The goal of this project is to decrease nutrient loading in the lake and rivers within the Swan River Watershed. The Local Water Plan currently identifies surface water contamination and declining water clarity as a priority concern of Todd County. Agency members specifically identified the Swan River Watershed as an area of high priority for restoration efforts. Big Swan Lake is specifically mentioned for its roosting site for purple martins and for the unique wildlife resources it makes available in this subwatershed.
Residents in the Swan River Watershed have become increasingly concerned with their surface water quality. In an effort to reduce excess sediments and pollutants from entering surface waters, the Todd Soil and Water Conservation District will be identifying land owners in priority areas and working with them to install best management practices on lakeshore properties and feedlots within the watershed.Planned projects include: shoreland stabilization and restoration, river and lake bank stabilization, storm water controls, native plantings and livestock waste management projects.
This project will be a joint effort between the Todd Soil & Water Conservation District (SWCD) and the Sylvan Shores residents. Todd SWCD will organize and coordinate the project in full partnership with the Sylvan Shores residents. The actual monitoring will be a cooperative effort between Todd SWCD staff and citizen volunteers at Fawn and Pine Island Lakes.
The goal of this project is to reduce the number of vulnerable unused wells located within sensitive areas and to prevent potential groundwater contamination. This project will provide cost-share well sealing funds to target sealing of unused wells located in highly vulnerable areas within both the City of Faribault, and the City of Northfield's Drinking Water Supply Management Areas (DWSMA), and other vulnerable areas of Rice County.
A contractor with knowledge of Site Specific Standard development will respond to U.S. Environmental Protection Agency (EPA) questions and concerns regarding attainability of standards based on the BATHTUB model data. In addition, they will review technical memorandums developed by Minnesota Pollution Control Agency (MPCA) on aquatic life and aquatic recreational standard attainability.
RESPEC is a contractor with knowledge of site-specific standard development and will respond to United States Environmental Protection Agency questions and concerns regarding attainability of standards. The response will be based on bathtub model data and also a review of technical memorandums developed by the Minnesota Pollution Control Agency on aquatic life and aquatic recreational standard attainability.
The Sauk River watershed was selected to participate in the federal Mississippi River Basin Initiative (MRBI) program in 2010 to decrease nutrient contributions to the Mississippi River and the Gulf of Mexico. The MRBI program provides federal cost share funds to landowners to install conservation practices.
Thompson Lake is a shallow lake located in the City of West St. Paul, within the Lower Mississippi River Watershed Management Organization (LMRWMO). The 7-acre lake receives runoff from a 175-acre urban watershed that was developed in the 1950's and currently provides very little stormwater treatment. The eastern shoreline is within Thompson County Park, which features a fishing pier, event center, and miles of regionally connected trails. The west shoreline of the lake abuts the St. Croix Lutheran School.
The project will monitor nine key tributaries to the Long Prairie River for water chemistry and bacteria. The streams to be monitored include Eagle Creek, Turtle Creek, Moran Creek, Fish Trap Creek, an un-named creek which outlets to Lake Charlotte in the town of Long Prairie and three stream reaches of the Long Prairie River itself. All sites are located within Todd County with the exception of one which lies just over the border in Douglas County.
This project will inventory and conduct compliance inspections on Subsurface Treatment Systems (SSTS) around eight lakes in Todd County. Lakes to be inventoried include Big Sauk Lake, Big Swan Lake, Little Osakis Lake, Fairy Lake, Lily Lake, Long Lake, Little Birch Lake and Moose Lake. Approximately 1,200 parcels will receive compliance inspections. Systems that fail to meet standards will be brought into compliance using procedures available in rule and ordinance.
This project represents the third septic inventory effort by Todd County. The four lakes included - Guernsey, Juergans, Little Sauk, and Long Lakes - are all designated by the Sauk River Water District's Sauk Lake Management Unit as high priority for water quality improvement. Three of these lakes are listed as water quality-impaired for nutrients and the fourth - Long Lake - has had periodic e.Coli problems documented in several tributaries. This project will allow Todd County to expand on previous evaluations of 13 other lakes.
Todd County Septic Inspectors will research septic systems on 313 parcels that are located in the "highly vulnerable" portion of the City of Long Prairie's Drinking Water Supply Management Area. Each parcel's tanks and soil drain fields will be inspected for septic system compliance. Todd County will follow up with landowners found to have noncompliant systems in an effort to protect Long Prairie''s drinking water supply.
The SRWD, with assistance from local volunteers, will conduct water quality assessments on William Lake, Long Lake, Cedar Lake, Bass Lake. Felix Lake, Little Osakis Lake and Trout Creek to attain the necessary data to determine impairment status.
The proposed work will be the fifth septic inventory effort conducted by Todd County and will include eight lakes, 431 parcels, and 277 established addresses. Three of the lakes - Cedar, Long Higgens, and Pauley are located in the Sauk River Watershed District's Sauk Lake Management Unit which is a high priority for improvement. These are the last three lakes of any size to be completed in the Sauk River Watershed portion of Todd County. Nitrogen and phosphorus levels are an issue through the watershed and this management unit in particular.
This project will improve surface water quality within the sediment degraded Trout Brook, a designated trout stream and tributary to the Cannon River. The project will focus on the installation of best management practices that will reduce the amount of sediment transport within the watershed. Approximately 20 practices will be installed through this project which will reduce an estimated 2,000 tons of sediment per year.
This project will complete a chloride management plan which will lay out a strategy for addressing chloride impacts to our surface waters for the 7-county metropolitan area. This chloride management plan will satisfy EPA requirements for impaired waters, address waters not yet listed, and develop a strategy to protect waters that are currently meeting the water quality standards.
This project will provide the MPCA and all local partners in the Twin Cities Metropolitan Area (TCMA) the information and tools necessary to improve and/or maintain water quality with respect to chloride for the 7-county metropolitan area during the winter maintenace period.
This project is the second phase of updating the Two Rivers watershed Hydrologic Simulation Program FORTRAN (HSPF) model. This project includes calibration of the model and including a proposed impoundment in the model. An analysis of possible downstream water quality impacts will also be done.
The primary objective of this project is to extend the simulation period of the Two Rivers Watershed Hydrological Simulation Program FORTRAN (HSPF) model through 2017 to support future simulation and assessment of the planned Klondike impoundment.
The goals of Phase I of the TRW WRAP are to: 1) gather or develop watershed data needed for the development of the Watershed Restoration and Protection Strategy; and 2) establish project and sub-basin work groups, develop a social outcomes strategy, and develop a civic engagement evaluation strategy to guide the WRAP project.
The goal of this project is to assess groundwater sustainability in the I-94 corridor between the Twin Cities and St. Cloud due to the corridor's significant expected growth, the inerent natural limits of groundwater, and the vulnerability of groundwater to contamination.
This project will provide the monitoring of reaches where there are data gaps, incorporate new data and analyze relevant data, identify pollutant sources, hold a stakeholder meeting, and gather information towards the future development of a Draft Restoration (TMDL) and Protection Plan.
The goal of this project is the completion of an Upper Mississippi River Bacteria Total Maximum Daily Load (TMDL) and Protection Plan. In addition, an Implementation Plan will be developed and finalized under this contract.
The Cannon River is a designated Wild and Scenic River that originates in Rice County and joins the Mississippi River 120 miles downstream near Red Wing. The Upper Cannon, which encompasses 29% of the entire watershed, has been identified as a priority subwatershed.
This project will support the monitoring of reaches where there are data gaps, incorporate new data and relevant data, continue identification of pollutant sources, complete load duration curves, coordinate and encourage participation in stakeholder meetings. The information gathered during Phase IIB will be utilized towards the development of a Draft Restoration (TMDL) and Protection Plan (Plan).
This project will extend the simulation period for the Hydrological Simulation Program - FORTRAN (HSPF) models for the Grand Rapids, Brainerd, Crow Wing, Redeye, Long Prairie, Sartell, Sauk, St. Cloud, and Crow watersheds, and review and comment on the calibration.
This project will extend, calibrate, and validate watershed models using the Hydrological Simulation Program - FORTRAN (HSPF) watershed model for the Mississippi Headwaters, Leech Lake, Pine, and South Fork Crow Watersheds.
Upper Mississippi, North Fork Crow River Major Watershed TMDL Project led by CROW with assistance from local partners North Fork Crow River Watershed District (WD); Middle Fork Crow River WD; Wright Soil and Water Conservation District (SWCD).
The primary goal of this project is to examine the calibration and validation of recently extended Hydrological Simulation Program – FORTRAN (HSPF) watershed models for the Mississippi River-Headwaters, Mississippi River-Grand Rapids, Mississippi River-Brainerd, Mississippi River-Sartell, Mississippi River-St. Cloud, Leech Lake, Pine River, Crow Wing River, Long Prairie River, and Redeye River watersheds and revise the calibration.
This project will develop a watershed restoration plan that provides quantitative pollutant load reduction estimates and a set of pollutant reduction and watershed management strategies to achieve water quality standards for all impairments within the watershed. It will also an important framework for civic and citizen engagement and communication, which will contribute to long-term public participation in surface water protection and restoration activities throughout the watershed.
The VRWJPO is pursuing a Watershed Restoration and Protection Strategy (WRAPS) project in cooperation with the MPCA in order to better identify the sources of stress and impairment to the river, tributaries, and lakes and evaluate the feasibility of reaching water quality goals, and properly allocating pollution reduction goals to those areas identified as likely pollution sources. Successful restoration and protection outcomes are dependent on successful community building and ownership of both the problems and solutions identified in the WRAPS.
The goal is to develop the Watershed Restoration and Protection Strategy (WRAPS) and a public and stakeholder participation process that encourages local involvement in water quality discussions and solutions, identifying impaired waters, developing Total Maximum Daily Loads (TMDLs); and planning, setting priorities, and implementing the WRAPS recommendation to restore impaired waters. Phase II of the WRAPS will consists of developing TMDLs for the impaired reaches as well as developing the final WRAPS document and implementation planning.
The purpose of this project is to complete subwatershed analysis for Cannon River and Vermillion River sub-watersheds to prioritize and target Best Management Practices based on cost-effectiveness with regard to pollutant reduction. This process is intended to proactively assist local water management and partner agencies in maximizing the value of each dollar spent to improve water quality in the respective rivers.
Tetra Tech will work to support the science needed when planning in Minnesota for water storage practice implementation. The goal is to provide practical water storage recommendations that can be incorporated into smaller scale planning within major watersheds (HUC 8), as well as larger scale planning for the Sediment Reduction Strategy for the Minnesota River and South Metro Mississippi River.
The Metropolitan Council was awarded $1,250,000 from Minnesota Clean Water, Land and Legacy Amendment funds for a Water Efficiency Grant Program during the Minnesota Legislature's 2021 First Special Session. The Metropolitan Council (Council) implemented a water efficiency grant program effective July 1, 2022 to June 30, 2024. Grants were awarded on a competitive basis to municipalities that are served by a municipal water system. The Council provides 80% of the program cost; the municipality must provide the remaining 20%.
This is a joint project between the United States Geological Survey (USGS), Minnesota Pollution Control Agency (MPCA), North Dakota, and Manitoba. The project is a basin-wide, up-to-date water quality trend analysis using the "QWTrend" program for approximately 40 bi-national river sites to review nutrients, total suspended solids, total dissolved solids, sulfate and chloride from 1980 - 2015.
This program supports communities as they plan and implement projects that address emerging drinking water supply threats. It supports the exploration cost-effective regional and sub-regional solutions, leverages inter-jurisdictional coordination, and prevents overuse and degradation of groundwater resources.
This proposal will fund technical assistance for nutrient management planning to accelerate water quality improvements with the 12-county West Central Technical Service Area (WCTSA). A needs assessment identified an estimated 156 certified nutrient management plans that will be needed over a 3 year period. Of the 71 SWCD employees in the WCTSA, only 1 SWCD staff member is dedicated to nutrient management planning. To meet technical assistance needs, this grant will fund a Regional Planning Specialist (RPS) to address local resource concerns.