Tetra Tech will work to support the science needed when planning in Minnesota for water storage practice implementation. The goal is to provide practical water storage recommendations that can be incorporated into smaller scale planning within major watersheds (HUC 8), as well as larger scale planning for the Sediment Reduction Strategy for the Minnesota River and South Metro Mississippi River.
The Metropolitan Council was awarded $1,500,000 from Minnesota Clean Water, Land and Legacy Amendment funds for a Water Efficiency Grant Program during the Minnesota Legislature's 2023 Session. The Metropolitan Council (Council) implemented a water efficiency grant program effective July 1, 2024 to June 30, 2026. Grants were awarded on a competitive basis to municipalities that are served by a municipal water system. The Council provides 80% of the program cost; the municipality must provide the remaining 20%.
To hire a qualified consultant to develop architectural drawings for Bridge L3275 (Waterford Bridge), listed in the National Register of Historic Places.
To contract with qualified professionals to prepare construction documents for the preservation of Wayzata Section House, listed in the National Register of Historic Places.
Improved the safety and the environment for historical artifacts by separating an exhibit fabrication area.
An old coal room was retrofitted with a compatible reuse where the intake has been reversed to exhale. This special facility will enable the Winona County Historical Society to be more intentional and responsive with its exhibits, which before the addition were fairly static. Their stated intention in the final report is to have exhibits that change more often and therefore prompt the Society’s building to be used a more frequent gathering space.
This project will educate and assist landowners to seal unused wells by providing cost-share funds of 50% up to $1,000 per well located in highly vulnerable groundwater areas in 10 southeast Minnesota counties. Groundwater is the primary source of drinking water and due to the karst geology in SE MN groundwater is more vulnerable to contamination.
Over the past five years, awareness of our organization has spread across the state. As a result, our attendance numbers have grown by 66%. We regularly hit max capacity, and the demand for outreach programs has gone up. Ex-S.T.R.E.A.M. expansion addresses three specific elements: 1) New space: Renting an additional 2,800 sq. ft of exhibit space to address spatial constraints.
Our project aims to better understand white-tailed deer movement, habitat use, and disease dynamics at the suburban/agricultural interface to inform more efficient deer management and disease control.
Within Whitewater River Watershed, groundwater is the primary drinking water source for both private and community wells. These drinking water aquifers often lack adequate protective layers making them vulnerable to contamination. Unused wells can deteriorate and pose a serious risk to groundwater quality by providing a pathway for contaminants from the surface to easily travel into groundwater. This project will use cost-share funds to incentivize sealing twelve abandoned wells that are contamination risks to vulnerable aquifers.
This program acquired, developed, and added 638 acres to the state Wildlife Management Area (WMA) system. These lands protect habitat and provide opportunities for public hunting, trapping and compatible outdoor uses consistent with the Outdoor Recreation Act (M.S. 86A.05, Subd.8).
This program acquired priority lands and developed them as Wildlife Management Areas (WMA) - six parcels protected totaling over 600 acres, Scientific and Natural Areas (SNA) - one parcel of 900 acres (287 acres credited to this funding ), and Native Prairie Bank (NPB) easements - two parcels totaling almost 200 acres. These lands protect habitat and some provide public hunting, trapping and compatible outdoor uses.
This grant will fund about 45 projects in High Groundwater Priority areas, High Surface Water Priority area, and/or in sub-watershed with stressed/impaired streams for the four WinLaC planning regions. These practices will reduce overland total nitrogen loading and loading to groundwater; reduce overland total phosphorous and sediment; and increase headwater storage and/or reduce peak flow rates and sediment loading.
The WinLaC Prioritization and Public Participation Project will identify priority water quality issues and concerns for the watershed approach in the Mississippi River - Winona and La Crescent watersheds. Information obtained from this project will help develop the Watershed Restoration and Protection Strategy (WRAPS) Update report as well the WinLaC Comprehensive Watershed Management Plan.
This project will produce a final Total Maximum Daily Load (TMDL) report and Watershed Restoration and Projection Strategy (WRAPS) reports for the Winnebago and Mississippi River – La Crescent watersheds including the drafting of public notice versions of the reports, responding to comments during the public notice period and producing the final TMDL and WRAPS reports.
To hire a qualified consultant to develop a Historic Structure Report that will help preserve the Winona Public Library, listed in the National Register of Historic Places.
To restore the battlement on the Winona Armory, listed in the National Register of Historic Places, and currently used as the Winona County History Museum.
Four individual national register nomination forms were prepared for Central, Madison, Jefferson and Washington-Kosciusko elementary schools located in the city of Winona. A qualified historian was hired to prepare the documentation. The schools had been previously evaluated and found to be eligible for nomination.
The Winona County Well Sealing Costshare Program will utilize Clean Water Funds to speed water well sealing in a continuing effort to protect the groundwater aquifers used for drinking water in Southeast Minnesota. Since 1990, 1303 unused water supply wells have been sealed in Winona County with costs ranging from $500-$10,000+ per well.