To hire an architect for pre-development work to improve public accessibility at the Proctor Area Historical Society and better comply with the Americans with Disabilities Act.
These funds are used for financial monitoring and oversight of the Minnesota Zoo’s legacy funds, including regular review of legacy fund expenditures, financial reporting, budget management, and assisting program staff in work planning for legacy projects. This amount also includes human resource and IT support for legacy funds, as appropriate.
Included in this line are the direct costs of the Legacy project manager and related expenses, along with a portion of the statewide indirect costs billed by MMB. MNHS has followed the guidance provided by MMB in the calculation of the indirect cost rate, assessing the costs under the formula and calculation of the federal indirect cost rate as approved and audited by our cognizant federal agency, the Department of the Interior. This cost is allocated to the various projects.
-Train 30 students in transcription methods and techniques, conduct transcription projects
-Identify and train 3 language specialists to work with elders in developing and recording audio vocabulary for existing Ojibwemotaadidaa immersion curriculum
-Language fair
-Produce a play script and audio-animated video in Ojibwe based on traditional story
-Publish collection of Ojibwe stories with photographs and an audio CD
-Train 30 students in transcription methods and techniques, conduct transcription projects
-Identify and train 3 language specialists to work with elders in developing and recording audio vocabulary for existing Ojibwemotaadidaa immersion curriculum
-Language fair
-Produce a play script and audio-animated video in Ojibwe based on traditional story
-Publish collection of Ojibwe stories with photographs and an audio CD
An interagency workgroup is developing recommendations for best practices and policies for water reuse in Minnesota. Recommendations will include both regulatory and non-regulatory approaches to successful implementation of water reuse. The workgroup will evaluate current regulations, practices, and barriers, and quantify and determine acceptable health risks associated with water reuse applications. The University of Minnesota is collecting and analyzing field data for use in targeting Minnesota-specific risks.
The AgBMP Loan Program provides needed funding for local implementation of clean water practices at an extremely low cost, is unique in its structure, and is not duplicated by any other source of funding. The AgBMP loan program provides 3% loans through local lenders to farmers, rural landowners, and agriculture supply businesses. Funds are used for proven practices that prevent non-point source water pollution or solve existing water quality problems.
The Aitkin County Soil and Water Conservation District will partner with the Aitkin County Lakes and Rivers Association, Lake Associations, as well as other eligible community partners to reduce the impacts of stormwater runoff and keep water on the land. A mini-grant program to install rain gardens and native vegetation buffers along shorelines of lakes with a completed "Lake Assessment" supported by previous BWSR funding or a TMDL Implementation Plan will be implemented.
To provide access to arts and heritage education to fairgoers. The Aitkin County Agricultural Society enhanced their portable stage by adding additional equipment and a sound system. The fair was able to welcome three artistic performers, including a bluegrass band, a clown, and a caricature artist and purchase interactive items that are used in the new agricultural education center.
The Aitkin County Soil and Water Conservation District will partner with the Minnesota Pollution Control Agency and local volunteers to conduct water quality monitoring in high priority areas of the Upper Mississippi River (Brainerd) Watershed. Four lakes will be sampled, including Sheriff, Rabbit, French, and Section Twelve. Four stream/river sites will be monitored including the Rice River (2 sites), Ripple River, and Sissabagama Creek. Through this effort we will obtain information that will be useful in assessing the health of this watershed.
To hire a qualified consultant to develop a Historic Structure Report that will help preserve the former Albert Pike Masonic Lodge, eligible for listing in the National Register of Historic Places.
The Albert Lea Lake Management project replaced the previous Albert Lea Lake fix-crest dam with a 3-in-1 structure that included a rock riffle dam, a lake level management structure, and an electric fish barrier. The benefits from this project include improved aquatic and waterfowl habitat, invasive species management, and improved desirable fish populations.
To stabilize, repair, and restore log components on the Alex Seitaniemi Housebarn, listed in the National Register of Historic Places, preparatory to implementation of interpretative programming for the public.
To contract with qualified professionals to prepare construction documents for the preservation of the Alexander Faribault House, listed in the National Register of Historic Places.
This project will complete the installation of four nested wells to the Ambient Groundwater Monitoring Network and relocated one well in the City of Saint Paul. Braun Intertec will coordinate site access and oversee the well installation by a state drilling contractor.
Widseth Smith Nolting (WSN) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.
Peer Engineering, Inc. (Peer) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.
To acquire professional services for improving public accessibility to significant archival materials documenting Swedish immigrant contributions to state history
The MNHS permanent collection includes more than 6,500 objects related to American Indian culture and history. MNHS provides responsible stewardship of these items, in accordance with the federal Native American Graves Protection and Repatriation Act and industry standards for collections management. Meaningful partnerships with tribal communities are the key to successful stewardship. In FY16, MNHS continued collections outreach programming by partnering with Dakota tribes and Ojibwe bands throughout the state and beyond.