This project will develop the Pomme de Terre Watershed Total Maximum Daily Load (TMDL) study for the second round of the 10-year watershed approach cycle in the Pomme de Terre watershed. This phase of the project will address 4 stream impairments and 3 lake impairments and produce a draft TMDL document. A second phase may be needed as the stressor ID report identifies more stream reaches with TMDL relevant stressors.
The goal is to facilitate strategic networking, learning, and participation of targeted groups to assess, build, and leverage community capacity (i.e. community resources and values) to become aware of water quality issues and increase best management practice adoption to restore and protect water quality in the Pomme de Terre River watershed. This goal will benefit the completion of the second cycle of the watershed approach by providing useful information important in the completion of Watershed Restoration and Protection Strategies (WRAPS) report.
The Pomme de Terre River watershed is located in west central Minnesota and occupies a portion of six counties. For many years surface water quality within the watershed has been a concern to local government. In 1982 the Pomme de Terre River Association Joint Powers Board (JPB) was formed to begin addressing this issue. In 2002 the Pomme de Terre River was placed on the Impaired Waters list for turbidity. The goal of the JPB is to improve the local water resources within the watershed through voluntary efforts and building relationships with local landowners.
The Pomme de Terre River watershed is located in west central Minnesota and occupies a portion of six counties. For many years surface water quality within the watershed has been a concern to local government. In 1982 the Pomme de Terre River Association Joint Powers Board was formed to begin addressing this issue. In 2002 the Pomme de Terre River was placed on the Impaired Waters list for turbidity. This project is a continuation of a 2011 Clean Water Fund project.
PDTRA will use this funding to pursue goals stated in the CWMP. PDTRA has ID'd 5 priority areas to focus sediment & phosphorus reduction goals: Northern Lakes, Christina/Pelican Lakes, PDT River Lakes Chain, PDT River Corridor, & Drywood Creek. Plans include but aren't limited to: water & sediment control basins, alternative tile intakes, waste pit closures, grade stabilizations, livestock exclusions, shoreline restorations/stabilizations, cover crops.
The Pomme de Terre River watershed is located in west central Minnesota and occupies a portion of six counties. For many years surface water quality within the watershed has been a concern to local government, and in 1982 the Counties and SWCDs within the watershed area formed the Pomme de Terre River Association Joint Powers Board to begin addressing this issue. In 2002 the Pomme de Terre River was placed on the Impaired Waters list for turbidity.The project partners are collaborating to improve surface water quality within the watershed with a grant from the Clean Water Fund.
The goal of the Pomme de Terre River Association (JPB) is to improve local water resources within the watershed through targeted voluntary efforts and build strong relationships with local landowners, producers, and citizens. Utilizing the State's first Watershed Restoration and Protection Strategy, the JPB has targeted and identified specific areas and activities required for marked water quality improvement.
The Pomme de Terre River Association will partner with the Minnesota Pollution Control Agency to conduct water quality monitoring in the Pomme de Terre River Watershed. The purpose will be to determine if waters meet the states non-point source pollution standards. The data collected will be utilized to produce the cycle two Watershed Restoration and Protection Strategy (WRAPS) report and supporting documents for the watershed. Through the utilization of this funding a total of 11 lakes and 7 stream reaches will be assessed.
This project will establish a framework with the Pomme de Terre River Association (PDTRA), county staff, Soil and Water Conservation District staff, and state agencies that will outline their involvement throughout the development of the Watershed Restoration and Protection Strategy (WRAPS) for the Pomme de Terre River watershed. This work will form the basis to establish restoration and protection strategies that local governments and watershed organizations can use to make decisions that will lead to protecting and restoring the waters in the watershed.
The goal of this project is to extend through 2016, calibrate, and validate the existing watershed model using Hydrological Simulation Program FORTRAN (HSPF) for the Pomme de Terre River Watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) studies.
Certain stretches of the Pomme de Terre River have been identified as impaired. This project will quantify the reductions in pollutant loading that would be necessary to bring water quality in the impaired stretches to an acceptable level. It will also identify strategies that would improve water quality in these impaired stretches. Some funds will support public input activities into the Pomme de Terre River watershed management plan.
The goal of the Pomme de Terre River Association (PDTRA JPB) is to improve the local water resources within the watershed through targeted voluntary efforts and the building of strong relationships with local landowners, producers, and citizens. To further our efforts in strategically working to achieve our reduction goals, listed in our Major Watershed Restoration and Protection Strategies Report and Turbidity Total Maximum Daily Load report, we would like to further define our Priority Management Zones through the development of a hydrological conditioned Digital Elevation Model.
The Pomme de Terre River Association (PDTRA) will use this funding to pursue goals stated in the Comprehensive Watershed Management Plan. PDTRA has identified five priority areas to focus sediment & phosphorus reduction goals: Northern Lakes, Christina/Pelican Lakes, Pomme de Terre River Lakes Chain, Pomme de Terre River Corridor, and Drywood Creek. Plans include but aren't limited to: water & sediment control basins, alternative tile intakes, shoreline restorations/stabilizations, critical area plantings, grass waterways and SSTS upgrades.
This project is coordination and oversight of the contract to conduct tree clearing at the Ponds behind Erie Pier site in the St. Louis River Area of Concern.
The Pope Soil and Water Conservation District Chippewa River Watershed Surface Water Assessment Grant (SWAG) monitoring program will provide knowledge of water quality to local partners and the Minnesota Pollution Control Agency. Five sites, comprised of two lakes and three along two streams, will be monitored over the course of two years. There are 5 townships throughout the Chippewa watershed that each house a monitoring site: Nora, New Prairie , White Bear Lake, Barsness, and Gilchrist.
This project will work to install 30 water and sediment control basins (WaSCOBs) in three subwatersheds adjacent to Lake Minnewaska to reduce the amount of total phosphorus (TP) entering Pelican Lake, Lake Minnewaska, and Lake Emily. Pelican Lake and Lake Emily have been identified in an 8 lake Total Maximum Daily Load (TMDL) study conducted in Pope County as being impaired for excess nutrients.
This project will develop feasibility analysis, a drawdown plan for Malmedal Lake and an analysis of available options for fish barriers in the watersheds of Malmedal Lake and Strandness Lake.
Pope County Ditch 6 (CD 6) is an 18 mile channelized watershed and a primary tributary to Ashley Creek. CD6 and Ashley Creek are impaired for bacteria, dissolved oxygen and aquatic organisms. This project will address the storm water runoff concerns identified within this public drainage system in conjunction with repairs scheduled for 2017-2018. Alternative intake structures to manage nutrients and other practices, such as water and sediment control basins, will be installed to retain water on the upland properties and minimize flow rate and velocity.
The project’s first phase includes development and implementation of a sampling plan to investigate stormwater quality within impervious areas; soil borings to determine the soil type; a topographical survey to determine drainage patterns and infrastructure locations; and data gathering of existing infrastructure. A season-long stormwater quality monitoring program will monitor stormwater within the drainage areas that flow directly to the storm sewer, including monitoring of roof runoff and overland flow to determine potential pollutant sources and mitigation options.
Water quality in Powers Lake is declining. Water monitoring professionals from the Washington Conservation District (WCD), funded by the South Washington Watershed District (SWWD), have determined that average annual phosphorus concentrations are increasing in the lake. Higher phosphorus concentrations lead to more frequent algae blooms and reduced water clarity.Powers Lake is at risk mainly due to increased urbanization within its watershed (the land area that drains to the lake).
Lake Okabena does not meet state water quality standards due to high phosphorus levels. The Total Daily Maximum Load Study identified a 70% reduction in phosphorus from the watershed is needed to meet water quality standards. The City of Worthington owns the recently closed Prairie View Golf Course. Okabena Creek flows through the golf course and some small ponds. This project will modify these three ponds to increase storage and removal efficiency, and add an iron-enhanced filter bench to enhance soluble phosphorus removal.
This project will develop and present to the MN association of townships on stormwater best management practices and National Pollutant Discharge Elimination System (NPDES) stormwater permits.
Mille Lacs Lake is recognized as one of the premier walleye producing lakes in the world. The current water quality of the lake is good, however recent monitoring of the lake and its watershed indicates the potential to develop problems. Since 1997, the Mille Lacs Lake Watershed Management Group has worked to preserve the water quality of Mille Lacs Lake. Five priority projects were identified by the Group partners in an effort to preserve water quality. Support for these projects was provided by a grant from the Clean Water Fund.
This project will create a section on pretreatment settling practices in the Minnesota Stormwater Manual. The result will include case studies on pretreatment settling practices.
Water from an area in and near the interchange of US Highway 52 and MN Highway 55 spills onto a steep bluff face at the head of a ravine. This has accelerated the amount of sediment eroding from the ravine into the Mississippi River. In partnership with Dakota County, Dakota Soil and Water Conservation District, the City of Rosemount, Minnesota Department of Transportation, Flint Hills Resources, the Vermillion River Watershed Joint Powers Organization has been working for several years to identify a solution to this severe erosion problem.
This project is a cooperative initiative between the Prior Lake Spring Lake Watershed District, the City of Prior Lake, and the Scott Soil and Water Conservation District to implement on-the-ground Best Management Practices (BMPs) that will protect and improve water quality in Spring, Upper Prior and Lower Prior Lakes, water resources of local, regional, and state significance. Spring and Upper Prior Lakes are both impaired and have a completed Total Maximum Daily Load and Implementation Plan.
Regional public projects that are the focus of the proposed project include: Infiltration areas and a sedimentation pond enhancement in subwatersheds N3/N4; Parking lot storm drain rain gardens and a sedimentation pond enlargement in subwatersheds N5/N6; An infiltration area and a sedimentation pond enhancement in subwatersheds S9/S11; Ditch checks along Highway 13 in subwatershed 10.
The 400-mile stretch of the Mississippi River from its headwaters at Lake Itasca to Morrison County near Little Falls is the focus of this project. Working in cooperation with the eight member counties, this project will develop implementation plans and strategies geared specifically for the Mississippi River and incorporate them into the individual County Comprehensive Local Water Plans. These recommendations will be for specific strategies, often crossing county boundaries for implementation.
The Prioritization, Targeting, and Measuring Water Quality Improvement Application (PTMA) connects the general qualitative strategies in a Total Maximum Daily Load (TMDL) and Watershed Restoration and Protection (WRAP) and the identification of implementable on-the-ground Best Management Practices (BMPs). Leveraging geospatial data from the International Water Institute this application will be developed for two pilot areas within the Red River Basin.
This project will result in the development of three critical pieces of information. They include: 1. Development of restoration and protection strategies for all waterbodies in the district relative to the State's Non-point Source Funding plan 2. Use of PTMApp to tie the WRAPs implementation tables from the Buffalo and Red River Watersheds to targeted on-the-ground projects and practices that will provide measurable water quality improvements, and 3.
Completion of priority assessments to aid in implementing future projects. Three possible assessments have been identified for further consideration. The first is a subwatershed assessment in the South Fork Rush Creek subwatershed in Corcoran, which is adjacent to the previously completed Rush Creek Headwaters SWA. This would identify mainly agricultural BMPs for implementation in partnership with Hennepin County. The second is a feasibility assessment of re-meandering the outlet of Diamond Lake to Diamond Creek, which was identified in the Diamond Creek SWA.
Several lakes in the Shingle Creek watershed have been designated Impaired Waters for excess nutrients, and the Watershed Commission and cities continue to undertake BMPs to reduce total phosphorus and sediment to the lakes to help improve water quality. This project is the completion of subwatershed assessments in two priority areas to identify future BMPs addressing ongoing lake nutrient impairments. The areas are the drainage area to the Gaulke/ Memory Lane/ Hagemeister Pond system tributary to Middle Twin Lake; and the drainage area to Eagle Lake.