To hire a qualified consultant to develop a Historic Structure Report that will help preserve Two Harbors Light Station, listed in the National Register of Historic Places.
To hire a qualified architect to conduct a condition assessment of the 1907 Duluth and Iron Range Railroad Company Depot, listed in the National Register of Historic Places.
To contract with qualified professionals to prepare construction documents for the preservation of the 1907 Duluth and Iron Range Railroad Company Depot, listed in the National Register of Historic Places.
The goal of this project is to assess groundwater sustainability in the I-94 corridor between the Twin Cities and St. Cloud due to the corridor's significant expected growth, the inerent natural limits of groundwater, and the vulnerability of groundwater to contamination.
Over the past 100 years, about half of Minnesota’s original 22 million acres of wetlands have been drained or filled. Some regions of the State have lost more than 90 percent of their original wetlands. The National Wetland Inventory, a program initiated in the 1970s, is an important tool used at all levels of government and by private industry, non-profit organizations, and private landowners for wetland regulation and management, land management and conservation planning, environmental impact assessment, and natural resource inventories.
This church, built in 1901 and listed in the National Register of Historic Places, had its electrical service updated. The main circuit breaker and subfeed panels were replaced. An outdoor electrical outlet was replaced and several more outlets were added to the interior. Larger supply wires were installed to improve capacity for future handicap accessible improvements to the building.
This project is for the editing the draft Watershed Restoration and Protection Strategy and Total Maximum Daily Load Reports resulting from comments received from Minnesota Pollution Control Agency and U.S. Environmental Protection Agency staff, preparing the documents for public notice, assisting with responding to public comments and preparing the final documents for final federal and state approval.
This project is for the editing the draft Watershed Restoration and Protection Strategy (WRAPS) and Total Maximum Daily Load (TMDL) reports resulting from comments received from Minnesota Pollution Control Agency and U.S. Environmental Protection Agency staff, preparing the documents for public notice, assisting with responding to public comments and preparing the final documents for final federal and state approval.
The purpose of this project is to gather data specific to developing a site-specific standard for phosphorus for Upper and Lower Red Lakes. These are large shallow lakes that are located in an area where no shallow lake standard exists. Because of these lakes' unique characteristics, it is believed that a site-specific standard is more appropriate than the deep lake standards that currently exist. This project will include additional chemistry and flow monitoring of tributaries to the lakes, as well as outflow of Lower Red Lake to the Red Lake River.
This project will provide the monitoring of reaches where there are data gaps, incorporate new data and analyze relevant data, identify pollutant sources, hold a stakeholder meeting, and gather information towards the future development of a Draft Restoration (TMDL) and Protection Plan.
The goal of this project is the completion of an Upper Mississippi River Bacteria Total Maximum Daily Load (TMDL) and Protection Plan. In addition, an Implementation Plan will be developed and finalized under this contract.
This project is part of a larger ‘Keep It Clean’ educational and waste disposal campaign organized by Beltrami Soil and Water Conservation District (SWCD) and involves local resorts, bait shops, and the Upper Red Lake Area Association (Association). The ‘Keep It Clean’ campaign is an attempt to educate ice fishermen that leaving trash and other waste on the lake ice is illegal and provide them with information and legal options for waste disposal, such as dumpsters placed near the ice road entrances.
The goal of this project is to gather and collect necessary watershed data for the development of a Watershed Restoration and Protection Strategy (WRAPS) for the Upper/Lower Red Lakes Watershed that includes impairments, their causes, and plans for restoration. Implementation of the WRAPS will maintain or improve water quality for the watershed.
Upper Red Lake is a large shallow lake located in north central Minnesota and is heavily used for fishing during the winter ice fishing season. In past years, as ice fishermen leave the lake via one of the 8 ice roads that are maintained by local resorts, bags of trash and human waste are left behind on the ice. Upper Red Lake is a productive fishing lake and it a protection priority in the Upper/Lower Red Lakes Watershed Restoration and Protection Strategy (WRAPS) report.
The Cannon River is a designated Wild and Scenic River that originates in Rice County and joins the Mississippi River 120 miles downstream near Red Wing. The Upper Cannon, which encompasses 29% of the entire watershed, has been identified as a priority subwatershed.
This project will support the monitoring of reaches where there are data gaps, incorporate new data and relevant data, continue identification of pollutant sources, complete load duration curves, coordinate and encourage participation in stakeholder meetings. The information gathered during Phase IIB will be utilized towards the development of a Draft Restoration (TMDL) and Protection Plan (Plan).
This project will extend the simulation period for the Hydrological Simulation Program - FORTRAN (HSPF) models for the Grand Rapids, Brainerd, Crow Wing, Redeye, Long Prairie, Sartell, Sauk, St. Cloud, and Crow watersheds, and review and comment on the calibration.
This project will extend, calibrate, and validate watershed models using the Hydrological Simulation Program - FORTRAN (HSPF) watershed model for the Mississippi Headwaters, Leech Lake, Pine, and South Fork Crow Watersheds.
Upper Mississippi, North Fork Crow River Major Watershed TMDL Project led by CROW with assistance from local partners North Fork Crow River Watershed District (WD); Middle Fork Crow River WD; Wright Soil and Water Conservation District (SWCD).
The primary goal of this project is to examine the calibration and validation of recently extended Hydrological Simulation Program – FORTRAN (HSPF) watershed models for the Mississippi River-Headwaters, Mississippi River-Grand Rapids, Mississippi River-Brainerd, Mississippi River-Sartell, Mississippi River-St. Cloud, Leech Lake, Pine River, Crow Wing River, Long Prairie River, and Redeye River watersheds and revise the calibration.
This project will develop a watershed restoration plan that provides quantitative pollutant load reduction estimates and a set of pollutant reduction and watershed management strategies to achieve water quality standards for all impairments within the watershed. It will also an important framework for civic and citizen engagement and communication, which will contribute to long-term public participation in surface water protection and restoration activities throughout the watershed.
This project is designed to complete an inventory and assessment of existing stormwater infrastructure in the cities of Two Harbors and Silver including mapping urban surface and sub-surface storm water flow to determine flow paths, pour points, and areas of limited storm water infrastructural capacity. The results of this assessment will be an assessment with prioritized and targeted opportunities for municipal infrastructure retrofits or best management practice installation on both public and private land.
To provide a program to honor Vietnam Vets from Pennington County. The fair will host a musician to perform at the fair, and with the help of the VFW and local Legion/Auxiliary, hold a program to honor veterans.