We will partner with urban municipalities and school districts to support planting of climate-resilient tree species. Activities include planting trees, gravel bed nursery creation, tree assessment and mapping, and community.
Once thought to have an essentially inexhaustible groundwater supply, Minnesotans are now realizing our rates of use are regionally unsustainable. Recent advanced modeling by the MN DNR and Metropolitan Council of aquifer supplies, in conjunction with predicted demand, indicate the major metropolitan area aquifers are currently subject to extraction rates that exceed recharge. Simply stated, we are mining our groundwater.
The goal of this project is to use a science-based and participatory approach to understanding and promoting conservation practices in the agricultural community.
Asian Media Access (AMA) will embark on a capacity-building project aimed at cultivating individual donors from Asian American and Pacific Islanders (AAPIs) and the public, and encompasses a multifaceted approach to enhance grant writing, reporting, nonprofit management, and fundraising capabilities. Key activities include: 1) train and assist board/staff on grant writing and reporting; 2) build internal expertise in grant writing and reporting by obtaining consultation and training from experts in Donor Solicitation.
To enhance nonoprofit arts groups' ability to serve the artistic cultural and geographic diversity of the metro area through grants for minor capital improvements equipment and supplies.
Revitalizing the old deer yards into Caribou Yards is a transformative initiative aimed at creating habitats for a herd of caribou. The need for this project arises from the closure of the old deer yards, which were previously inhabited by white-tailed deer until the last one passed away of old age. Subsequently, the fencing surrounding these three habitats has weathered and suffered damage during the years of inoccupancy.
This project addresses the identified need for an Implementation Plan that provides an overall roadmap for the effort it will take to meet the Carnelian Marine St. Croix Multi-Lakes Total Maximum Daily Load (TMDL). An Implementation Plan will be developed, with involvement of the Project Partners and stakeholder groups, that sets forth prioritized strategies for attaining the TMDL and a method for tracking the progress of those efforts. The Implementation Plan will be restoration-focused, but will include protection-oriented information/actions as well.
Continued TMDL project to support next phases associated with completion of TMDL's for ten lakes in the Carnelian Marine Saint Croix Watershed District (CMSCWD). Ten lakes are; East Boot, Fish, Goose, Hay, Jellum’s, Long, Loon, Louise, Mud and South Twin.
This project targets stabilizing 900+ feet of eroding shoreline in the Cedar Lake Farms Regional Park converting it into a healthy native buffer on Cedar Lake.The project addresses phosphorus loading by reducing erosion from unstable shoreline banks adjacent to Cedar Lake. This will increase infiltration, intercept upland runoff, and stabilize the soil at the water's edge to decrease erosion and the addition of phosphorus into the lake. It is estimated that a shoreline stabilization at Cedar Lake will reduce 12-25 lbs/ year phosphorus depending on the regression rate.
The Children’s Museum of Southern Minnesota (CMSM) will build upon a strong foundation of Minnesota Arts, Culture and Heritage (ACH) learning experiences made possible with prior MN Legacy funding support to:
This project is for Cycle 2 of the Intensive Watershed Monitoring (IWM) process for the Lower St. Croix Watershed. Seven stream sites will be monitored by the Isanti Soil and Water Conservation District (SWCD), Anoka Conservation District, and Chisago SWCD. Sampling will be conducted in 2019 and 2020 and Chemistry and field observation data will be taken.
Completion of the activities in the previously-funded project. The project will result in the construction of an approximately 7200 s.f. maintenance shop and administrative office, replacing an existing inadequate facility. Project activities include demolition, design, engineering, construction, construction administration and other related construction costs
This project represents a one-time opportunity to improve the quality of stormwater runoff from the parking lot and access road at Cleary Lake Regional Park. Cleary Lake is listed as impaired for excessive nutrients and is a focal point for many park activities. Three Rivers Park District and Scott County are partnering to reconstruct the park access road and to mill and overlay or conduct full depth reclamation of the parking lot at the park in 2013. Other partners include the Scott Watershed Management Organization (Scott WMO) and the Scott County Public Works Department.
Rising temperatures and increased precipitation contribute to decreased oxygen and increased methane in Minnesota lakes and wetlands. We will identify impacts on water quality and methane emissions, providing management guidance.
Understanding interconnected social justice histories is foundational to build solidarity with Black, Indigenous, People of Color (BIPOC) communities to address systemic inequalities. LinkingLeaders Partnership will integrate solidarity practices by creating and integrating resources, tools, and modules for teaching BIPOC histories in our programs. Resources will be shared as models for practicing solidarity to be used and adapted by others doing solidarity and racial justice equity work.
The project helps put The Landing back on a professional collections management footing after a disastrous fire several years ago that destroyed all of their inventory information.
The grant allowed them to start making an inventory of the twenty-five buildings that make up The Landing including recording the condition and location of the collection.
Building on past efforts to catalog collections, the Three Rivers Park District continued the assessment and inventory of collections at The Landing in Shakopee. Inventories of 1, 015 artifacts from six (6) individual structures: the Wilkie House; the Graffenstadt House; the Kahl House; the Harms House; the Bank, and the Boesel "Red" Barn were conducted. All artifact information was recorded by PastPerfect software.