All Projects

801 Results for
Recipient
Ramsey-Washington Metro WD
2014 Fiscal Year Funding Amount
$54,083
Fund Source

The Ramsey-Washington Metro Watershed District (District) has determined that large impervious sites (like churches, commercial sites, and schools) are more economical for stormwater management retrofit projects than distributed small projects along roadways. Analysis of the watershed land use indicates that large impervious sites are typically commercial properties (primarily retail), churches, and schools. The District began assessing church sites for retrofit opportunities in 2013 and will continue this effort in 2014.

Ramsey
Washington
Recipient
Scott Soil and Water Conservation District
2014 Fiscal Year Funding Amount
$78,338
Fund Source

This project will provide lake and stream monitoring assistance to the Minnesota Pollution Control Agency (MPCA), identifying impaired waters within the Lower Minnesota RIver Watershed (Watershed ID: 07020012) according to the Intensive Watershed Monitoring (IWM) Approach.

Carver
Dakota
Hennepin
Scott
Recipient
Multiple public water systems
2013 Fiscal Year Funding Amount
$250,000
2015 Fiscal Year Funding Amount
$250,000
2016 Fiscal Year Funding Amount
$113,000
2018 Fiscal Year Funding Amount
$250,000
Fund Source

Approximately 70 percent of all Minnesotans rely on groundwater as their primary source of drinking water. Wells used for drinking water must be properly sealed when removed from service to protect both public health and Minnesota’s invaluable groundwater resources. The Minnesota Department of Health protects both public health and groundwater by assuring the proper sealing of unused wells.
Clean Water funds are being provided to well owners as a 50% cost-share assistance for sealing unused public water-supply wells.

Anoka
Beltrami
Benton
Big Stone
Blue Earth
Cook
Crow Wing
Dakota
Dodge
Faribault
Fillmore
Hennepin
Lyon
McLeod
Morrison
Mower
Olmsted
Rice
Sherburne
Sibley
St. Louis
Stearns
Steele
Swift
Todd
Waseca
Washington
Watonwan
Winona
Wright
Recipient
Multiple Local Government Units
2012 Fiscal Year Funding Amount
$250,000
2014 Fiscal Year Funding Amount
$290,000
2017 Fiscal Year Funding Amount
$112,000
2019 Fiscal Year Funding Amount
$250,000
Fund Source

Approximately 70 percent of all Minnesotans rely on groundwater as their primary source of drinking water. Wells used for drinking water must be properly sealed when removed from service to protect both public health and Minnesota’s invaluable groundwater resources. The Minnesota Department of Health with the assistance of the Board of Water and Soil Resources protects both public health and groundwater by assuring the proper sealing of unused wells.” Clean Water funds are being provided to home owners as a 50% cost-share assistance for sealing unused private drinking water wells.

Benton
Big Stone
Carver
Crow Wing
Douglas
Hennepin
Mahnomen
Martin
Mille Lacs
Norman
Otter Tail
Ramsey
Rice
Sherburne
Wright
Recipient
LimnoTech
2014 Fiscal Year Funding Amount
$29,932
Fund Source
The goal of this project is the continued development of an overall strategy for reduction of turbidity/TSS, with sets of sediment reduction initiatives and actions for various sources, to address the Minnesota River Turbidity TMDL and the South Metro Mississippi River TSS TMDL. The overall strategy will be used to help establish a path towards achieving the required reductions of turbidity/TSS.
Aitkin
Anoka
Becker
Beltrami
Benton
Big Stone
Blue Earth
Brown
Carlton
Cass
Chippewa
Chisago
Clearwater
Cottonwood
Crow Wing
Dakota
Douglas
Faribault
Freeborn
Goodhue
Grant
Hennepin
Hubbard
Isanti
Itasca
Recipient
Minnesota Department of Natural Resources
2013 Fiscal Year Funding Amount
$3,903
2014 Fiscal Year Funding Amount
$4,846
Fund Source

The goal of this project is to provide drilling services for the Sentinel Lakes Groundwater/Surface Water Interaction Network. The three new wells will be used for monitoring the interaction between groundwater and surface water in Lakes Shaokatan and Bear Head. Groundwater/lake water interactions are not well understood, and in order to produce accurate and useful Total Maximum Daily Load watershed investigations and impairment remediations, the MPCA must understand how groundwater affects lake water quality.

Lincoln
St. Louis
Recipient
Dayton, City of
2019 Fiscal Year Funding Amount
$74,750
Fund Source

The Septic Risk Assessment Model and Program Enhancement (SRAMPE) will result in a systematically review and catalog of all septic related materials by licensed SSTS professionals pertaining to the 890 properties in which we believe are served by SSTS. The enhanced program will improve efficiency, customer service, and administrative procedure. Above all, it will lead to upgrading of failing SSTS or conversion to City sewer

Hennepin
Recipient
Richfield, City of
2023 Fiscal Year Funding Amount
$20,000
Fund Source

Pond maintenance in the forms of sediment dredging and storm sewer improvements for enhancing water quality within the local watershed.

Hennepin
Recipient
Shingle Creek Watershed Management Organization
2010 Fiscal Year Funding Amount
$105,237
Fund Source

Shingle Creek in suburban Hennepin County has experienced significant changes since its days as a narrow, meandering prairie stream. Nearly 100 years ago much of the stream was straightened and dredged to provide better drainage for agriculture. As agriculture gave way to urban and suburban development, Shingle Creek was widened and dredged again to more efficiently convey stormwater to the Mississippi River. Urbanization has resulted in high levels of chloride in the stream from road salt and not enough dissolved oxygen to sustain aquatic life.

Hennepin
Recipient
Shingle Creek WMC
2021 Fiscal Year Funding Amount
$328,000
Fund Source
Hennepin
Recipient
Valley Branch WD
2016 Fiscal Year Funding Amount
$199,000
Fund Source

This project will reduce phosphorus loading from the watershed tributary to Silver Lake. The project includes a combination of structural water quality improvements in the SLV-10 subwatershed north of the lake, retrofits (including iron enhanced sand filtration) to the Silver Lake bioretention basin, small scale best management practices (BMPs) throughout the watershed, and educational signage in Joy Park. The elements of this project will reduce phosphorus loading to Silver Lake by a combined 15 pounds per year or 40% of the current watershed load.

Ramsey
Recipient
Greater Blue Earth River Basin Alliance (GBERBA)
2010 Fiscal Year Funding Amount
$243,250
Fund Source

The Greater Blue Earth River Basin is a large area within the Watonwan, Le Sueur, and Blue Earth River watersheds. Recent research by University of Minnesota, the National Center for Earth Dynamics, and others has found this basin to be the largest contributor of sediment to Lake Pepin.

Blue Earth
Cottonwood
Faribault
Freeborn
Jackson
Le Sueur
Martin
Waseca
Watonwan
2021 Fiscal Year Funding Amount
$5,619
Fund Source

This contract is a component of larger project (Snake River E.coli Microbial Source Tracking Study – Cycle II) in the Snake River Watershed located in the St. Croix river basin. The study will address microbial water quality impairments in the watershed. This study will conduct fecal bacteria source tracking using genetic markers across impaired streams in the watershed during the spring and summer months of 2021.

Aitkin
Chisago
Isanti
Kanabec
Mille Lacs
Pine
Recipient
Snake River Watershed Plan Partnership
2024 Fiscal Year Funding Amount
$1,024,471
Fund Source
Aitkin
Kanabec
Mille Lacs
Pine
Recipient
Wenck Associates, Inc.
2013 Fiscal Year Funding Amount
$146,992
Fund Source

This project will complete a Total Maximum Daily Load (TMDL) study for the impaired reaches of the Snake River Basin. The project includes development of a Generalized Watershed Loading Function (GWLF) model for nutrient sources and Total Suspended Sediment (TSS), a spreadsheet version of a BATHTUB model of lake response for four lakes, and a bacteria source assessment. Wenck will also provide all stream channel data as a spreadsheet and locational database.

Aitkin
Kanabec
Mille Lacs
Pine
Recipient
Snake River Watershed Management Board
2015 Fiscal Year Funding Amount
$312,025
Fund Source

This project primarily focuses on riparian restoration (permanent vegetative buffer enhancements and plantings) on 6.5 miles (both sides) of targeted tributaries, ditches, and wetlands within five sub - watershed areas identified in the Snake River Watershed Restoration and Protection Strategy (WRAPS) Report. These plantings will consist of native perennials, trees, and shrubs where practical. In addition to the riparian plantings, this project will include fence exclusions for cattle and heavy use protections at cattle crossings in streams and ditches.

Pine
Recipient
Wenck Associates, Inc.
2012 Fiscal Year Funding Amount
$133,904
Fund Source

This phase of the project will complete a TMDL for the impaired reaches of the Snake River Basin. The project includes development of a Unit Area Load model for nutrient sources, a spreadsheet version of a BATHTUB lake response for four lakes, and a bacteria source assessment. Contractor will also provide all stream channel data as a spreadsheet database and in GIS.

Aitkin
Kanabec
Mille Lacs
Pine
Recipient
Area 7 - Southeast SWCD Technical Support
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The purpose of this project is to provide a new shared position in southeast Minnesota which will accelerate the adoption of soil health practices by leveraging the existing efforts of the National Resources Conservation Service and other organizations.

Dodge
Fillmore
Freeborn
Goodhue
Houston
Mower
Olmsted
Rice
Steele
Wabasha
Winona
Recipient
City of Hopkins
2018 Fiscal Year Funding Amount
$6,800
Fund Source

Educate well owners and storage tank owners within the DWSMA

Hennepin
Recipient
City of St. Louis Park
2019 Fiscal Year Funding Amount
$9,538
Fund Source

Repair and seal up to 5 private wells in the DWSMA

Hennepin
Recipient
City of Edina
2019 Fiscal Year Funding Amount
$3,077
Fund Source

Promote local reimbursement program for private well sealing. Advertise fund availability with educational messages

Hennepin
Recipient
City of Eden Prairie
2017 Fiscal Year Funding Amount
$9,859
Fund Source

Expand the existing observation well monitoring network.

Hennepin
Recipient
City of Minnetonka
2017 Fiscal Year Funding Amount
$9,840
Fund Source

Expand Minnetonka's groundwater level monitoring network

Hennepin
Recipient
City of Winnebago
2017 Fiscal Year Funding Amount
$1,980
Fund Source

Pull and seal an abandon well.

Faribault
Recipient
City of Mound
2017 Fiscal Year Funding Amount
$1,300
Fund Source

Televise well #8, document condition of casing & screen and prepare a repair report for any deficiencies.

Hennepin
Recipient
Lincoln Pipestone Rural Water
2017 Fiscal Year Funding Amount
$1,385
Fund Source

Purchase water level monitors. Provide incentives for BMP's.

Lincoln
Recipient
City of North St. Paul
2017 Fiscal Year Funding Amount
$10,000
Fund Source

Use a GIS storyboard to inform public of potential contaminates to the DWSMA. Update PCSI database.

Ramsey
Recipient
City of St. Anthony Village
2017 Fiscal Year Funding Amount
$10,000
Fund Source

Seal municipal well

Hennepin
Recipient
City of Edina
2017 Fiscal Year Funding Amount
$9,859
Fund Source

Expand the existing groundwater level monitoring network.

Hennepin
Recipient
Denham Bar
2017 Fiscal Year Funding Amount
$500
Fund Source

Extend casing & wire, add conduit & well cap

Pine
Recipient
Church of Victory
2017 Fiscal Year Funding Amount
$1,046
Fund Source

Investigate well and replace pitless unit and make other repairs to the well

Pine
Recipient
City of Askov
2018 Fiscal Year Funding Amount
$10,000
Fund Source

Develop, host and maintain city website to educate residents on safety of city wells

Pine
Recipient
City of Minneapolis; Minneapolis Water Works
2018 Fiscal Year Funding Amount
$10,000
Fund Source

Train and certify 4 Master Water Stewards in Stormwater best management practices to improve water quality.

Hennepin
Recipient
City of Minnetrista
2018 Fiscal Year Funding Amount
$6,236
Fund Source

Compile water quality information to update website and to print and mail information to property owners in the DWSMA.

Hennepin
Recipient
City of Ellendale
2018 Fiscal Year Funding Amount
$5,950
Fund Source

Evaluate well construction and condition; preparation and seal old municipal well 2, unique number 226891

Steele
Recipient
City of Pine City
2020 Fiscal Year Funding Amount
$10,000
Fund Source

Seal an old city of Pine City municipal well.

Pine
Recipient
Cross Lake Housing Development/d.b.a. Steven R Ovick
2020 Fiscal Year Funding Amount
$9,249
Fund Source

Purchase electrical switch gear and generator for well site.

Pine
Recipient
City of Brook Park
2020 Fiscal Year Funding Amount
$4,971
Fund Source

Purchase of spill kits for the Fire Dept. first response vehicles.

Pine
Recipient
Reads Landing Brewing Company (d.b.a. K&K Brewing, Inc.)
2020 Fiscal Year Funding Amount
$4,804
Fund Source

Construct well. Seal well.

Wabasha
Recipient
City of Richfield
2020 Fiscal Year Funding Amount
$1,837
Fund Source

Prepare and mail information to owners of chemical storage and hazardous waste generator properties. Educate owners of properties and the general public about the city's Wellhead and SWP.

Hennepin