Sheridan Pond Maintenance Project

Project Details by Fiscal Year
2023 Fiscal Year Funding Amount
$20,000
Fund Source
Clean Water Fund
Recipient
Richfield, City of
Recipient Type
Local/Regional Government
Status
In Progress
Start Date
October 2022
End Date
December 2025
Activity Type
Grants/Contracts
Counties Affected
Hennepin
Hennepin
Project Overview

Pond maintenance in the forms of sediment dredging and storm sewer improvements for enhancing water quality within the local watershed.

Competitive Grant Making Body
Board Members and Qualifications

http://www.bwsr.state.mn.us/board

Advisory Group Members and Qualifications

http://www.bwsr.state.mn.us/board

Conflict of Interest Contact

Annie Felix-Gerth

Legal Citation / Subdivision
The Laws of Minnesota 2019, 1st Special Session, Chapter 2, Article 2, Section 7(a), and the Laws of Minnesota, 2021, 1st Special Session, Chapter 1, Article 2, Sec. 6(a)
Appropriation Language

2019: (a) $13,591,000 the first year and $13,375,000 the second year are for performance-based grants with multiyear implementation plans to local government units. The grants may be used to implement projects that protect, enhance, and restore surface water quality in lakes, rivers, and streams; protect groundwater from degradation; and protect drinking water sources. Projects must be identified in a comprehensive watershed plan developed under the One Watershed, One Plan or metropolitan surface water management frameworks or groundwater plans. Grant recipients must identify a nonstate match and may use other legacy funds to supplement projects funded under this paragraph. 2021: (a) $21,197,000 the first year and $22,367,000 the second year are for performance-based grants with multiyear implementation plans to local government units. The grants may be used to implement projects that protect, enhance, and restore surface water quality in lakes, rivers, and streams; protect groundwater from degradation; and protect drinking water sources. Projects must be identified in a comprehensive watershed plan developed under the One Watershed, One Plan and seven-county metropolitan groundwater or surface water management frameworks as provided for in Minnesota Statutes, chapters 103B, 103C, 103D, and 114D. Grant recipients must identify a nonstate match and may use other legacy funds to supplement projects funded under this paragraph. This appropriation may be used for:
(1) implementation grants to watershed planning areas with approved plans, including but not limited to Buffalo-Red River, Cannon River, Cedar River, Clearwater River, Des Moines River, Hawk Creek, Lac qui Parle Yellow Bank, Lake of the Woods, Lake Superior North, Le Seuer River, Leech Lake River, Long Prairie River, Lower Minnesota River North, Lower Minnesota River West, Lower Minnesota River South, Lower St. Croix River, Marsh and Wild Rice, Middle Snake Tamarack Rivers, Mississippi East, Mississippi River Headwaters, Mississippi West, Missouri River Basin, Mustinka/Bois de Sioux, Nemadji River, North Fork Crow River, Otter Tail, Pine River, Pomme de Terre River, Red Lake River, Redeye River, Root River, Rum River, Sauk River, Shell Rock River/Winnebago Watershed, Snake River, South Fork Crow River, St. Louis River, Thief River, Two Rivers Plus, Vermillion, Watonwan River, Winona La Crescent, Yellow Medicine River, and Zumbro River; (2) seven-county metropolitan groundwater or surface water management frameworks; and (3) other comprehensive watershed management plan planning areas that have a board-approved and local-government-adopted plan as authorized in Minnesota Statutes, section 103B.801.
The board may determine whether a planning area is not ready to proceed, does not have the nonstate match committed, or has not expended all money granted to it. Upon making the determination, the board may allocate a grant's proposed or unexpended allocation to another planning area to implement priority projects, programs, or practices.

2023 Fiscal Year Funding Amount
$20,000
Direct expenses
$0
Administration costs
$0
Number of full time equivalents funded
0.35
Proposed Measurable Outcome(s)

Modeling estimates that 321 lb/yr of TSS and 1.1 lb/yr of TP will be removed by the proposed sewer improvements. This is in addition to an estimated 1919 lbs of TSS and 7.1 lbs of TP of removal that will result from the sediment dredging effort.

Source of Additional Funds

LOCAL LEVERAGED FUNDS

Project Manager
First Name
Chad
Last Name
Donnelly
Organization Name
Richfield, City of
Street Address
6700 Portland Ave
City
Richfield
State
MN
Zip Code
554232560
Phone
612-861-9795
Email
cdonnelly@richfieldmn.gov
Administered By
Administered by
Location

520 Lafayette Road North
St. Paul, MN 55155

Phone
651- 296-3767