McLeod County Drainage Ditch 11 Conservation Implementation Phase 2

Project Details by Fiscal Year
2022 Fiscal Year Funding Amount
$123,546
Fund Source
Clean Water Fund
Recipient
McLeod SWCD
Recipient Type
Local/Regional Government
Status
Completed
Start Date
March 2022
End Date
April 2024
Activity Type
Grants/Contracts
Counties Affected
McLeod
McLeod
Project Details

Through this project McLeod County Drainage Ditch Number 11's Drainage Authority and McLeod SWCD plan to continue to work jointly to implement the second phase of work within the County Ditch 11 watershed, building off of already completed work funded in FY19. The function and water quality of County Ditch Number 11 (CD #11) has been made a priority due to landowner interest that has been initiated by reduced drainage system function and interactions with residents of the City of Winsted. Second phase efforts will implement 15 grade stabilization structures, 2 water and sediment control basins, and 1 constructed wetland throughout the drainage systems watershed. By completing the proposed project; a Total Suspended Solids (TSS) reduction of 120.2 tons per year, a Soil Savings of 126.99 tons per year, a Total Phosphorus reduction of 131.4 pounds per year, and a Nitrate reduction of 91.12 pounds per year will occur annually, further improving CD #11 and the receiving Winsted Lake which is listed on the federal 303d impaired waters list.

Competitive Grant Making Body
Board Members and Qualifications
Advisory Group Members and Qualifications
Conflict of Interest Disclosed
No
Conflict of Interest Contact

Annie Felix-Gerth

Legal Citation / Subdivision
LAWS of MINNESOTA 2021 First Special Session Ch 1, Article 2, Section 6 (j)
Appropriation Language

(j) $850,000 the first year and $850,000 the second year are for technical assistance and grants for the conservation drainage program, in consultation with the Drainage Work Group, coordinated under Minnesota Statutes, section 103B.101, subdivision 13, and including projects to improve multipurpose water management under Minnesota Statutes, section 103E.015.

2022 Fiscal Year Funding Amount
$123,546
Other Funds Leveraged
$58,800
Direct expenses
$123,546
Administration costs
$681
Proposed Measurable Outcome(s)

1 CPS 656-Wetland Creation, 2 CPS 638-Water and Sediment Control Basins, and 15 CPS 410-Grade Stabilization Structures will be implemented; resulting in TSS, Phosphorus, and Nitrate reductions as well as Soil Savings for CD #11 and Winsted Lake.

Measurable Outcome(s)

1 Constructed Wetland was completed, 3 grade stabilization structures and 5 Water and Sediment Control Basins were also completed in the watershed leading to Winsted Lake. Fewer grade stabilization structures were completed than planned but there were 3 additional Water and Sediment control practices beyond what was originally planned.

Proposed Outcomes Achieved
achieved proposed measurable outcomes
Source of Additional Funds

LOCAL LEVERAGED FUNDS

Recipient Board Members
Charles Mathews, Gary Templin, John Adamek, Mark Schnobrich, Mike Loncorich
Project Manager
First Name
Ryan
Last Name
Freitag
Organization Name
McLeod SWCD
Street Address
520 Chandler Ave N Glencoe, MN 55336
City
Glencoe
State
MN
Zip Code
55336
Phone
320-864-1214
Email
ryan.freitag@mcleodcountymn.gov
Administered By
Administered by
Location

520 Lafayette Road North
St. Paul, MN 55155

Phone
651- 296-3767