoration work on an adjacent
The Clean Water Fund (CWF) and Outdoor Heritage Fund (OHF) were used together to secure easements on buffer areas. 84 easements have been recorded for a total of 1,441 acres and are reported in the output tables for the final report (acre total does not include Clean Water Fund acres). The total acreage from both CWF and OHF sources for recorded easements is 2,793.2 acres. Only the OHF acres are being reported in this final report to be consistent with the approved accomplishment plan.
Per Minnesota Law, the Minnesota Humanities Center administers the Arts and Cultural Heritage Rondo Commemorative Plaza grant. The Humanities Center uses a portion of the funds to provide grants administration, including overseeing the proposal process, agreement drafting, financial and program monitoring, and reporting.
This grant will fund an expected 44 projects in 4 subwatersheds (South Fork Root River, Crooked Creek, Rush-Pine and portions of the headwaters of the Middle and South Branch Root) and 2 DWSMAS (Chatfield and Utica). Projects include grassed waterways, WASCOBs, grade stabilization structures and cover crops, plus field walkovers, project development, and technical assistance. The anticipated sediment reduction from this work will be 2,285.5 tons, or 2.2% of the 10-year goal for the entire planning area.
The Root River Watershed Pollutant Load Monitoring Network (WPLMN) project will continue existing efforts to calculate seasonal pollutant loads for the Root River. The Fillmore Soil and Water Conservation District (SWCD) will assist the Minnesota Pollution Control Agency (MPCA) with water quality monitoring and pollutant load calculations for five subwatershed sites. Samples will be collected using procedures described in the WPLMN standard operating procedures.
The goal of this project is to complete the construction, calibration, and validation of an Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Minnesota portions of three watersheds: Root River, Upper Iowa, and Mississippi River-Reno.
To hire qualified technicians to upgrade the heating, ventilating, and air conditioning (HVAC) system at St. Rose of Lima, listed in the National Register of Historic Places.
This is the second phase of the Roseau River Watershed Restoration and Protection Strategy (WRAPS) project, which includes: developing the Total Maximum Daily Load (TMDL) study, pollutant load allocations, watershed restoration and protection strategies, and conducting civic engagement.
255 acres were acquired in 2021 using OHF funding. These are acres allowed the dike to be aligned with the beach ridge of the lake.
Construction of Phase 1 (see map) was initiated in September 2023. The northwest embankment was built and a weir steering the main flow of the Roseau River into a natural oxbow was installed. A water control structure (on Pine Creek) and finishing work on the dike will be completed this year.