Partial funding to reconstruct parking lots, driveways, parking lot lighting, boat ramp improvements and associated storm water improvements at the Hyland-Bush-Anderson Lakes Regional Park Reserve.
This project is for Minnesota Legislative Clean Water Fund funding to engage citizens in local watershed monitoring, to work with regional partners to promote understanding and protection of watersheds, and to organize and facilitate gathering of scientific data all for the benefit of water quality in the Red River Basin.
The International Water Institute (IWI) will monitor 42 sites (3 basin, 12 major watershed, and 27 subwatershed) in the Red River and Upper Mississippi River Basins intensively during the contract period. There will also be 5 sites in the Red River Basin where mercury samples will be collected and sent to Minnesota Department of Health for analysis. The IWI will collect water samples across the range of flow conditions targeting sample collection at times of moderate to high flow.
The Red Lake Watershed District will create an inspection database for 103E ditches under their drainage authority. The district will acquire a database software solution to conduct field inspections and to track ditch maintenance projects and use the software to facilitate compliance with state statutes. The project will also develop a process for completing the annual inspection and reporting requirements under Statue 103E.
The purpose of this project is to improve understanding of primary productivity in the Red River and the diversity and population structure of the algal communities occurring along the river system. This will be accomplished through taxonomic identification of periphyton and phytoplankton assemblages necessary for characterizing responses to nutrient gradients along the Red River of the North.
To complete a critical .52 mile segment of recreational trail along the Mississippi Riverfront that will connect Levee Park in Red Wing's Historic Downtown to the local and regional trail system
The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.
The goal of this project is to construct, calibrate, and validate a watershed model using the Hydrological Simulation Program FORTRAN (HSPF) model for the Upper/Lower Red Lake Watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) Studies. The model will generate predicted output for hydrology, sediment, nutrients, and dissolved oxygen that is consistent with observed data.
Many lakes in Minnesota are classified as “impaired” for aquatic recreation and aquatic life as the result of nonpoint source pollution. These impairments can be addressed by the citizens that live by and have a vested interest in these water bodies, but there is often a lack of knowledge and resources to take effective action. The Freshwater Society is using this appropriation to train citizen groups in lake ecology and management in order to guide them in implementing water quality improvement projects for their local water bodies.
The Aitkin County Soil and Water Conservation District will partner with local lake associations and other eligible community partners to reduce the impacts of storm water runoff and retain water on the land. We will implement a mini-grant program that will install rain gardens and native vegetation buffers along shorelines using deep-rooted native vegetation that will filter runoff, promote infiltration, and control stormwater runoff and soil erosion.
The goal of this project is to continue best management implementation according to the Redwood River Phase II Implementation Plan (1999) and install phosphorus and total suspended solids (TSS) reducing conservation practices that will help achieve the Lower Minnesota River dissolved oxygen Total Maximum Daily Load (TMDL), and the Minnesota River Turbidity TMDL. The proposed implementation of conservation practices include: water and sediment control basins, grassed waterways, grade stabilizations and streambank stabilizations.
To hire qualified professionals to repair the North Star Blankets sign on the North Star Woolen Mill, listed in the National Register of Historic Places.
To hire a qualified consultant to prepare planning documents that will help preserve the Howard Lake City Hall, listed in the National Register of Historic Places.
Partner Organizations: Winona County Historical Society and Theatre du Mississippiona
Winona County Historical Society and Theatre du Mississippi will partner to produce a new interpretive program for the Historic William Bunnell House in 2015. They will conduct research to produce an hour-long script based on the lives of families who lived in the house and the period they lived there. This new program will create a purpose for a house museum which has been languishing.
The Reinvest in Minnesota (RIM) Wetlands Partnership Phase VI protected and restored 1,391 acres of previously drained wetlands and adjacent grasslands on 15 conservation easements.
Bald Eagle-Otter Lakes Regional Park preliminary design development plans for trail development to connect Tamarack Nature Center to the Otter Lake boat launch at Bald Eagle-Otter Lakes Regional Park.
Install fishing piers at 20 statewide locations (15 replacements and 5 new) with the goal of improving fishing opportunities especially for people with disabilities, children, elderly and those without a boat.
Renewal of existing State Trail surfaces, parking areas, and trail wayside areas, improving accessibility, enhancing user safety and implementing current best management practices. MNDNR Parks and Trails Division has a identified approximately 85 miles of existing state trail in need of rehabilitation and upgrading. This program also focuses on the rehabilitation or replacement of existing state trail bridges, including structural engineering inspections of all trail bridges .
The primary outcome of this project will be to work with five local landowners to implement BMPs that focus on protection of the Renville County portion of the Minnesota River- Mankato Watershed from elevated nutrient levels, in particular phosphorus. This project will utilize outreach and education to incorporate public involvement and input into targeted BMP implementation and the decision making process of watershed issues.