To support teachers in addressing new science standards , we propose a series of workshops across Minnesota facilitating conversation about sustainability and water conservation, specifically integrating western science and Indigenous perspectives.
This project will assess lakes and streams in the Cannon River watershed that have not been assessed to determine if they are meeting their designated uses. Some of these lakes and streams have data for certain pollutants, but not enough to complete an impairment assessment. The river and stream reaches are located in Dakota, Goodhue, Le Sueur, Rice, Steele, and Waseca counties. The lakes are located throughout the Cannon watershed (Le Sueur, Rice and Waseca Counties). This project will be a continuation of past assessments conducted in 2007 and 2009.
This project involves monitoring three data deficient lakes in the Crow Wing River Watershed and one stream site at the inlet to White Earth Lake. The data deficient lakes were on the MPCA Targeted watershed list. After getting the required assessment dataset for these lakes, all targeted lakes in Becker County will be completed for this assessment cycle. The stream site is a site that the White Earth Lake Association and the Becker Coalition of Lake Associations (COLA) will monitor. It is the inlet to White Earth Lake.
This project will include stream monitoring of six preselected sites from the Leech Lake Watershed (HUC 07010102) and Pine River Watershed (HUC 07010105). The sites will be monitored for chemical, physical and biological parameters for two years.
The Zumbro River Watershed is a major watershed in the Lower Mississippi River basin in SE Minnesota. It includes parts of six counties, covering 910,291 acres. This project will assess all 13 stream reaches in the Zumbro River Watershed to determine if they are meeting their designated uses. The monitoring will entail collecting water chemistry and field parameters.
This project will collect water quality data for 13 Hubbard County lakes located in the Crow Wing priority watershed and identified as priority lakes by the MPCA. Upon completion the project data set will include all of the necessary information for the lakes to be assessed for impairment due to nutrients. Volunteers will collect samples from 7 of the 13 lakes and paid SWCD staff will collect samples from 6 of the lakes that do not have public access or volunteers willing to sample. The water samples will be collected 5 times/year June-September in 2010 and 2011.
Rice County Water Resources Division will complete a Surface Water Assessment for six lakes located in the Cannon River Watershed. The lakes chosen include: Sprague Lake (66-0045-00), Mud Lake (66-0054-00), Hatch Lake (66-0063-00), Pooles Lake (66-0046-00), Logue Lake (66-0057-00), and Phelps Lake (66-0062-00). Each lake chosen is currently unassessed, and both Sprague and Mud lake are priority lakes for testing. Sampling will include testing dissolved oxygen, temperature, pH, Secchi, Total phosphorus, and chlorophyll-a. The samples will be taken by volunteers and paid staff.
Hubbard, Crow Wing, and Cass County Land Departments and Soil and Water Conservation Districts (SWCD) will partner to acquire 300 acres (public access) and place easements on 240 acres of private high-quality forest, wetlands, and shoreline in the Northern Forest Ecological Section. This project is integrating county land management goals and parcel selection into the 75 percent protection watershed goal (Phase 1 Watershed Grant).
To be able to manage resources in the Blue Earth and Le Sueur Watersheds into the future and have a positive effect on water quality, resource managers need high quality accurate data to support decision making of best management practice (BMP) implementation. Digital elevation data is a valuable resource for modeling water flow, however in its current state it cannot represent water conveyance through features such as roadways. These flow barriers limit the accurate use of data for recently developed targeting tools identifying BMP suitability and effectiveness down to the field scale.
The Crow Wing Soil and Water Conservation District partnered with Cass SWCD, Hubbard SWCD, and the Board of Water and Soil Resources to permanently protect 239.6 acres of upland forest land, wetlands, and shorelines to develop larger habitat blocks. We worked with seven landowners in total to complete seven RIM easements - acres by county Cass: 117 acres, Crow Wing 34 acres, and Hubbard 87 acres. Partners met regularly; the regional committee completed the final application recommendations to move forward into the RIM easement process.
A new GIS technician will help prioritize and target conservation activities and protection strategies in nine north-central Minnesota counties. The GIS technician will create GIS products, assessments, and watershed analysis to identify the high priority areas in each County or watershed in need of protection or restoration using all available data, including LiDAR, soils, land use, completed WRAPS and other datasets. These areas will then be targeted for future resource management efforts, Clean Water Fund projects, and additional conservation activities.
The Children's Discovery Museum in Grand Rapids, Minnesota will increase access and deepen engagement with their effectively proven School Service Program. The museum will take down the economic barriers and increase enrollment. This grant will fund more educators and facilitators, curriculum development, scholarship aid, transportation assistance and art/teaching supplies.
This project will build off the success of the additional geographic information system (GIS) and water planning expertise the TSA8 added in 2016 to provide consistent mapping, water planning assistance and training to partners. This project will help soil and water conservation districts prepare for the 1W1P process before the planning starts. A unified protection methodology is essential for the 1W1P process to be successful. This project will include: unified GIS mapping and protection model for all nine counties respectively.
Turtle Island Skywatchers - Innovative Research and Data Visualization project works to protect Minnesota water, wildlife, and natural resources while empowering Indigenous youth as leaders and all citizens as researchers.
We will reconstruct historical lake conditions to identify factors linked to successful walleye fisheries and guide effective management in the face of warming temperatures, invasive species, and nutrient loading.
Minnesotans increasingly value native fishes. For example, >95% of bowfished species in MN are native, yet all are poorly understood. Foundational natural resource data is absolutely necessary for all stakeholders.
Our goals are to engage 100,000 underserved youth statewide in environmental education, engaging them in the conservation and preservation of Minnesota wilderness through the experiences in the outdoors.
This project will provide the monitoring of reaches where there are data gaps, incorporate new data and analyze relevant data, identify pollutant sources, hold a stakeholder meeting, and gather information towards the future development of a Draft Restoration (TMDL) and Protection Plan.
The Cannon River is a designated Wild and Scenic River that originates in Rice County and joins the Mississippi River 120 miles downstream near Red Wing. The Upper Cannon, which encompasses 29% of the entire watershed, has been identified as a priority subwatershed.
This project will extend the simulation period for the Hydrological Simulation Program - FORTRAN (HSPF) models for the Grand Rapids, Brainerd, Crow Wing, Redeye, Long Prairie, Sartell, Sauk, St. Cloud, and Crow watersheds, and review and comment on the calibration.
This project will extend, calibrate, and validate watershed models using the Hydrological Simulation Program - FORTRAN (HSPF) watershed model for the Mississippi Headwaters, Leech Lake, Pine, and South Fork Crow Watersheds.
The primary goal of this project is to examine the calibration and validation of recently extended Hydrological Simulation Program – FORTRAN (HSPF) watershed models for the Mississippi River-Headwaters, Mississippi River-Grand Rapids, Mississippi River-Brainerd, Mississippi River-Sartell, Mississippi River-St. Cloud, Leech Lake, Pine River, Crow Wing River, Long Prairie River, and Redeye River watersheds and revise the calibration.
Use mobile AI-assisted technologies to survey lake visitors. Assess perceptions of water quality and perceived threats. Combine survey data with water quality data and trend monitoring to inform lake management.
Minnesota Sea Grant seeks to create a science-policy fellowship program to train Minnesota's science-policy workforce and advance Minnesota's water resource policy, emulating Sea Grants successful federal-level fellowship program.
We propose robotics-based educational activities for middle-school youth on water quality in Minnesota. Youth will gain skills for measuring water quality and communicating results through group study and hands-on projects.
This project will educate and assist landowners to seal unused wells by providing cost-share funds of 50% up to $1,000 per well located in highly vulnerable groundwater areas in 10 southeast Minnesota counties. Groundwater is the primary source of drinking water and due to the karst geology in SE MN groundwater is more vulnerable to contamination.
Twenty six easements protecting 1,173.3 were recorded which exceeded the original proposal by 173 acres (15%). 11.6 miles of shoreline were protected which exceeded the 8 acre goal by 30%. Total expenditure was $1,355,000 which was 17% lower than originally budgeted. No fee-title land acquisition opportunities on wild rice lakes that fit within DNR and other government agency land plans were available during this time period thus DU did not expend any of the $100,000 budgeted for fee-title acquisition. Instead the program focused on RIM easements.
This Phase III continuation of the Wild Rice Shoreland Protection project acquired 98 acres for Yaeger Lake Wildlife Management Area (total acquisition was 285 acres but a portion was funded with other LSOHC money, only the portion funded with this grant is reported here) and 14 RIM easements protecting 600 acres for a total of 698 acres of wild rice shoreland habitat in the Northern Forest Section. This exceeded this Phases overall goal by acres for RIM.
This program acquired priority lands and developed them as Wildlife Management Areas (WMA) - six parcels protected totaling over 600 acres, Scientific and Natural Areas (SNA) - one parcel of 900 acres (287 acres credited to this funding ), and Native Prairie Bank (NPB) easements - two parcels totaling almost 200 acres. These lands protect habitat and some provide public hunting, trapping and compatible outdoor uses.