This project will gather watershed data necessary for the development of a comprehensive watershed management plan with parameter-specific thresholds that will maintain or improve water quality for the Kawishiwi Watershed.
The Kelle's Creek septic system assessment project will examine septic systems throughout the Kelle's Creek watershed to identify those systems that are non-functioning, non-compliant, or an imminent threat to public health and safety. Preliminary prioritization of the septic systems within the watershed will be based on the Washington County GIS database, followed by outreach to landowners to identify willing participants. Ultimately, this project will include inspection of up to 150 septic systems within the Kelle's Creek hydrologic boundary.
In 2010, the Minnesota Pollution Control Agency listed Keller Lake as impaired for excess nutrients. An in-lake alum application was identified as the primary phosphorus load reduction option for controlling internal phosphorus load in Keller Lake. A recently completed in-lake management feasibility study report indicates that the in-lake alum application is the most cost-effective implementation project that remains for Keller Lake.
The City of Apple Valley will conduct a subwatershed assessment on the sections of Apple Valley draining to Keller Lake to target potential projects. The goal is to identify potential cost effective retrofit projects and operations improvements capable of fulfilling needed phosphorus reductions ahead of a number of planned infrastructure projects tentatively scheduled for 2018-2022.
The Keller Lake Water Quality Improvement Project achieves the goals of the City of Burnsville, Black Dog Watershed Management Organization, and the Keller Lake TMDL by:-Achieving the City of Burnsville phosphorus removal requirement outlined in the Keller Lake TMDL by removing 78 lbs/yr-Utilizing remaining available land to construct a high performance, regional stormwater BMP-Providing a high profile water resource/stormwater educational opportunity in the frequently visited Crystal Beach Park-Retaining valuable open space in popular Crystal Beach Park by constructing the BMP undergroundK
The purpose of this work is to develop Total Maximum Daily Loads (TMDLs; a federal clean Water Act requirement) for streams and lakes in the Kettle River and Upper St. Croix watersheds. This and other technical information will be used to develop a separate report called a Watershed Restoration and Protection Strategy (WRAPS) report.
The Kettle River is a major tributary in the St. Croix River Basin. It is a State Wild and Scenic River and designated canoe route. Reducing sediment and nutrient pollution to the Kettle will protect water quality within the watershed and will also benefit the St. Croix River and help to address excess nutrient loading in Lake St. Croix. This project is a partnership between Carlton, Pine, Kanabec, and Aitkin SWCDs, with the Carlton SWCD acting as the project administrator.
This project is to initiate a basic outreach and education plan for the Kettle River Watershed as a first step in a longer-term strategy to engage citizens in watershed problem solving and actions to restore or protect waters. Carlton County has developed the following vision for civic engagement in the Kettle River Watershed: To educate and inspire Kettle River Watershed residents to become more involved and engaged in Water Quality protection and restoration efforts.
Starting in 2016 the Minnesota Pollution Control Agency (MPCA) will be collecting monitoring data on many lakes and streams in the Kettle River and Upper Saint Croix Watersheds. While this information will be useful to assess the overall health of the watershed, it will miss locations in the watershed that can provide critical information to local implementers, local governments, and citizens.
After completing the One Watershed One Plan planning process for the Kettle & Upper St. Croix Watershed, and having the Kettle & Upper St. Croix Comprehensive Watershed Management Plan (KUSC CWMP) approved by BWSR, the local partners of the watershed will use the implementation funds to complete the actions in the plan. These actions will help complete the 10-year goals that are laid out in the plan. This in turn will help protect and restore water and soil resources in the Kettle & Upper St. Croix watersheds.
King Park, a city-owned park in Lakeville, consists of baseball fields, a park building, and a parking lot. A portion of Dodd Blvd, a driveway, and the parking lot drain to a stormwater pond at the north end of the park where water is retained, treated, and reused to irrigate two ball fields. This stormwater reuse project was constructed by the Vermillion River Watershed Joint Powers Organization (VRWJPO) and the City of Lakeville in 2010 to meet VRWJPO and city goals.
This project will provide a means of identifying and prioritizing areas in the Two Rivers Watershed District (TRWD) and the Kittson County Ditch system to implement conservation practices that reduce overland runoff contaminant loadings contributing to water quality impairments. Flow paths, in conjunction with land use and soils information, will be used to analyze the potential for contaminant loading. This information will be available to Kittson County Ditch Authorities, landowners, resource managers and others.
The Knife River is a popular trout fishing river along the North Shore of Lake Superior. In 1998, it was listed as "impaired" by the MPCA for turbidity (being too muddy). In 2010, a Total Maximum Daily Load, or, water clean-up plan was approved. The major recommendations were to address peak flows (fast
The Knife River is a state protected water and a Designated Trout Stream. It is nationally known as a prime fresh-water steelhead fishery and is managed as a cold-water trout fishery for native species including brook trout. The Knife River is characterized by steep gradients, multiple water-falls and cascades, tea-colored water, and remnant old-growth forest cover types including white pine, Norway pine and white cedar.
Project between Minnesota Department of Natural Resources and United States Army Corp of Engineers at Knowlton Creek Watershed to address a large amount of sediment deposited into the St. Louis River Area of Concern (AOC).
The goal of this project is to develop, implement, and evaluate the impacts of co-developed civic engagement outcomes for the Big Fork and Littlefork River Watersheds.
The Big Fork River Watershed Assessment will include the waters of the Big Fork, Sturgeon River, Caldwell Brook, Bear River, and Bowstring River. This Assessment will also include Mirror Lake, Battle Lake, Bass Lake, Larson Lake, Gunn Lake, Coon Sandwick Lake, Busties Lake, Dead Horse Lake, North Star Lake, Burns Lake, Big Ole Lake, Big Island Lake, Bello Lake, Maple Lake, Long Lake, Jessie Lake, Trestle Lake, Clear Lake, Dora Lake, Moose Lake, Shallow Pond Lake, and Island Lake.
The Koochiching County SWCD staff will collect water chemistry and field parameters at specific times to determine amount of contaminant load into each stream. These sites will coincide with locations where stream flow data is also being collected. This project will focus on watershed load monitoring in both the Big Fork and Little Fork River watersheds.
The Lac qui Parle-Yellow Bank Watershed District will contract with the Water Resource Center at the Minnesota State University in Mankato to complete a Geographic Information System (GIS) terrain analysis for the watershed. It will concentrate on the impaired reaches of the Lac qui Parle and Yellow Bank Rivers and tributaries. This inventory will utilize LiDAR elevation datasets to create many GIS datasets by spatially analyzing the elevation data.
Lac qui Parle-Yellow Bank Watershed District will collect water chemistry samples from the three lakes and twenty-nine stream sites in the Lac qui Parle and Minnesota Headwaters watersheds following the MPCA’s Intensive Watershed Monitoring (IWM) plan for lakes and streams. Eleven samples will be collected at each lake from May through September during 2015 and 2016. Eleven samples will be collected at each of the twenty-nine stream sites in 2015. In addition, sixteen samples at each stream site will be collected in 2015 and 2016 following the E.
The primary goal of this project is to partner with stakeholders in the development of a comprehensive Watershed Restoration and Protection Strategies (WRAPS) report to be used on the local level. Achieving this goal will require sound working relationships between local government units (LGUs), watershed citizens, and state and federal government. Gathering input from these groups will be critical when the Minnesota Pollution Control Agency (MPCA) drafts a WRAPS Report that can be utilized by local decision-makers.
The goal of this project is to establish load reduction requirements for impaired waters and to develop restoration strategies to improve water quality for impaired waters and protection strategies to maintain the quality of water for water bodies meeting standards.
Previous research by the St. Croix Watershed Research Station (SCWRS) has identified lake physics (temperature and oxygen) and nutrient recycling (nitrogen and phosphorus) as key drivers of lake algal blooms. SCWRS will conduct monitoring consistent with the prior research efforts by re-deploying three moored buoys to collect data throughout the 2019 ice-free season, including surface water samples. Additionally, SCWRS will deploy an in situ flourometer to measure total algae and cyanobacteria concentrations and will collect and analyze cyanobacterial toxins.
The purpose of this project is for Lake County Soil and Water Conservation District to continue to assist with the Minnesota Pollution Control Agency’s watershed approach and Watershed Restoration and Protection Strategy (WRAPS) process in the Rainy River Headwaters and Cloquet River watersheds. As part of this, Lake County Soil and Water Conservation District will lead efforts to increase levels of civic engagement and community participation in support of the current WRAPS process.
The goal of this project is to reduce peak stormwater flow discharge, sediment and phosphorus from directly entering Lake Pepin by installing two stormwater infiltration basins treating a total of 15.8 acres of developed residential and commercial area in Lake City in conjunction with the Highway 61 road reconstruction project scheduled for 2020 reducing total phosphorus by 13 pounds per year and sediment by 2 tons per year.
A watershed assessment and water quality treatment plan was completed for the impaired Lake George . This project will address the watershed practices portion of the water quality treatment plan. One regional underground stormwater detention/filtration treatment facility treating a 47-acre drainage area will be installed in partnership with the Tech High School Redevelopment Project. The underground facility will target phosphorus reduction reducing an estimated 27 pounds of phosphorus and 7 tons of sediment annually.
This project proposes to address the largest phosphorus loads discharging from 885 acres to Lake St. Croix through the installation of targeted stormwater treatment best management practices ranked in the top 10 of those prioritized in the 2018 Lake St. Croix Direct Discharge South Stormwater Retrofit Analysis. The goal of this project is to reduce pollutant loading from four small communities to Lake St. Croix by at least ten pounds phosphorous.
Contractor will address MPCA comments to the pre-public notice draft Total Maximum Daily Load (TMDL) study for the Lake of the Woods watershed and produce a revised study ready for public notice. RESPEC will also prepare for and participate in two webinar-style public meetings once the study is on public notice.
This project will collect water quality data for four stream sites and six lake sites within the Lake Superior South major
watershed as part of the 10-year cycle for monitoring Minnesota's waters. Due to the large number and geographic extent of
The purpose of this project is to continue supporting the Minnesota Pollution Control Agency in responding to public comments on the Lake Pepin Watershed Phosphorus Total Maximum Daily Load (TMDL) study, which was prepared by LimnoTech under previous work orders.
This project will compile and review previously conducted studies and will prioritize best management practices (BMPs) based on a cost-benefit analysis of their pollutant load reductions and life cycle costs. It will also support the design and construction of BMPs, such as rain gardens and infiltration practices, within the Villa Park subwatershed of the Lake McCarrons watershed.
The goal of this project is to assess and leverage the capacity for the local community to engage in the process of watershed management in the Lake Superior Basin within Lake County and to adopt protection and restoration practices.
Lake Shaokatan and its 13.9 square mile watershed is the headwaters of Yellow Medicine River, which is one of the thirteen major watersheds in the Minnesota River and the largest watershed in Lincoln County. The primary land use is agriculture with the major crops being corn and soybeans. The trend for significant soil loss is due to the nature of the topography with the highest point in the Yellow Medicine Watershed in Lincoln County being 1,960 feet and the lowest being 1,160 feet, a drop of 800 feet in 25 miles.
Lake Bronson is the only major recreational lake in Kittson County. The project is a continuation project from FY2012 and will reduce runoff and decrease movement of sediment, nutrients and bacteria by targeting, prioritizing and installing vegetative practices and installing Side Water Inlets within the Lake Bronson watersheds. Emphasis will be placed on the South Branch of Two Rivers. There is a portion of impaired stream reach as identified by the Minnesota Pollution Control, which directly feeds Lake Bronson.