The goal of this project is to construct, calibrate, and validate a Hydrologic Simulation Program FORTRAN (HSPF) watershed model for the Otter Tail watershed. The contractor will produce a HSPF watershed model application(s) that can readily be used to provide information to support conventional parameter Total Maximum Daily Loads (TMDLs). The contractor will clearly demonstrate that this model generates predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen that are consistent with available sets of observed data.
This project contributed to the goals of the MN Prairie Conservation Plan by protecting 539 acres of prairie/wetland/savanna habitat; restoring 151 acres prairie/grassland; and enhancing 24,604 acres grassland/savanna. We will continue to implement subsequent Phases toward meeting the conservation goals described in the MN Prairie Conservation Plan.
Protect and restore 590 acres of significant wildlife habitat through conservation easements and restoration projects on private lands within Important Bird Areas with an emphasis on those located in within priority areas identified in the Minnesota Prairie Conservation Plan.
This project is for Minnesota Legislative Clean Water Fund funding to engage citizens in local watershed monitoring, to work with regional partners to promote understanding and protection of watersheds, and to organize and facilitate gathering of scientific data all for the benefit of water quality in the Red River Basin.
The purpose of this project is to improve understanding of primary productivity in the Red River and the diversity and population structure of the algal communities occurring along the river system. This will be accomplished through taxonomic identification of periphyton and phytoplankton assemblages necessary for characterizing responses to nutrient gradients along the Red River of the North.
An effective regulatory program is key to the successful implementation of local land use and water management plans. Yet, county, watershed, and other state, tribal, and local agencies charged with enforcement and permit review often work in silos and infrequently coordinate with each other or share information. This leads to higher enforcement costs, conflicts between agencies, redundancy of inspections, property owner frustration, and reinforces negative stereotypes of regulatory agencies.
Host second annual Lakes Country Water Festival; Update City website by adding WHP educational items; Rent a booth and provide WHP information at the Becker County Fair
This project will extend the simulation period for the Hydrological Simulation Program - FORTRAN (HSPF) models for the Grand Rapids, Brainerd, Crow Wing, Redeye, Long Prairie, Sartell, Sauk, St. Cloud, and Crow watersheds, and review and comment on the calibration.
This project will extend, calibrate, and validate watershed models using the Hydrological Simulation Program - FORTRAN (HSPF) watershed model for the Mississippi Headwaters, Leech Lake, Pine, and South Fork Crow Watersheds.
The Bird’s Eye Lake AMA acquisition has been completed. A portion of the land cost had come from this
appropriation, the 2016 Aquatic Habitat OHF appropriation, and by gifts matched with RIM Critical Habitat. This
tract consists of 52 acres, of which 5 acres are being reported on under this appropriation, as to not double count
acreage.