All Projects

910 Results for
Recipient
Rice Creek WD
2017 Fiscal Year Funding Amount
$280,000
Fund Source

Little Lake Johanna is not meeting state water quality standards due to excessive phosphorus. The Rice Creek Watershed District, in partnership with the City of Roseville, will improve the water quality of stormwater runoff into Little Lake Johanna through installation of an iron-enhanced sand filter. The Oasis Pond Iron-Enhanced Sand Filter Project will annually remove approximately 34 pounds of phosphorus from runoff to Little Lake Johanna annually. This is equal to nearly 20% of the needed load reduction as established by the Southwest Urban Lakes Total Maximum Daily Load Study.

Ramsey
Recipient
Owatonna, City of
2023 Fiscal Year Funding Amount
$3,500,000
Fund Source

Construct wastewater treatment improvements to meet more stingent discharge requirements

Steele
Recipient
Steele County
2012 Fiscal Year Funding Amount
$36,650
Fund Source

The Straight River runs through Owatonna and is considered a priority water resource for the city. Untreated stormwater from city roofs, streets and parking lots are jeopardizing the water quality of river. Through this project, the city will install four rain gardens in city parks that will capture and rapidly absorb stormwater runoff from streets and driveways. The implentation of these rain gardens throughout the city will reduce the volume of stormwater entering the Straight River.

Steele
Recipient
Owatonna, City of
2011 Fiscal Year Funding Amount
$500,000
Fund Source

Construct treatment plant improvements

Steele
Recipient
Shingle Creek WMC
2022 Fiscal Year Funding Amount
$384,000
Fund Source
Hennepin
Recipient
Wood Environment & Infrastructure Solutions Inc
2019 Fiscal Year Funding Amount
$41,883
Fund Source

Wood Environment & Infrastructure Solutions, Inc. (Wood) was selected for this project to conduct work in support of the per- and polyfluoroalkyl substances (PFAS) program. This project is a multi-phased pilot study to further validate and refine potential locations across Minnesota that may have historically been, or are currently, contaminated with PFAS. The primary objective is to evaluate potential PFAS locations, specifically compost sites, to determine presence or absence of PFAS at each site.

Benton
Blue Earth
Dakota
Olmsted
Scott
St. Louis
Stearns
Recipient
City of Apple Valley
2013 Fiscal Year Funding Amount
$158,214
Fund Source

In 2002, Farquar and Long Lakes were placed on the impaired waters list due to high phosphorus levels that caused algal blooms and reduced water clarity. The City of Apple Valley is proposing a combination of two enhancements to achieve a 61 pound reduction in phosphorus.

Dakota
Recipient
Plymouth, City of
2022 Fiscal Year Funding Amount
$150,000
Fund Source
Hennepin
Recipient
Widseth Smith Nolting
2018 Fiscal Year Funding Amount
$2,107
Fund Source

This project will develop a Minnesota Pollution Control Agency (MPCA) ambient groundwater monitoring well and produce a well installation packet.

Pine
Recipient
Pine County Soil and Water Conservation District
2016 Fiscal Year Funding Amount
$40,902
Fund Source

Samples will be taken from lakes and streams from the Kettle River Watershed. The sampling and monitoring of these waters will result in a better understanding of the water quality within the watershed. Having a better understanding of the water quality in the watershed can help when targeting where to put conservation projects on the ground.

Pine
Recipient
Pioneer Sarah Creek Watershed District
2013 Fiscal Year Funding Amount
$103,415
Fund Source

This project will complete a Watershed Restoration and Protection (WRAP) Plan that includes a set of pollutant reduction and watershed management strategies to achieve water quality standards for the listed pollutants, and that are understood and adoptable by local units of government and other stakeholders. This project will also provide an important water quality framework for civic and citizen engagement and communication, which will contribute to long-term public participation in surface water protection and restoration activities throughout the watershed.

Carver
Hennepin
Kandiyohi
McLeod
Meeker
Pope
Renville
Sibley
Stearns
Wright
Recipient
Wenck Associates Inc
2017 Fiscal Year Funding Amount
$8,471
Fund Source

The overall goal is to develop a Watershed Restoration and Protection Strategy (WRAPS) Report and Total Maximum Daily Load (TMDL) Study that will address water quality impairments and maintain or improve water quality throughout the Pioneer Sarah Creek watershed, which is part of the North and South Fork Crow major watersheds. The study will identify sources of pollutants to the streams and lakes, allocate pollution reduction goals, and prioritize and identify implementation strategies to maintain or improve water quality in key lakes and streams in the watershed.

Hennepin
Recipient
Wenck Associates, Inc.
2015 Fiscal Year Funding Amount
$21,434
Fund Source

The overall goal is to develop a Watershed Restoration and Protection Strategy (WRAPS) report and Total Maximum Daily Load (TMDL) study that will address water quality stream impairments and maintain or improve water quality of streams throughout the Pioneer Sarah Creek watershed, which is part of the North and South Fork Crow major watersheds. The study will identify sources of pollutants to the streams and develop restoration and protection strategies for the streams in the Pioneer-Sarah Creek watershed.

Hennepin
Recipient
Pioneer-Sarah Watershed Management Commission
2015 Fiscal Year Funding Amount
$59,720
Fund Source

The overall goal is to develop a Watershed Restoration and Protection Strategies (WRAPS) report and Total Maximum Daily Load (TMDL) study that will address water quality lake impairments and maintain or improve water quality of lakes throughout the Pioneer Sarah Creek watershed, which is part of the North and South Fork Crow major watersheds. The study will identify sources of pollutants to the lakes and develop restoration and protection strategies for the lakes in the Pioneer-Sarah Creek watershed.

Hennepin
Recipient
City of Apple Valley
2010 Fiscal Year Funding Amount
$10,000
Fund Source

PCSI wells, tanks, SSTS

Dakota
Recipient
City of Farmington
2010 Fiscal Year Funding Amount
$10,000
Fund Source

PCSI wells, SSTS and public ed.

Dakota
Recipient
City of Hastings
2010 Fiscal Year Funding Amount
$7,500
Fund Source

Support finding and sealing well 1

Dakota
Recipient
City of Brooklyn Park
2010 Fiscal Year Funding Amount
$10,000
Fund Source

Collect WLs from 44 wells and public ed

Hennepin
Recipient
Vermillion River Watershed Joint Powers Organization -Dakota County
2012 Fiscal Year Funding Amount
$244,000
Fund Source

Water from an area in and near the interchange of US Highway 52 and MN Highway 55 spills onto a steep bluff face at the head of a ravine. This has accelerated the amount of sediment eroding from the ravine into the Mississippi River. In partnership with Dakota County, Dakota Soil and Water Conservation District, the City of Rosemount, Minnesota Department of Transportation, Flint Hills Resources, the Vermillion River Watershed Joint Powers Organization has been working for several years to identify a solution to this severe erosion problem.

Dakota
Recipient
Elm Creek WMC
2023 Fiscal Year Funding Amount
$92,774
Fund Source

Completion of priority assessments to aid in implementing future projects. Three possible assessments have been identified for further consideration. The first is a subwatershed assessment in the South Fork Rush Creek subwatershed in Corcoran, which is adjacent to the previously completed Rush Creek Headwaters SWA. This would identify mainly agricultural BMPs for implementation in partnership with Hennepin County. The second is a feasibility assessment of re-meandering the outlet of Diamond Lake to Diamond Creek, which was identified in the Diamond Creek SWA.

Hennepin
Recipient
Shingle Creek WMC
2023 Fiscal Year Funding Amount
$60,000
Fund Source

Several lakes in the Shingle Creek watershed have been designated Impaired Waters for excess nutrients, and the Watershed Commission and cities continue to undertake BMPs to reduce total phosphorus and sediment to the lakes to help improve water quality. This project is the completion of subwatershed assessments in two priority areas to identify future BMPs addressing ongoing lake nutrient impairments. The areas are the drainage area to the Gaulke/ Memory Lane/ Hagemeister Pond system tributary to Middle Twin Lake; and the drainage area to Eagle Lake.

Hennepin
Recipient
Lac qui Parle-Yellow Bank WD
2019 Fiscal Year Funding Amount
$300,000
Fund Source

Del Clark Lake is a regionally unique resource in the Lac qui Parle Watershed. This grant contains both restoration and protection strategies aiming to maintain the quality of this rare and valuable resource in addition to restoring the recently impaired Canby Creek, which feeds into Del Clark Lake. Three grade control structures will be implemented just upstream of Del Clark to protect against sediment and aid in regulating flows. An estimate 240 pounds of phosphorous and 2,700 tons of sediment will be reduced annually.

Lincoln
Yellow Medicine
Recipient
Goodhue SWCD
2015 Fiscal Year Funding Amount
$317,984
Fund Source

This grant application will focus on the construction of multiple targeted best management practices (BMPs) in priority areas which will provide measurable reductions in sediment and phosphorus loadings to cold water streams in the Mississippi River/Lake Pepin Watershed. The installation of these BMPs will also protect the existing stream habitat by reducing peak flows and reduced streambank erosion.

Goodhue
Wabasha
Recipient
Ramsey Conservation District
2011 Fiscal Year Funding Amount
$128,625
Fund Source

The glacial geology of Ramsey County includes many layers of impermeable and semi-permeable material that can protect aquifers from contaminated waters. Many municipal public supply wells exist to draw water from these aquifers to supply thousands of consumers on a daily basis. Unfortunately, abandoned/unused wells also penetrate the protective layers of glacial material and can "short-circuit" the natural protection our glacial geology can provide allowing unfettered movement of contamination to even deeper aquifers below the ground.

Ramsey
Recipient
Ramsey Conservation District
2013 Fiscal Year Funding Amount
$150,000
Fund Source

Ramsey County has over 3,500 acres tied to faith based organizations and schools. On average, these properties contribute one billion gallons of stormwater runoff, 3,000 pounds of phosphorus, and 1,000 tons of sediment to local water bodies. The Ramsey Conservation District (RCD) in partnership with local property owners and watershed districts/water management organizations will install 6-12 stormwater projects that will help protect and improve water quality of surrounding lakes.

Ramsey
Recipient
Ramsey Conservation District
2014 Fiscal Year Funding Amount
$150,000
Fund Source

Ramsey County has 3,500+ acres tied to 358 faith organizations and 304 schools. On average, these properties contribute 1 billion gallons of stormwater runoff, 3,000 lbs of phosphorus, and 1,000 tons of sediment to our local water bodies. The Ramsey Conservation District (RCD), working with community partners and Watershed Districts/Water Management Organizations, will install 6-12 stormwater best management projects that will help protect and improve water quality of surrounding lakes.

Ramsey
Recipient
Ramsey Conservation District
2015 Fiscal Year Funding Amount
$150,000
Fund Source

The purpose of this program is to provide cost share funding to community groups for the installation of community accessible rain gardens and other water quality projects in Ramsey County. The Ramsey Conservation District (RCD) in partnership with local property owners and Watershed Districts/Water Management Organizations will install 6-12 stormwater best management projects that will help protect and improve water quality of surrounding lakes, streams, rivers, and wetlands.

Ramsey
Recipient
Ramsey Conservation District
2017 Fiscal Year Funding Amount
$108,000
Fund Source

Ramsey County, the most densely populated county in Minnesota, generates high levels of contaminated runoff from its impervious surfaces, which can have damaging effects on both surface water and groundwater. Concerns arise when these contaminants drain into abandoned and unused wells, threatening the quality of groundwater, especially in drinking water supply areas, wellhead protection areas, or groundwater recharge zones.

Ramsey
Recipient
Ramsey-Washington Metro Watershed District
2015 Fiscal Year Funding Amount
$47,668
Fund Source

The goal of the project is to create a complete Watershed Restoration and Protection Strategy (WRAPS) report for the Ramsey-Washington Metro Watershed District for inclusion into an updated Watershed Management Plan, including completion of a watershed-wide Total Maximum Daily Load (TMDL) report sufficient for EPA approval.

Ramsey
Washington
Recipient
Ramsey-Washington Metro Watershed District
2011 Fiscal Year Funding Amount
$121,000
2012 Fiscal Year Funding Amount
$224,860
Fund Source

This project will provide the Minnesota Pollution Control Agency and Ramsey-Washington Metro Watershed District the information and tools necessary to improve water quality in Battle Creek Lake, Beaver Lake, Carver Lake, Keller Lake and Wakefield Lake through targeted phosphorus reduction activities in the watershed.

Ramsey
Recipient
City of Chanhassen
2013 Fiscal Year Funding Amount
$155,474
Fund Source

The Bluff Creek Watershed TMDL Implementation Plan evaluated the stream power index for each of the gullies identified in the 1996 Management Plan. Based upon this terrain analysis, sediment loading rates from the 1999 to 2008 P8 modeling results, and modeled surface runoff, known erosion sites were prioritized. This site, which is tributary to Bluff Creek and the Minnesota River, was given the highest priority ranking.

Hennepin
Recipient
Cedar River Watershed District
2012 Fiscal Year Funding Amount
$133,250
Fund Source

Water quality and flood damage reduction goals can't be accomplished without reducing flows and taking a targeted approach to the upper most reaches of the most critical waterways. Water and sediment control basins are eartern structures that retain water and have been identified as one of the best tool for measured success in reducing peak flows. For this project, basins will be targeted and implemented in the Upper Cedar River Watershed, specifically in the Dobbins Creek Watershed.

Dodge
Mower
Recipient
Capitol Region WD
2014 Fiscal Year Funding Amount
$360,000
Fund Source

Capitol Region Watershed District (CRWD), in partnership with the City of Roseville, will construct a volume reduction/capture-reuse irrigation facility below the Upper Villa Park Softball field in the City of Roseville. This project will protect Lake McCarrons and the Villa Park Wetland System (VPWS) by reducing runoff volumes and the pollutants associated with urban stormwater such as Total Phosphorus (TP), Total Suspended Solids (TSS), heavy metals, and petroleum products among others.

Ramsey
Recipient
Metropolitan Council/University of Minnesota
2016 Fiscal Year Funding Amount
$30,648
2017 Fiscal Year Funding Amount
$61,296
2018 Fiscal Year Funding Amount
$55,608
2019 Fiscal Year Funding Amount
$99,840
Fund Source

The Metropolitan Council, in conjunction with the University of Minnesota, is evaluating outdoor water use in the Twin Cities metro region - a subject which has come under the spotlight recently due to concerns related to water quality and quantity issues. In the Twin Cities, 20% of all treated drinking water is used outdoors, with a majority of this being used on lawns and landscapes. The goal of this proposal is to reduce water use in the home landscape by conducting assessments, research, and demonstration around the smart use of irrigation.

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington
Recipient
Redwood Cottonwood Rivers Control Area
2015 Fiscal Year Funding Amount
$150,512
Fund Source

The goal of this project is to continue best management implementation according to the Redwood River Phase II Implementation Plan (1999) and install phosphorus and total suspended solids (TSS) reducing conservation practices that will help achieve the Lower Minnesota River dissolved oxygen Total Maximum Daily Load (TMDL), and the Minnesota River Turbidity TMDL. The proposed implementation of conservation practices include: water and sediment control basins, grassed waterways, grade stabilizations and streambank stabilizations.

Lincoln
Lyon
Murray
Redwood
Recipient
Redwood-Cottonwood Rivers Control Area
2017 Fiscal Year Funding Amount
$76,111
Fund Source

In 2017 and 2018, Redwood-Cottonwood Rivers Control Area (RCRCA) will collect water chemistry samples from the 10 lakes and 24 stream sites identified in the Redwood and Cottonwood River watersheds. Six samples will be collected at 10 lakes from May through September in 2017; five samples will be collected at 5 lakes in 2018 from May through September. Eleven samples will be collected at each of the 24 stream sites following the Basic Regime in 2017. Sixteen samples at each stream site will be collected in 2017 and 2018 following the E.coli monitoring regime.

Brown
Cottonwood
Lincoln
Lyon
Murray
Pipestone
Redwood
Yellow Medicine
Recipient
Redwood-Cottonwood Rivers Control Area (RCRCA)
2013 Fiscal Year Funding Amount
$52,600
Fund Source

The Redwood and Cottonwood River Watersheds have been assessed and many reaches have been impaired for turbidity, bacteria, and low dissolved oxygen. This project will accelerate conservation efforts to reduce overland runoff sediment, bacteria, and nutrient loadings contributing to water quality impairments in targeted subwatersheds.

Brown
Cottonwood
Lincoln
Lyon
Murray
Pipestone
Redwood
Yellow Medicine
Recipient
Redwood-Cottonwood Rivers Control Area (RCRCA)
2013 Fiscal Year Funding Amount
$560,000
Fund Source

The Redwood River and Cottonwood River watersheds encompass approximately 2,020 square miles of southwestern Minnesota in the Minnesota River Basin. Land use in these watersheds is mostly agricultural and area geology makes them prone to erosion. Surface water issues within the two watersheds are a concern of local leaders. The counties and Soil and Water Conservation District leaders formed the Redwood Cottonwood Rivers Control Area (RCRCA) Joint Powers Board in 1983 to address sedimentation, water quality and quantity, and erosion issues.

Brown
Cottonwood
Lincoln
Lyon
Murray
Pipestone
Redwood
Yellow Medicine
Recipient
Metropolitan Council/HDR
2014 Fiscal Year Funding Amount
$23,304
2015 Fiscal Year Funding Amount
$403,182
2016 Fiscal Year Funding Amount
$95,060
Fund Source

The Metropolitan Council, in conjunction with HDR Engineering, Inc. consultants, will evaluate a variety of approaches to develop sustainable water supplies across the metro area. Subregional study areas are being selected where multiple communities face potential problems with the long-term sustainability of current water supplies, and where community stakeholders have expressed interest in learning more about sustainable water supply options.

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington
Recipient
Metropolitan Council/Barr Engineering Company
2015 Fiscal Year Funding Amount
$47,487
2016 Fiscal Year Funding Amount
$1,905
Fund Source

As the Metropolitan Council updated the Twin Cities Metropolitan Area Master Water Supply Plan, stakeholders asked the Council to consider the sustainable limits of the region’s water sources. The Council’s most important analytical tool is a regional groundwater flow model (Metro Model 3), which can be used to quantify the long-term regional impacts caused by hundreds of independent groundwater appropriations.

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington