MuKusick Lake's water quality is declining because of excess nutrients and restoring it is a priority for the Stillwater community.
This project will work to implement priority stormwater treatment projects that were identified in the 2010 McKusick Lake Stormwater Retrofit Assessment. This project will be the first phase of stormwater treatment implementation projects within the McKusick Lake watershed and will provide approximately 10% of the needed phosphorus reduction.
Brown's Creek Watershed District and Washington County will work together to retrofit McKusick Road during a 2017 road improvement project. The project will install seven catch basin retrofits with separation devices, and three 40 foot x 5 foot diameter underground water quality tanks to trap sediment and floatables from the roadway.
Through this project, the function and water quality of County Ditch Number 11 (CD #11) will be improved, contributing toward water quality improvements in Winsted Lake. This will be done by implementing 10 grade stabilization structures, 4 water and sediment control basins, and 1 grassed waterway throughout the drainage systems watershed. By completing this project a sediment will be reduced by 108 tons per year, and total phosphorus will be reduced by 124 pounds per year.
To bring together a diverse assortment of educational opportunities to one location and provide an easily accessed way for all ages and backgrounds to enhance their knowledge of the arts, culture and heritage. The McLeod County Fair connected with community people from multiple communities and backgrounds by hosting presentations and demonstrations by local artists and experts within the areas of the arts, cultural heritage and Minnesota history.
To bring provide new and diverse programming to the McLeod County Fair. Programming will include presentations and demonstrations by local artists and experts on pioneer trunks, Native American legends and beliefs, and the US Dakota conflict of 1862. By holding these demonstrations, the McLeod County Fair hopes to develop precedence and continue to offer demonstrations like these in future years.
McLeod County will create an inspection database for 103E ditches under their drainage authority. The County will acquire a database software solution to conduct field inspections and to track ditch maintenance projects. This software will be used to facilitate statutory compliance including developing a process for completing the annual inspection and reporting requirements. The project will lead to improving the County's data management capabilities and better identification of drainage system needs that could lead to helping improve water courses that are impaired for turbidity.
This project will locally maintain the ongoing efforts established by Minnesota Pollution Control Agency (MPCA) to assess surface water quality at two locations within McLeod County; specifically, South Fork Crow River near Lester Prairie and Buffalo Creek near Glencoe.
Capitol Region Watershed District and the City of St. Paul seek to improve the water quality of stormwater runoff to Como Lake in St. Paul and reuse stormwater to displace potable water use at the McMurray Fields complex within Como Regional Park. The project partners propose the construction of a stormwater reuse and infiltration system that will treat the stormwater volume equivalent of 1.1 inches over the impervious surface of the subwatershed, or 4.9 acre-feet. The drainage area to the proposed system is 130 acres, with 54 acres of impervious surfaces.