The Minneapolis American Indian Center has developed a long term plan to increase accessibility to and interest in Native language instruction through increased access to Dakota and Ojibwe language tables, monthly family nights, field trips and other cultural activities.
The Minneapolis American Indian Center has developed a long term plan to increase accessibility to and interest in Native language instruction through increased access to Dakota and Ojibwe language tables, monthly family nights, field trips and other cultural activities.
To replace the roof and install insulation for the Minneapolis Public Library, North Branch, listed in the National Register of Historic Places, and now used as a career and technology center.
1. Offer as many children as possible the chance to be immersed in the Dakota Language. This includes prioritizing children of Dakota heritage, children with Dakota language connections, and children with other tribal affiliations. Ensure families feels safe, welcome, and included in the language learning process and in the shaping of future programming. 2. Build a network of Dakota Language educators through collaborative teaching, including language experts, elders, and early childhood teachers. 3.
Install drain tile and regrade window wells slopes to stabilize the Grain Belt Office building, which is listed in the National Register of Historic Places.
The purpose of this project is to conduct a subwatershed assessment of that part of the City of Minneapolis that is within the Shingle Creek watershed. This subwatershed drains to three Impaired Waters: Crystal Lake, Ryan Lake, and Shingle Creek. The assessment will identify the most feasible and cost-effective best management practices for retrofit in this densely urban, fully developed subwatershed. The project includes workshops with neighborhood organizations to help them educate residents and organize implementation projects.
This project will complete an EPA- and MPCA-approved TMDL Study and an MPCA-approved TMDL Implementation Plan that provide quantitative pollutant load reduction estimates and a set of pollutant reduction and watershed management strategies to achieve water quality standards for all impairments within the watershed, that are understood and adoptable by local units of government and other stakeholders.
Design, engineer, and construct rehabilitation projects associated with existing trails, bridges, habitat enhancement, stormwater management and water quality infrastructure, and signage. Projects will be determined through community participation in a master planning process. This funding is a continuation of several years of Parks and Trails Funds dedicated to this project.
Continue rehabilitation of Minnehaha Regional Park Pavilion to upgrade public spaces including restrooms, open seating areas, plaza spaces, stairs, ramps, and landscaping. Work will include design, engineering, architecture, and construction.
The City of St. Louis Park, in partnership with the Minnehaha Creek Watershed District, is proposing to re-meander a portion of the creek using funding provided through the Clean Water Fund. The affected section of Minnehaha Creek was straightened when development first came to St. Louis Park in the early 1900s. At that time, wetlands were filled and the stream channel was
altered to allow for industrial development around the creek.
Both Minnehaha Creek and Lake Hiawatha are on the State Impaired Waters List and have had Total Maximum Daily Load Studies completed. The proposed work would focus on park land along Minnehaha Creek which is a highly-recreated corridor with public trail systems throughout. In 2014, the District experienced record flooding resulting in substantial erosion and tree loss along Minnehaha Creek. In 2015, the District completed an assessment of flood damage and received FEMA funding for bank repair at 31 sites along the Creek within Minneapolis Park and Recreation Board property.