Project will complete the design and engineering required for renovation of the bathroom buildings and the boat rental building within the main day-use recreation area of Baker Park Reserve
Design, engineer and reconstruct rest rooms building, maintenance garage, driveway, sidewalks, lighting, utilities, associated storm water improvements including demolition, grading, curb and gutter, paving, retaining wall construction and landscaping at the Hyland-Bush-Anderson Lakes Regional Park Reserve.
Design, engineer, and reconstruct the trail bridge between Nicollet Island and BF Nelson Park. The bridge is a crucial trail link along the Mississippi River
Design, engineer, and construct Hall's Island and the Park on the Scherer Site within Above the Falls Regional Park, based on the Metropolitan Council approved Master Plan for that park.
Design, engineer, and construct Hall's Island and the Park on the Scherer Site within Above the Falls Regional Park, based on the Metropolitan Council approved Master Plan for that park.
At Central Mississippi Regional Park, implement the master plan including design, engineering, and construction of trails, pedestrian/bicycle/vehicle circulation, landscaping improvements, ramps, stairs, and walls, buildings, stormwater management, historic resources, neighborhood connections, and natural habitat restoration.
Implement the Water Works portion of the 2015 Central Mississippi Regional Park master plan pending adoption by the Metropolitan Council. Work will include design, engineering, and construction of trails, pedestrian/bicycle/vehicle circulation, landscaping improvements, ramps, stairs, and walls, buildings, stormwater management, historic resources, neighborhood connections, and natural habitat restoration.
Project will complete the design and engineering required for renovation of the bathroom buildings and the boat rental building within the main day-use recreation area of Baker Park Reserve
Project will complete the design and engineering necessary to construct 3.4 miles of paved trail connecting Lowry Nature Center in Carver Park to Lake Minnetonka Regional Park
Design, Engineering, Construction Administration and Construction of 4.6 acres of paved parking lots and 1.5 miles of paved roads within Lake Minnetonka Regional Park.
Design, Engineering, Construction Administration and Construction of 4.6 acres of paved parking lots and 1.5 miles of paved roads within Lake Minnetonka Regional Park.
Project will complete the design and engineering necessary to construct 3.4 miles of paved trail connecting Lowry Nature Center in Carver Park to Lake Minnetonka Regional Park
To hire qualified engineers to develop design drawings for the heating, ventilating, and air conditioning (HVAC) system, in planning for installation at the Ames-Florida-Stork House, listed in the National Register of Historic Places.
This project determines ambient background per- and polyfluoroalkyl substance (PFAS) levels in urban and non-urban soils. This information will help Minnesota develop management strategies for PFAS contaminated soils.
To hire professionals to assess and write a collections plan for a historically significant collection, which will allow greater public access to this resource.
This project will address the critical need of Dakota and Ojibwe immersion schools to have a standardized system for determining reading levels for the Dakota and Ojibwe languages by developing an agreed upon method for assessing the readability of the languages.
The acquisition of high-resolution sonar data provides important information essential for mapping mussel habitat while having ecological applications useful to resource managers and policy makers protecting Minnesota threatened/endangered native mussels.
Central Mississippi Riverfront Regional Park, redevelop Boom Island & BF Nelson picnic area, including playground replacement, bike and pedestrian trails, wading pool. Central Mississippi Riverfront Regional Park, develop master plan. Central Mississippi Riverfront Regional Park, construct playground. A?
Minneapolis Chain of Lakes Regional Park, implement Brownie Lake Master Plan, develop a 1-mile trail and update lighting, vegetation, and drainage. Upgrade fishing facility, archery area.
Create a master plan for Minnehaha Parkway Regional Trail through extensive engagement with the community. Create a new master plan to provide direction for connecting more people to parks through future capital investment, and promote the park through its community engagement.
We will determine the distribution, relative density, and spatial occupancy patterns of 3 small weasel species in Minnesota to fill key knowledge gaps in weasel distribution and status in Minnesota.
MNHS is working to engage Twin Cities youth in programming in order to increase their interest in history and the Minnesota Historical Society. MNHS promotes and recruits diverse students for programs that engage them in understanding how public organizations present historical narratives. One of these programs is the American Indian Museum Fellowship program (above). The funds also provide logistical support for diversity outreach efforts, which includes having tables at events and community engagement activities.
Minnesota's iconic northern forests, wetlands, and brushland habitats require management beyond basic forestry practices or at smaller scales than commercial operations work. Other enhancements, such as brushland shearing or mowing have low commercial value but high wildlife value. These additional habitat enhancements improve the quality of the forests for both wildlife and outdoor recreation.
We restored and enhanced a total of 40,539 grassland acres with 446 activities on Wildlife Management Areas, Scientific and Natural Areas, Native Prairie Bank easements, Waterfowl Production Areas, and National Wildlife Refuges.