McLeod County Drainage Ditch 63 Conservation Implementation

Project Details by Fiscal Year
2021 Fiscal Year Funding Amount
$31,800
Fund Source
Clean Water Fund
Recipient
McLeod SWCD
Recipient Type
Local/Regional Government
Status
Completed
Start Date
March 2021
End Date
May 2023
Activity Type
Grants/Contracts
Counties Affected
McLeod
McLeod
Project Details

Through this project McLeod County Drainage Ditch Number 63's Drainage Authority and McLeod SWCD plan to work jointly to improve the function and water quality of County Ditch Number 63 (CD #63). This system has been made a priority due to the current state of the drainage system and landowner desire for conservation implementation. This will be done by implementing 19 grade stabilization structures throughout the drainage systems watershed. Through completion of this project a Total Suspended Solids (TSS) reduction of 43.89 tons per year, a Soil Savings of 43.89 tons per year, and a total phosphorus reduction of 50.54 pounds per year will be achieved annually to CD #63 and the receiving Eagle Lake, designated in the WRAPS Report as a protected waterbody. Eagle Lake outlets into the Buffalo Creek before draining into the impaired South Fork Crow River.

Competitive Grant Making Body
Board Members and Qualifications
Advisory Group Members and Qualifications
Conflict of Interest Disclosed
no
Conflict of Interest Contact

Annie Felix-Gerth

Legal Citation / Subdivision
Minnesota Session Laws - 2019, 1st Special Session, Chapter 2--S.F.No. 3, Article 2, Section 7(j)
Appropriation Language

(j) $850,000 the first year and $850,000 the second year are for technical assistance and grants for the conservation drainage program in consultation with the Drainage Work Group, coordinated under Minnesota Statutes, section 103B.101, subdivision 13, that includes projects to improve multipurpose water management under Minnesota Statutes, section 103E.015.

2021 Fiscal Year Funding Amount
$31,800
Other Funds Leveraged
$11,028
Direct expenses
$31,800
Administration costs
$2,440
Number of full time equivalents funded
0.090996169
Proposed Measurable Outcome(s)

19 CPS 410 - Grade Stabilization Structures will be implemented, resulting in a Total Suspended Solids (TSS) reduction of 43.89 tons per year, a Soil Savings of 43.89 tons per year, and a total phosphorus reduction of 50.54 pounds per year.

Measurable Outcome(s)

Grant funds funded this project to reduce 43.89 Tons/Yr of Sediment (Tss) and 87.78 Tons/Yr of Soil (Est. Savings) and 50.54 Lbs/Yr of Phosphorus (Est. Reduction).

Proposed Outcomes Achieved
achieved most of the proposed outcomes
Source of Additional Funds

LOCAL LEVERAGED FUNDS

Recipient Board Members
Charles Mathews, Gary Templin, Joel Griebie, John Adamek, Mark Schnobrich
Project Manager
First Name
Ryan
Last Name
Freitag
Organization Name
McLeod SWCD
Street Address
520 Chandler Ave N Glencoe, MN 55336
City
Glencoe
State
MN
Zip Code
55336
Phone
320-864-1214
Email
ryan.freitag@mcleodcountymn.gov
Administered By
Administered by
Location

520 Lafayette Road North
St. Paul, MN 55155

Phone
651- 296-3767