PROJECT OVERVIEW The Reinvest in Minnesota (RIM) Wetlands Reserve Program restores wetlands and grasslands through the purchase of permanent conservation easements on privately owned land. The easements limit future land use and put conservation plans in place for future management. The Minnesota Board of Soil and Water Resources is using this appropriation to accelerate the RIM Wetlands Reserve Program resulting in additional permanently protected wetlands and grasslands throughout the state.
The RIM-WRP Partnership permanently protected 5,559 acres of priority wetlands and associated upland native grassland wildlife habitat via perpetual conservation easements on 60 sites and leveraged over $11 million of federal Wetlands Reserve Program funds.
To provide a variety of programming at the Winona County Fair that preserves and promotes Minnesota's history and cultural heritage. Art demonstrations will feature painting, watercolor, drawing, oils, spinning, weaving, and quilting. Visitors will be able to view antique tractors and learn about their history and restoration process. Children can watch a marionette show and learn about ventriloquism. The fair will feature a bluegrass band and a dog sledding display.
This program focuses on the rehabilitation or replacement of existing state trail bridges, including structural engineering inspections of all trail bridges . Of the more than 300 existing bridges on State Trails, the majority are wood or masonry former railroad structures of which more than 1/3 exceed 100 years old. Starting in fiscal year 2014, future PAT reporting will not separate bridges from trails outcomes reporting, as they are part of the same system of recreational use.
This project works to reduce energy consumption and model renewable energy methods on state park, state recreation area, state forest and trail facilities. The DNR Parks and Trails Division is working to increase the use of energy conservation and renewable energy technologies.
Renewal of existing State Trail surfaces, parking areas, and trail wayside areas, improving accessibility, enhancing user safety and implementing current best management practices. MNDNR Parks and Trails Division has a identified approximately 85 miles of existing state trail in need of rehabilitation and upgrading. This program also focuses on the rehabilitation or replacement of existing state trail bridges, including structural engineering inspections of all trail bridges .
To preserve the 1861 school house by reinforcing the foundation, repairing the roof to preserve the artifacts inside the school, and restoring the interior walls and ceilings. During the fair, the Blue Earth County Historical Society will dress in period costumes to entertain and educate fairgoers, and allow visitors to interact with school desks, maps, slate chalkboards, and school books from the era the school was in operation.
St. Croix Bluffs Regional Park. Replace campground shower building, dump station, well, septic, provide electric to campsites, water distribution to campground, trails, parking, and related infrastructure, landscaping.
Bunker Hills Regional Park, replace wave pool filtration system. Rice Creek Chain of Lakes Regional Park, design and reconstruct roads, campsites, utilities, landscaping.
The language and cultural needs of the American Indian community in the Twin Cities urban area are high. Additionally, the urban area has Dakota and Ojibwe tribal members, as well as, other tribal members.
Ecological restorations aim to aid the recovery of native ecosystems that have been degraded or lost. However, very seldom are restorations evaluated past the initial implementation phase to determine whether the efforts achieved their goals and the funds spent were a strategic conservation investment. Monitoring and evaluation of restorations can teach what works and what does not in order to advance restoration practices and increase the likelihood of success for future projects.
To restore and repair windows on the Soo Line Depot, listed in the National Register of Historic Places and current home of the Cuyuna Iron Range Heritage Museum.
Sixteen more portraits of Minnesota governors will be cleaned and protected with the addition of high-quality, non-glare/UV filtering plexiglass. The portraits of Minnesota’s governors grace the halls of the Minnesota State Capitol and provide an important legacy of the state’s past and present leaders.
State law (M.L. 2011, First Special Session, Ch. 6) directs restoration evaluations to be conducted on habitat restoration projects completed with funds from the Parks and Trails Fund (M.S. 85.53). The Minnesota Department of Natural Resources (DNR) is responsible for convening a Restoration Evaluation Panel containing at least five technical experts who will evaluate a sample of up to 10 habitat restoration projects annually. The Panel will evaluate the restorations relative to the law, current science, stated goals and standards in the restoration plans, and applicable guidelines.
In the North Fork Crow River Watershed, land use is mainly row crop agriculture with an extensive drainage system. Many of the existing tile lines have open intakes that transport sediment and nutrients to open ditches that drain to the North Fork Crow River. The river flows into Rice Lake which has elevated phosphorus levels. Studies show a major source of phosphorus loading comes from animal manure. Field applied manure has potential to runoff to open tile intakes being a direct path to surface water.
This program annually evaluates a sample of up to ten Outdoor Heritage Fund habitat restoration projects and provides a report on the evaluations in accordance with state law (M.S. 97A.056, Subd. 10).
The SRRWD has successfully acquired fee title to 257 acres of land that encompasses the headwaters of the Shell Rock River located at the Albert Lea Lake outlet. This 257 acre parcel will now be a Minnesota Department of Natural Resources Aquatic Management Area (AMA) guided by an Aquatic Management Plan.
Central Mississippi Riverfront Regional Park, revise master plan to guide future trail development and improvements throughout park including Father Hennepin Bluffs, Nicollet Island, BF Nelson, Boom Island, and Mill Ruins.
The purpose of this project is to increase awareness of environmental stewardship practices by providing six subgrants to local community partners. This program aims to engage the public, provide education on conservation practices and install up to eight conservation practices. This includes rain gardens, vegetative buffers and wetland restorations. Each subgrant will reduce the movement of sediment, nutrients and pollutants, retain water on the land and increase environmental awareness to the residents of Rice County.
The Rice Creek Watershed District (RCWD) will create a web-based, mobile-compatible public drainage system inspection and maintenance database. This database system will enable District staff to create and track maintenance requests and inspections from the field, including Geo-referencing locations requiring repair via a mobile device. The system will greatly reduce the time required to identify and log each maintenance request, enabling staff to inventory more miles of public drainage system yearly thereby identifying erosion problems more efficiently and thoroughly.
Rice Lake, in Stearns County, is an impaired water for nutrients that has a Total Maximum Daily Load (TMDL) Implementation plan developed. Rice Lake is one of the larger lakes in the county, offering major water recreation opportunities, economic benefits as well as fish and wildlife habitat. It is a priority for Stearns County to implement projects that have positive impacts on this resource.
This project will engage the public and community partners in Rice County. The goal of this project is the implementation of conservation practices that retain water on the land by providing up to five sub-grants for rain gardens, vegetative buffers, and wetland restorations.
This project will complete the final Implementation Plan, semi-annual and final reports and hold project meetings. The Implementation Plan will identify target areas and priorities for implementation strategies to improve water quality for Bluff Creek. This project will build the groundwork so Bluff Creek will meet water quality standards for aquatic life in the future.
The Reinvest in Minnesota (RIM) Wetlands Partnership Phase V protected and restored 2,041 acres of previously drained wetlands and adjacent native grasslands on 23 conservation easements. All easements have been recorded. $35,000 of funds from other sources were also used.
Lilydale-Harriet Island Regional Park. Continued phased implementation of approved Lilydale Regional Park Master Plan elements that may include such amenities as construction of approx. 3,000 lineal feet of roadway, trail, and related facilities. Lilydale
Como Regional Park. Continue implementation of the Master Plan to include completion of Estabrook Road reconstruction and installation of Historic Lantern-style lighting from west end of the Frog Pond to intersection at Lexington Parkway.