to install a 16 panel photovoltaic system located on the northwest side of the Ruby Rupner Auditorium including a data acquisition monitoring system to help educate students and the public
Design and construction of a grade-separated crossing at West River Rd to serve as a safe passage for users of the Rush Creek Regional Trail as well as visitors travelling between the newly redeveloped East and West Units of Mississippi Gateway Regional Park. Underpass will be a box culvert with inside clearances measuring 16' wide x 11' high x 110' long.
Rehabilitation of State Trails Bridges on the Sakatah - Singing Hills State Trail between Waterville and Madison Lake (LeSueur and Blue Earth Counties).
This project entails reconstruction, resurfacing and widening 3.6 miles of the segment of the Sakatah Singing Hills State Trail from Mankato to 589th Avenue.
Continued implementation of the Lower Landing Master Plan with a focus on construction of a pump track. Project may include design, community engagement, engineering, construction administration, excavation, grading, paving, stormwater management, erosion control, site amenities, and landscaping.
Pre-design, design, and engineering for the reconstruction of Segments 1 and 4 of the regional trail. Project may include community engagement, assessing feasibility, and engineering and testing.
Acquire approximately 44 acres along the Sauk River for a regional park to provide nature-based outdoor recreation including nature trails, canoe access, snow shoeing, and cross country skiing.
This project upgraded 20 electric campsites at Scenic State Park to 50 amp service, and electrified 20 new campsites. This is a substantial improvement in providing this important service to RV campers.
Lake Minnewashta Regional Park, build grade separated trail crossing at TH 41 and build 2.6 miles of trail linking a city trail system to the regional park.
to construct phase 4 of the Shingobee Connection, which is a bike/pedestrian bridge across Pumphouse Bay of Leech Lake adjacent to the existing road bridge
This project replaced the waterlines at the Sibley State Park that service the toilet/shower buildings and the drinking water supply in the Oak Ridge camground.
develop Park ID entrance signs at Regional Parks and Trails consisting of Design/Engineering, and phased construction of Park ID signs consisting of demolition, grading, landscaping, utilities, lighting, sidewalk, bituminous paving, curb and gutter, fencing, site equipment, amenities, and signs.
At Lilydale Regional Park, phased implementation of adopted master plan focused on priority site work modifications necessary for future road and picnic shelter: site clearing, earthwork including rubble relocation, cut, fill, grading, technical assistance investigating possible contaminate cleanup and landscape restoration necessary for future middle section (Pickerel Lake Area) road re-alignment and site prep for picnic shelter/restroom facility.
Design & engineering to develop building plans for a addition to the Nature Center, Sugar Shack, Garden House, Shelters, and Maintenance Facility. Develop site plans for gathering nodes, observation, amenities, trails, landscaping, signage, stormwater management; initiate construction for site related improvements such as trails, gathering nodes, nature observation, signage, landscaping, and site amenities. Supplement construction costs for amenities on the Campus Site and Infrastructure project.
to install solar electric PV panels at Dennis Frandsen County Park to provide power for park lighting, well and security equipment and when power is not called for to support park operations it will support grid function
to install two solar thermal flat plate collectors for existing shower facility that will produce shade for the adjacent picnic table and children's playground area
to complete restoration work on the Soo Line Trail in Pine County, including inspection of bridge trestles, surface improvements, culvert replacement, signing, removal of debris, trail widening, and bridge approaches