Above the Falls Regional Park, design and construct trail loops, river access areas, landscapes, storm water management. Includes site furniture, landscaping, utilities, survey and site investigations, design, engineering, and project management.
Design and construction of trail loops, river access areas, landscape and storm water management improvements at ATF RP. Project includes site furniture, landscaping, site utilities, survey and site investigations, design and engineering
Initial project was Design and Construction of a trail bridge over County State-Aid Highway 19 for the Lake Minnetonka LRT Regional Trail. 2015 Legislature amended project to "save trail crossing". PAT Legacy (F14-15) matched with $1,040,000 in federal funds.
Design and reconstruct approximately 12,300 lineal feet of bituminous trails in that portion of Hyland-Bush-Anderson Lakes Park Reserve managed by the City of Bloomington.
Design, engineer and reconstruct parking lots and driveways including demolition, grading, curb and gutter, paving, landscaping, parking lot lighting, trail lighting, utilities, retaining walls and associated storm water improvements at the Hyland-Bush-Anderson Lakes Regional Park Reserve, in particular, West Bush Lake Park. If project costs come in lower, City would utilize funds to install lighting on trail between Bandshell and Chalet parking lot.
Project will complete the design and engineering required for renovation of the bathroom buildings and the boat rental building within the main day-use recreation area of Baker Park Reserve
Design, engineer and reconstruct rest rooms building, maintenance garage, driveway, sidewalks, lighting, utilities, associated storm water improvements including demolition, grading, curb and gutter, paving, retaining wall construction and landscaping at the Hyland-Bush-Anderson Lakes Regional Park Reserve.
Design, engineer, and reconstruct the trail bridge between Nicollet Island and BF Nelson Park. The bridge is a crucial trail link along the Mississippi River
Design, engineer, and construct Hall's Island and the Park on the Scherer Site within Above the Falls Regional Park, based on the Metropolitan Council approved Master Plan for that park.
Design, engineer, and construct Hall's Island and the Park on the Scherer Site within Above the Falls Regional Park, based on the Metropolitan Council approved Master Plan for that park.
At Central Mississippi Regional Park, implement the master plan including design, engineering, and construction of trails, pedestrian/bicycle/vehicle circulation, landscaping improvements, ramps, stairs, and walls, buildings, stormwater management, historic resources, neighborhood connections, and natural habitat restoration.
Implement the Water Works portion of the 2015 Central Mississippi Regional Park master plan pending adoption by the Metropolitan Council. Work will include design, engineering, and construction of trails, pedestrian/bicycle/vehicle circulation, landscaping improvements, ramps, stairs, and walls, buildings, stormwater management, historic resources, neighborhood connections, and natural habitat restoration.
Project will complete the design and engineering required for renovation of the bathroom buildings and the boat rental building within the main day-use recreation area of Baker Park Reserve
Project will complete the design and engineering necessary to construct 3.4 miles of paved trail connecting Lowry Nature Center in Carver Park to Lake Minnetonka Regional Park
Design, Engineering, Construction Administration and Construction of 4.6 acres of paved parking lots and 1.5 miles of paved roads within Lake Minnetonka Regional Park.
Design, Engineering, Construction Administration and Construction of 4.6 acres of paved parking lots and 1.5 miles of paved roads within Lake Minnetonka Regional Park.
Project will complete the design and engineering necessary to construct 3.4 miles of paved trail connecting Lowry Nature Center in Carver Park to Lake Minnetonka Regional Park
To hire qualified engineers to develop design drawings for the heating, ventilating, and air conditioning (HVAC) system, in planning for installation at the Ames-Florida-Stork House, listed in the National Register of Historic Places.
This project determines ambient background per- and polyfluoroalkyl substance (PFAS) levels in urban and non-urban soils. This information will help Minnesota develop management strategies for PFAS contaminated soils.
To hire professionals to assess and write a collections plan for a historically significant collection, which will allow greater public access to this resource.
This project will address the critical need of Dakota and Ojibwe immersion schools to have a standardized system for determining reading levels for the Dakota and Ojibwe languages by developing an agreed upon method for assessing the readability of the languages.
The acquisition of high-resolution sonar data provides important information essential for mapping mussel habitat while having ecological applications useful to resource managers and policy makers protecting Minnesota threatened/endangered native mussels.
Central Mississippi Riverfront Regional Park, redevelop Boom Island & BF Nelson picnic area, including playground replacement, bike and pedestrian trails, wading pool. Central Mississippi Riverfront Regional Park, develop master plan. Central Mississippi Riverfront Regional Park, construct playground. A?
Minneapolis Chain of Lakes Regional Park, implement Brownie Lake Master Plan, develop a 1-mile trail and update lighting, vegetation, and drainage. Upgrade fishing facility, archery area.
Create a master plan for Minnehaha Parkway Regional Trail through extensive engagement with the community. Create a new master plan to provide direction for connecting more people to parks through future capital investment, and promote the park through its community engagement.