To stabilize structural elements on the Pattern Shop, a contributing building in the St. Paul, Minneapolis, and Manitoba Railway Company Shops Historic District listed in the National Register of Historic Places, and now used as a social services facility.
To hire a qualified consultant to develop a Historic Structure Report that will help preserve the St. Paul Public Library/James J. Hill Reference Library, listed in the National Register of Historic Places.
Hardwood Creek Regional Trail. Complete paving and other improvements to Hardwood Creek Regional Trail, which may include new trail sections toward Bald Eagle Regional Park.
Construction was completed in 2018 on the three components that made up the major infrastructure project at Pelican Lake - construction of a gravity outlet, water control structure, and pump lift station. This work will allow for a drawdown and enhancement of Pelican Lake to return it to what was once one of the region's premier waterfowl and wetland wildlife habitats. Ducks Unlimited provided the engineering and construction oversight of this significant project.
Since 1976, Penumbra Theatre has ignited dialogue and social action in the Twin Cities and beyond by presenting original, compelling works grounded in the history of African American artistic expression and social justice. The 2016-2017 season marks Penumbra's 40th anniversary, and MNHS is developing an exhibit on the theater's rich history and legacy, in partnership with Penumbra and the University of Minnesota Libraries Archives and Special Collections.
The Perpich Arts Integration Network of Teachers (PAINT) fosters collaborative arts integration in Minnesota through K-12 teacher professional development and funding to schools. With Perpich Center facilitation, teacher teams develop and implement arts-integrated lessons and units. PAINT program components include:
Perro Creek drains directly into the nutrient impaired St. Croix River. This project focuses on landowner outreach, design and installation of up to 10 bioinfiltration best management practices to reduce pollution from 85 acres of urban land draining directly into Perro Creek, then into Lake St. Croix with no water quality treatment. The installation of these practices will not only reduce stormwater volumes, but also the nutrients that are the root cause of the nutrient impairment in Lake St. Croix as well as the stormwater bacteria contributions to Perro Creek.
The purpose of the Minnesota Department of Agriculture's monitoring activities is to determine the presence and concentration of pesticides in Minnesota's groundwater and surface water. Monitoring information is used to characterize and assess the extent of pesticide impacts to Minnesota's water resources.
This project will fund the stream restoration of a failed, 30-year old sediment control structure in the Deer Creek subwatershed using natural channel design methods to restore the stream to a stable state. Since the dam breached an estimated 78 tons of sediment is transported annually to the turbidity-impaired Deer Creek.
Increases in crop prices have reduced the acreage of land in conservation set-aside programs such as the Conservation Reserve Program and other marginal land use. Significant conversion of grasslands to cultivated agricultural crops has increased the levels of runoff and sedimentation. Phase III of this project addresses the need to protect vulnerable sites by installing water and sediment basins. These basins are earthen embankments built to temporarily detain sediment-laden runoff, allowing sediment to settle out before runoff is discharged.
To revitalize our Dakota language and increase the use of our language through classes, immersion efforts and activities promoting Dakota use throughout the community.
This project is a continuation of a Total Maximum Daily Load (TMDL) study that addresses lake eutrophication (phosphorus) in two lakes that are on the 2014 United States Environmental Protection Agency 303(d) list of impaired waters, located in the Pine River Watershed. The contractor will be responding to public comment on the Pine River TMDL.
The purpose of this project is to address Environmental Protection Agency (EPA) comments on the pre-public notice draft Total Maximum Daily Load (TMDL) report that were received by Minnesota Pollution Control Agency (MPCA) in January 2016.